Design Linkcalc.designlink.in

BMS / SCADA — I/O point summary

Sample project — Tower A · detailed profile · 15 % spare
Generated 28 Nov 2026 16:09
Equipment schedule → point templates → I/O summary, field devices, soft-integration composition
Project code SAMPLE
Systems
19
Units
246
Hardwired I/O
990
With 15 % spare
1,140
Soft points
27,262
Field devices
213
Alarm points
25,396

1. Basis

ItemValue
SystemBMS / SCADA
Template profiledetailed
Spare on hardwired points15 % per type, rounded up per system
ProtocolsBACnet/IP · BACnet MS/TP · Modbus RTU (RS-485)
Code regimeIndian — NBCS 2026 (SP 7:2026), which replaced NBC 2016 on 30 Apr 2026

2. System-wise summary (including spare)

SrSystemLocationQtyAIDIAODOSIHardwiredTotal incl. spare
1Water-cooled chillerTower A · B2 · Plant room3253302115079242
2Primary chilled-water pump (VFD)Tower A · B2441244602489
3Cooling tower cellTerrace37210903745
4Air handling unit — floor mountedTower A121201323612240300586
5Fan coil unit6000006000600
6Smoke / exhaust fan — fire-rated axialB180165000165190
7Staircase pressurisation fan401200121226
8Domestic water transfer pumpB2206020810
9Water tank level monitoring66120001821
10Fire-fighting pump set (main, standby, jockey, sprinkler)129600098114
11Fire alarm system interface1010025000125002
12Lift monitoring6060090697
13UPS system2060050657
14HT breaker (33 kV / 11 kV)401200801294
15Power / distribution transformer24120001619
16LT main ACB / bus coupler / capacitor source602401212036162
17DG set with synchronising panel26600601274
18Multi-function meter — LT panel feeder4000008000800
19Lighting control circuit800800800160184
TOTAL246174636401402726299028402

