Design Link calc Power distribution design
Sizing rules Changes apply to every feeder set to Auto. Per-feeder Cond. overrides these.
# FromToLinkPhaseLoad kW · DFLength mLaying · kCond.FS Cable auto unless chosenRuns Ib ABreaker A · typeIz2 AVD %Cumul. %Limit %Status

Blue columns are inputs. Leave Cable as Auto and Runs blank to let the engine choose (size first, extra runs only when the maximum size cannot pass). Choose a cable to override; click to protect a row from Fix-all.

Single-line cascade: panel loads are Σ outgoing × DF; each branch shows cable × runs, segment VD and cumulative VD (red = over limit). AUTO SLD →

Cable bill of quantities

System & derating

Voltage-drop cascade limits

Auto-sizing rules

Design checks — IS 732 / IEC 60364

Derating — current-rating correction factors

Installation (laying) methods

Preset notes

NameCoresSize sqmmMaterialFSLayingR Ω/kmX Ω/kmIr APrice ₹/m

Edited catalogue is saved with this project only. Name format must stay 3.5C X 300 Sq.mm, AL (In Air) so imports match.

Bus ducts (sandwich type)

NameRating AMaterialR mΩ/mX mΩ/mMake / ref

Typical values are shipped as a starting point; replace R and X with the manufacturer's data sheet (per phase, at operating temperature). Saved with this project.

Fault levels at every bus for every supply scenario (IEC 60909), the governing constraint of every cable and the breaker Icu. Run the integrated design after changing the sources, the schedule or the settings.

Press Run integrated design.

HT cables from the HT panel to each transformer (and the utility incomer): ampacity with derating, short-circuit withstand for the HV clearing time, screen withstand, voltage drop.

Enable an HT supply in Source of supply and run the design.

Single-line diagram resolved from the sources, the main panel sections and couplers, the DG synchronising panel and the feeder schedule.

Preview the SLD model here.

Formulas

3φ: Ib = kW / (√3 × V × pf)  ·  Vd = √3 × Ib × L × (R·cosφ + X·sinφ) / (1000 × runs)  ·  Vd% = Vd / V × 100
1φ: Ib = kW / (Vph × pf)  ·  Vd = 2 × Ib × L × (R·cosφ + X·sinφ) / (1000 × runs)  ·  Vd% = Vd / Vph × 100  (Vph = V/√3)
Iz2 = runs × Ir × k1 × k2 × k3

Cascade

Panels that never appear in the To column are treated as sources (e.g. MAIN LT PANEL, MAIN FIRE EM PANEL). Their outgoing feeders are checked against the first-hop limit. Every feeder below is checked against the total limit at that point. A bus-duct link is calculated like a cable — Vd = √3·Ib·L·(R·cosφ + X·sinφ) with the bus duct's R and X (mΩ/m) — and checked against its VD allowance (default 2%, editable per link); the rating is auto-picked (smallest ≥ Ib that meets the allowance) or chosen from the list. Downstream feeders share the remaining budget. Bus duct impedances are typical sandwich-type values; replace with manufacturer data.

Standards applied

Voltage drop and cable selection per IS 732 / IEC 60364-5-52 (derating k1·k2·k3, Ib ≤ In ≤ Iz), cable data per IS 1554 / IS 7098, cascade limits per CPWD General Specifications, breaker classes per IEC 60947-2 / IEC 60898, fire/essential segregation per NBC 2016. Full list below.

Auto-sizing

For each feeder the smallest cable that carries Ib after derating and keeps the cumulative drop within limit is selected — copper up to the configured size, aluminium above it, never larger than the maximum size. Only if the maximum size still fails are parallel runs added. Fix all repeats this along failing chains, upsizing the segment that gives the largest drop reduction first.