| Field | Type / default | Meaning |
|---|---|---|
| Source | CAD drawing session (all floors) or project hub | |
| Name of work, location, client, prepared by | printed on the Summary | |
| Point-wiring group | A / B / C by building type (CPWD General Specifications) | |
| Conduit, switches, LED class and body | pick the matching DSR items | |
| Cost index, CPOH %, GST % | editable again in the Excel Summary | |
| DSR item per line | automatic by rules, or your own choice — remembered |
| Output | Content |
|---|---|
| Preview | every BOQ item with its DSR item, quantity, rate and amount |
| Excel (5 sheets) | Summary, BOQ, Take Off, Rate Analysis DSR, Rate Analysis Non-DSR — every total a formula |