3. I/O point summary

SrDescriptionQtyAIDIAODOSIMonCtlAlmRemarks
HVAC
1Water-cooled chiller Tower A · B2 · Plant room3150
iChillers — ON / OFF Command3●Potential Free Contact from BMS to Chiller MCC Panel
iiChillers Trip / Fault3●●Potential Free Contact to BMS from Chiller MCC Panel
iiiChiller Run Status3●Potential Free Contact to BMS from Chiller MCC Panel
ivChiller Auto / Manual Status3●Potential Free Contact to BMS from Chiller MCC Panel
vCHW Supply Temperature3●Sensor & field wiring
viCHW Return Temperature3●Sensor & field wiring
viiCDW Supply Temperature3●Sensor & field wiring
viiiCDW Return Temperature3●Sensor & field wiring
ixCommon Header CHW Supply / Return Temperature2●Sensor & field wiring
xCHW Isolation Motorised Valve ON/OFF Command6●Potential Free Contact from BMS to motorised butterfly valve actuator
xiCHW Isolation Motorised Valve ON/OFF Status6●Potential Free Contact to BMS from valve limit switch
xiiCDW Isolation Motorised Valve ON/OFF Command6●Potential Free Contact from BMS to motorised butterfly valve actuator
xiiiCDW Isolation Motorised Valve ON/OFF Status6●Potential Free Contact to BMS from valve limit switch
xivChilled Water Supply Flow Measurement1●Sensor & field wiring
xvPressure Monitoring in Chilled Water Line6●Sensor & field wiring
xviChiller Header Isolation Motorised Valve Command6●Potential Free Contact from BMS to valve actuator
xviiChiller Header Isolation Motorised Valve Status6●Potential Free Contact to BMS from valve limit switch
xviiiOutside Air Temperature and RH Sensor2●Sensor & field wiring
xixCHW Flow Switch at Chiller Evaporator — flow proving interlock3●●Chiller enable interlock requires proven evaporator flow.
xxCDW Flow Switch at Chiller Condenser — flow proving interlock3●●Chiller enable interlock requires proven condenser flow.
xxiChilled Water Header BTU / Energy Meter1●Required for ECBC energy reporting and plant kW/TR.
xxiiCondenser Water Header Flow Measurement1●Condenser side flow was not measured.
xxiiiProtocol integration (soft points)150●Modbus/BACnet Integration (Chiller Plant Manager — 50 objects per machine, covers all intrinsic parameters)
2Primary chilled-water pump (VFD) Tower A · B2460
iPrimary CHW Pump ON / OFF Command4●Potential Free Contact from BMS to MCC Panel
iiPrimary CHW Pump Auto / Manual Status4●Potential Free Contact to BMS from MCC Panel
iiiPrimary CHW Pump Run Status4●Sensor & field wiring
ivPrimary CHW Pump Trip Status4●●Potential Free Contact to BMS from MCC Panel
vPrimary CHW Pump VFD Speed Command4●0-10 V DC / 4-20 mA output from BMS to VFD
viPrimary CHW Pump VFD Frequency Feedback4●0-10 V DC / 4-20 mA input to BMS from VFD
viiPrimary CHW Pump VFD Soft Integration60●6 drives × 15 registers. Previously shown as "x" and counted as nil.
3Cooling tower cell Terrace3
iCooling Tower Fan ON / OFF Command3●Potential Free Contact from BMS to MCC Panel
iiCooling Tower Fan Auto / Manual Status3●Potential Free Contact to BMS from MCC Panel
iiiCooling Tower Fan ON / OFF Status3●Sensor & field wiring
ivCooling Tower Fan Trip Status3●●Potential Free Contact to BMS from MCC Panel
vCooling Tower Sump Low Level3●●Sensor & field wiring
viCooling Tower Sump High Level (overflow)3●●Only low level was provided; overflow was undetected.
viiCooling Tower Inlet Isolation Valve Open / Close Command6●Relay output (1 SPDT open / close) @ 2 A, 230 V and wiring to valve actuator
viiiCooling Tower Inlet Isolation Valve Open / Close Status6●●Potential Free Contact to BMS from valve actuator limit switch
ixCondenser Water Inlet and Outlet Temperature at Cooling Tower6●Sensor & field wiring
xHeader Temperature from Cooling Tower Outlet1●Sensor & field wiring
4Air handling unit — floor mounted Tower A12240
iUnit ON / OFF Command12●Potential Free Contact from BMS to MCC Panel
iiUnit Run Status12●Sensor & field wiring
iiiUnit Auto / Manual Status12●Potential Free Contact to BMS from MCC Panel
ivPre-Filter Clogged Status12●●Sensor & field wiring
vFine Filter Clogged Status12●●Sensor & field wiring
viUnit Trip Status12●●Potential Free Contact to BMS from MCC Panel
viiDuct Static Pressure12●Sensor & field wiring
viiiReturn Air Temperature and Humidity Monitoring24●●Sensor & field wiring — 1 combined sensor per unit giving 2 analogue signals
ixSupply Air Temperature Monitoring12●●1 sensor per unit = 1 AI. Previously counted as 2 AI per unit against 1 device.
x2-Way CHW Valve Modulating Control12●Output signal from DDC controller, wiring to valve actuator
xi2-Way CHW Valve Position Feedback12●Feedback signal from valve actuator to DDC controller
xiiCHW Line Supply and Return Temperature Monitoring24●Sensor & field wiring
xiiiMotorised Fresh Air Damper Modulating Command12●Output signal from DDC controller, wiring to damper actuator
xivMotorised Fresh Air Damper Position Feedback12●Feedback signal from damper actuator to DDC controller
xvVFD Speed Control Output12●Input signal (0-10 V) to control VFD frequency on return air basis
xviVFD Frequency Feedback12●0-10 V feedback from VFD to DDC to monitor frequency. Register data included in the 20 objects per unit at Sr. 4.
xviiCO2 Sensor in Return Air Duct12●●Sensor & field wiring
xviiiFire Damper Open / Close Status48●●4 dampers per unit (was 2). To be reconciled against the approved fire damper schedule.
xixDuct Smoke Detector Status — supply and return air duct24●●AHU smoke-sensitive devices for actuation and control — shutdown on duct smoke detection (NBCS 2026 Part F cl. 3.5.7.2.1). Not provided in the previous issue.
xxProtocol integration (soft points)240●Modbus/BACnet Integration — 20 objects per unit (includes VFD register data)
5Fan coil unit60600
iProtocol integration (soft points)600●Modbus/BACnet Integration — 10 objects per unit
VENTILATION
6Smoke / exhaust fan — fire-rated axial B18
iFan Auto / Manual Status15●Potential Free Contact to BMS from Fan Starter Panel
iiFan Trip Status15●●Potential Free Contact to BMS from Fan Starter Panel
iiiFan ON / OFF Status15●Potential Free Contact to BMS from Fan Starter Panel
ivFan Auto / Manual Status15●Potential Free Contact to BMS from Fan Starter Panel
vFan Trip Status15●●Potential Free Contact to BMS from Fan Starter Panel
viFan ON / OFF Status15●Potential Free Contact to BMS from Fan Starter Panel
viiFan Auto / Manual Status7●Potential Free Contact to BMS from Fan Starter Panel
viiiFan Trip Status7●●Potential Free Contact to BMS from Fan Starter Panel
ixFan ON / OFF Status7●Potential Free Contact to BMS from Fan Starter Panel
xFan Auto / Manual Status7●Potential Free Contact to BMS from Fan Starter Panel
xiFan Trip Status7●●Potential Free Contact to BMS from Fan Starter Panel
xiiFan ON / OFF Status7●Potential Free Contact to BMS from Fan Starter Panel
xiiiFan Auto / Manual Status7●Potential Free Contact to BMS from Fan Starter Panel
xivFan Trip Status7●●Potential Free Contact to BMS from Fan Starter Panel
xvFan ON / OFF Status7●Potential Free Contact to BMS from Fan Starter Panel
xviFan Auto / Manual Status2●Potential Free Contact to BMS from Fan Starter Panel
xviiFan Trip Status2●●Potential Free Contact to BMS from Fan Starter Panel
xviiiFan ON / OFF Status2●Potential Free Contact to BMS from Fan Starter Panel
xixFan Auto / Manual Status2●Potential Free Contact to BMS from Fan Starter Panel
xxFan Trip Status2●●Potential Free Contact to BMS from Fan Starter Panel
xxiFan ON / OFF Status2●Potential Free Contact to BMS from Fan Starter Panel
7Staircase pressurisation fan412
iFan Auto / Manual Status4●Potential Free Contact to BMS from Fan Starter Panel, plus soft integration (dual path — life safety)
iiFan Auto / Manual Status4●Potential Free Contact to BMS from Fan Starter Panel, plus soft integration (dual path — life safety)
iiiFan Trip Status4●●Potential Free Contact to BMS from Fan Starter Panel, plus soft integration (dual path — life safety)
ivFan Trip Status4●●Potential Free Contact to BMS from Fan Starter Panel, plus soft integration (dual path — life safety)
vFan ON / OFF Status4●Potential Free Contact to BMS from Fan Starter Panel, plus soft integration (dual path — life safety)
viFan ON / OFF Status4●Potential Free Contact to BMS from Fan Starter Panel, plus soft integration (dual path — life safety)
PLUMBING AND WATER
8Domestic water transfer pump B22
iPump ON / OFF Command2●Potential Free Contact from BMS to Pump Starter Panel. Quantity was blank in the previous issue — the pumps could not be started by BMS.
iiPump Auto / Manual Status2●1 DI per pump (was 2 per pump against a quantity of 16).
iiiPump Run Status2●1 DI per pump. Sensor & field wiring
ivPump Trip Status2●●1 DI per pump. Potential Free Contact to BMS from Pump Starter Panel
9Water tank level monitoring6
iWater Tank High and Low Level Status12●●Sensor & field wiring
iiWater Tank Continuous Level Measurement6●Analogue level transmitter per tank for water accounting and pump control; only switches were provided.
FIRE FIGHTING
10Fire-fighting pump set (main, standby, jockey, sprinkler)1
iDIESEL FIRE PUMP — Run, Trip, Auto/Manual Status24●●3 DI per pump. Monitoring only — no BMS command to fire pumps; life-safety systems are stand-alone and pump status is monitored at the FA panel (NBCS 2026 Part D Sec 3 cl. 15.1.2 / NBCS 2026 Part F cl. 4.9 (j)).
iiELECTRICAL HYDRANT PUMP — Run, Trip, Auto/Manual Status12●●3 DI per pump. Monitoring only — no BMS command to fire pumps; life-safety systems are stand-alone and pump status is monitored at the FA panel (NBCS 2026 Part D Sec 3 cl. 15.1.2 / NBCS 2026 Part F cl. 4.9 (j)).
iiiJOCKEY PUMP FOR HYDRANT — Run, Trip, Auto/Manual Status12●●3 DI per pump. Monitoring only — no BMS command to fire pumps; life-safety systems are stand-alone and pump status is monitored at the FA panel (NBCS 2026 Part D Sec 3 cl. 15.1.2 / NBCS 2026 Part F cl. 4.9 (j)).
ivJOCKEY PUMP FOR SPRINKLER — Run, Trip, Auto/Manual Status12●●3 DI per pump. Monitoring only — no BMS command to fire pumps; life-safety systems are stand-alone and pump status is monitored at the FA panel (NBCS 2026 Part D Sec 3 cl. 15.1.2 / NBCS 2026 Part F cl. 4.9 (j)).
vELECTRICAL SPRINKLER PUMP — Run, Trip, Auto/Manual Status12●●3 DI per pump. Monitoring only — no BMS command to fire pumps; life-safety systems are stand-alone and pump status is monitored at the FA panel (NBCS 2026 Part D Sec 3 cl. 15.1.2 / NBCS 2026 Part F cl. 4.9 (j)).
viWATER CURTAIN PUMP — Run, Trip, Auto/Manual Status12●●3 DI per pump. Monitoring only — no BMS command to fire pumps; life-safety systems are stand-alone and pump status is monitored at the FA panel (NBCS 2026 Part D Sec 3 cl. 15.1.2 / NBCS 2026 Part F cl. 4.9 (j)).
viiJOCKEY PUMP FOR WATER CURTAIN — Run, Trip, Auto/Manual Status12●●3 DI per pump. Monitoring only — no BMS command to fire pumps; life-safety systems are stand-alone and pump status is monitored at the FA panel (NBCS 2026 Part D Sec 3 cl. 15.1.2 / NBCS 2026 Part F cl. 4.9 (j)).
viiiPressure Monitoring at Hydrant and Sprinkler Headers2●●Sensor & field wiring
FIRE ALARM AND LIFE SAFETY
11Fire alarm system interface125000
iFire Alarm System — Pin Point Alarm Devices25000●●INDICATIVE. Read over a single protocol interface at the FAS network controller. To be confirmed against the approved Fire Alarm device schedule — refer Note 5.
iiFire Zone Trigger Contact to BMS (hardwired, per fire zone)1●●Hardwired isolated potential free contact per fire zone from the FACP. Quantity to be fixed against the approved fire zone schedule.
LIFTS AND ESCALATORS
12Lift monitoring690
iLift Fireman’s Return / Fire Mode Status (hardwired)6●●Life safety status must not depend solely on the lift controller network.
iiProtocol integration (soft points)90●Modbus/BACnet Integration — 15 objects per lift — floor position, direction, load / overload, door status, modes (attendant, automatic, independent, fire service, seismic, EMS, inspection) (NBCS 2026 Part D Sec 5 cl. 9.8 (a)); lift control only through a BA interface, potential-free contacts give monitoring only
ELECTRICAL
13UPS system250
iUPS Trip Status2●●Potential Free Contact to BMS from UPS Panel
iiUPS Auto / Manual Status2●Potential Free Contact to BMS from UPS Panel
iiiUPS Inverter Failure2●●Potential Free Contact to BMS from UPS Panel
ivProtocol integration (soft points)50●Modbus/BACnet Integration — electrical and battery parameters
14HT breaker (33 kV / 11 kV)480
iBreaker ON / OFF Status4●Potential Free Contact to SCADA from HT / LT Panel
iiBreaker Trip Status4●●Potential Free Contact to SCADA from HT / LT Panel
iiiBreaker Auto / Manual Status4●Potential Free Contact to SCADA from HT / LT Panel
ivProtocol integration (soft points)80●Modbus/BACnet Integration — MFM at 20 registers per breaker
15Power / distribution transformer2
iTransformer HV / LV Breaker ON / OFF Status2●A transformer has no ON/OFF of its own — this is its incomer and outgoing breaker status. Potential Free Contact to SCADA from HT / LT Panel
iiTransformer Trip Status2●●Potential Free Contact to SCADA from HT / LT Panel
iiiWinding Temperature Alarm2●●Potential Free Contact to SCADA from HT / LT Panel
ivWinding Temperature Trip2●●Potential Free Contact to SCADA from HT / LT Panel
vOil Temperature Alarm2●●Potential Free Contact to SCADA from HT / LT Panel
viOil Temperature Trip2●●Potential Free Contact to SCADA from HT / LT Panel
viiWinding Temperature Value2●4-20 mA output from WTI. Previously only alarm and trip contacts — no trendable value.
viiiOil Temperature Value2●4-20 mA output from OTI. Previously only alarm and trip contacts — no trendable value.
16LT main ACB / bus coupler / capacitor source6120
iBreaker ON / OFF Command12●Potential Free Contact from SCADA to LT Panel. 2 DO per breaker (close and open), subject to the local/remote selector being in Remote. Scope of remote switchin
iiBreaker ON / OFF Status6●Potential Free Contact to SCADA from HT / LT Panel
iiiBreaker Trip Status6●●Potential Free Contact to SCADA from HT / LT Panel
ivBreaker Auto / Manual Status6●Potential Free Contact to SCADA from HT / LT Panel
vBreaker Spring Charged Status6●Potential Free Contact to SCADA from HT / LT Panel
viProtocol integration (soft points)120●Modbus/BACnet Integration — MFM at 20 registers per breaker
17DG set with synchronising panel260
iDG Internal and Outer Fuel Tank Low Level4●●Sensor & field wiring — flame proof level switch
iiDG Fuel Tank Continuous Level Measurement4●Level switches alone give no available run time. 4-20 mA transmitter on day and bulk tanks.
iiiDG Battery Under Voltage Fault2●●Sensor & field wiring — DC voltage transducer
ivDG Battery Voltage Value2●The DC voltage transducer is already provided; its analogue output was discarded and only a threshold contact was taken.
vProtocol integration (soft points)60●Modbus/BACnet Integration — 30 parameters per set: start/stop, sync panel status, auto/manual, on-load/off-load, low oil pressure warning and shutdown, hot wate
ENERGY AND METERING
18Multi-function meter — LT panel feeder40800
iProtocol integration (soft points)800●MOVED from the BMS I/O Summary and re-based at 20 registers per meter. The SCADA polls these meters once; the BMS reads a 5-parameter subset from the SCADA serv
LIGHTING CONTROL
19Lighting control circuit80
iCircuit ON / OFF Status80●Potential Free Contact to BMS from Distribution Board
iiCircuit ON / OFF Command80●Potential Free Contact from BMS to Distribution Board

4. Field device schedule

DeviceQuantityPrincipal application
Immersion Temperature Sensor45Air handling unit — floor mounted (24), Water-cooled chiller (14), Cooling tower cell (7)
DP Switch Air36Air handling unit — floor mounted (36)
Duct Smoke Detector24Air handling unit — floor mounted (24)
Level Switch12Cooling tower cell (6), Water tank level monitoring (6)
Pressure Transmitter Air12Air handling unit — floor mounted (12)
Duct Averaging Type Temp & RH Sensor12Air handling unit — floor mounted (12)
Duct Averaging Type Temp Sensor12Air handling unit — floor mounted (12)
CO2 Sensor12Air handling unit — floor mounted (12)
Water Pressure Transmitter8Water-cooled chiller (6), Fire-fighting pump set (main, standby, jockey, sprinkler) (2)
Flow Switch6Water-cooled chiller (6)
DP Switch Water6Primary chilled-water pump (VFD) (4), Domestic water transfer pump (2)
Level Transmitter (Analogue)6Water tank level monitoring (6)
Transformer WTI/OTI with 4-20 mA Output4Power / distribution transformer (4)
Flame Proof Level Switch4DG set with synchronising panel (4)
Fuel Level Transmitter4DG set with synchronising panel (4)
Current Relay3Cooling tower cell (3)
Water Flow Meter2Water-cooled chiller (2)
Outdoor Temp & RH Sensor2Water-cooled chiller (2)
DC Voltage Transducer2DG set with synchronising panel (2)
BTU / Energy Meter1Water-cooled chiller (1)

5. Soft-integrated points

SubsystemUnitsSIPer unitNature
Water-cooled chiller315050Modbus/BACnet Integration (Chiller Plant Manager — 50 objects per machine, covers all intrinsic parameters)
Primary chilled-water pump (VFD)460156 drives × 15 registers. Previously shown as "x" and counted as nil.
Air handling unit — floor mounted1224020Modbus/BACnet Integration — 20 objects per unit (includes VFD register data)
Fan coil unit6060010Modbus/BACnet Integration — 10 objects per unit
Staircase pressurisation fan4123Potential Free Contact to BMS from Fan Starter Panel, plus soft integration (dual path — life safety)
Fire alarm system interface12500025000INDICATIVE. Read over a single protocol interface at the FAS network controller. To be confirmed against the approved Fire Alarm device schedule — refer Note 5.
Lift monitoring69015Modbus/BACnet Integration — 15 objects per lift — floor position, direction, load / overload, door status, modes (attendant, automatic, independent, fire service, seismic, EMS, inspection) (NBCS 2026 Part D Sec 5 cl. 9.8 (a)); lift control only through a BA interface, potential-free contacts give monitoring only
UPS system25025Modbus/BACnet Integration — electrical and battery parameters
HT breaker (33 kV / 11 kV)48020Modbus/BACnet Integration — MFM at 20 registers per breaker
LT main ACB / bus coupler / capacitor source612020Modbus/BACnet Integration — MFM at 20 registers per breaker
DG set with synchronising panel26030Modbus/BACnet Integration — 30 parameters per set: start/stop, sync panel status, auto/manual, on-load/off-load, low oil pressure warning and shutdown, hot wate
Multi-function meter — LT panel feeder4080020MOVED from the BMS I/O Summary and re-based at 20 registers per meter. The SCADA polls these meters once; the BMS reads a 5-parameter subset from the SCADA serv

6. Panels and system architecture

Panels
9
Controllers
10
I/O modules
109
Channels used
990 / 1264
NLC / trunks
1 / 1
Cable (est.)
41,766 m
PanelLocationTrunkCtrlDIDOAIAOModulesSpare ch.Equipment
DDC-COM-01Tower A · common (no floor in the schedule)NLC-01/T1188880242556AHU-01, AHU-02, AHU-03, AHU-04, AHU-05, AHU-06, AHU-07, AHU-08
DDC-COM-02Tower A · common (no floor in the schedule)NLC-01/T1168446121530AHU-09, AHU-10, AHU-11, AHU-12, SPF-01, SPF-02, SPF-03, SPF-04, TK-01, TK-02, TK-03, TK-04, TK-05, TK-06
DDC-COM-03Tower A · common (no floor in the schedule)NLC-01/T1216455202143FPS, FAS, L-01, L-02, L-03, L-04, L-05, L-06, US-01, US-02, LCC-01, LCC-02, LCC-03, LCC-04, LCC-05, LCC-06, LCC-07, LCC-08, LCC-09, LCC-10, LCC-11, LCC-12, LCC-13, LCC-14, LCC-15, LCC-16, LCC-17, LCC-18, LCC-19, LCC-20, LCC-21, LCC-22, LCC-23, LCC-24, LCC-25, LCC-26, LCC-27, LCC-28, LCC-29, LCC-30, LCC-31, LCC-32, LCC-33, LCC-34, LCC-35, LCC-36, LCC-37, LCC-38, LCC-39, LCC-40, LCC-41, LCC-42, LCC-43, LCC-44, LCC-45, LCC-46, LCC-47, LCC-48, LCC-49, LCC-50, LCC-51, LCC-52, LCC-53, LCC-54, LCC-55
DDC-COM-04Tower A · common (no floor in the schedule)NLC-01/T11252500614LCC-56, LCC-57, LCC-58, LCC-59, LCC-60, LCC-61, LCC-62, LCC-63, LCC-64, LCC-65, LCC-66, LCC-67, LCC-68, LCC-69, LCC-70, LCC-71, LCC-72, LCC-73, LCC-74, LCC-75, LCC-76, LCC-77, LCC-78, LCC-79, LCC-80
DDC-B2-01Tower A · floor B2NLC-01/T1118644524PCHWP-01, PCHWP-02, PCHWP-03, PCHWP-04, DWP-01, DWP-02
DDC-B2-02Tower A · floor B2 · Plant roomNLC-01/T1133212501133CH-01, CH-02, CH-03
DDC-B1-01Tower A · floor B1NLC-01/T111650001227SEF-01, SEF-02, SEF-03, SEF-04, SEF-05, SEF-06, SEF-07, SEF-08
DDC-TERRACE-01Tower A · floor TerraceNLC-01/T1121970627CT-01, CT-02, CT-03
RTU-COM-01Tower A · common (no floor in the schedule)NLC-01/T115412100820HB(-01, HB(-02, HB(-03, HB(-04, P/D-01, P/D-02, LMA-01, LMA-02, LMA-03, LMA-04, LMA-05, LMA-06, DSW-01, DSW-02
FLOOR TerraceDDC-TERRACE-01DI 21 · DO 9 · AI 7 · AO 01 ctrl · 6 modCT-01, CT-02, CT-03FLOOR B1DDC-B1-01DI 165 · DO 0 · AI 0 · AO 01 ctrl · 12 modSEF-01, SEF-02, SEF-03 +5FLOOR B2DDC-B2-01DI 18 · DO 6 · AI 4 · AO 41 ctrl · 5 modPCHWP-01, PCHWP-02, PCHWP-03 +3DDC-B2-02DI 33 · DO 21 · AI 25 · AO 01 ctrl · 11 modCH-01, CH-02, CH-03COMMONDDC-COM-01DI 88 · DO 8 · AI 80 · AO 241 ctrl · 25 modAHU-01, AHU-02, AHU-03 +5DDC-COM-02DI 68 · DO 4 · AI 46 · AO 121 ctrl · 15 modAHU-09, AHU-10, AHU-11 +11DDC-COM-03DI 164 · DO 55 · AI 2 · AO 02 ctrl · 21 modFPS, FAS, L-01 +62DDC-COM-04DI 25 · DO 25 · AI 0 · AO 01 ctrl · 6 modLCC-56, LCC-57, LCC-58 +22RTU-COM-01DI 54 · DO 12 · AI 10 · AO 01 ctrl · 8 modHB(-01, HB(-02, HB(-03 +11TOWER ANLC-01network controllerT1 BACnet MS/TPCORE SWITCH — BACnet/IPBMS SERVER (DUTY)BMS SERVER (HOT STANDBY)OPERATOR WS-1OPERATOR WS-2PRINTERWEB / MOBILE CLIENTSLEVEL 1 — MANAGEMENT (HEAD-END)LEVEL 2 — AUTOMATION NETWORKLEVEL 3 / 4 — FIELD CONTROLLERS AND FIELD DEVICESTHIRD-PARTY INTEGRATION (SOFT POINTS)Water-cooled chiller3 no · 150 pts · BACnet/IP or Modbus (vendoPrimary chilled-water pump (VFD)4 no · 60 pts · Modbus RTU (RS-485)Air handling unit — floor mounted12 no · 240 pts · BACnet/IP or Modbus (vendoFan coil unit60 no · 600 pts · BACnet/IP or Modbus (vendoStaircase pressurisation fan4 no · 12 pts · Modbus RTU (RS-485)Fire alarm system interface1 no · 25000 pts · Modbus RTU (RS-485)Lift monitoring6 no · 90 pts · BACnet/IP or Modbus (vendoUPS system2 no · 50 pts · BACnet/IP or Modbus (vendoHT breaker (33 kV / 11 kV)4 no · 80 pts · BACnet/IP or Modbus (vendoLT main ACB / bus coupler / capaci6 no · 120 pts · BACnet/IP or Modbus (vendoDG set with synchronising panel2 no · 60 pts · BACnet/IP or Modbus (vendoMulti-function meter — LT panel fe40 no · 800 pts · Modbus RTU (RS-485)Modbus RTU (RS-485) / BACnet gatewayBackbone BACnet/IP (Cat 6 / fibre)Controller network BACnet MS/TPThird-party Modbus RTU (RS-485)9 panels · 10 controllers · 109 I/O modules (990 used of 1264 channels) · 1 NLC · 1 trunks · 12 integrationsBMS SYSTEM ARCHITECTURE — SAMPLE PROJECT — TOWER A

Bill of materials

ItemQtyNote
BMS server (head-end) with software licence2hot standby
Operator workstation with 2 × 24" monitors2
Core network switch (L3, managed)1
Network-level controller (NLC / supervisory)1BACnet/IP backbone
DDC panel enclosure IP54 with PSU, MCB, SPD, terminals8
RTU / PLC panel enclosure IP541
DDC controller10≤ 256 points each
DI module, 16 channels49
DO module, 8 channels24
AI module, 8 channels29
AO module, 8 channels7
Third-party integration (gateway / driver licence)12Water-cooled chiller, Primary chilled-water pump (VFD), Air handling unit — floor mounted, Fan coil unit, Staircase pressurisation fan, Fire alarm system interface…

7. Worked examples — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

System 4 — Air handling unit — floor mounted (AHU)
the system with the most hardwired points in this schedule
Given: Quantity 12 units · Tower A · Spare 15 % per point type, rounded up per system
1. AI points: AI = Σ per-unit × qty + Σ per-system = (1 + 2 + 1 + 1 + 2 + 1 + 1 + 1) × 12 = 120
2. DI points: DI = Σ per-unit × qty + Σ per-system = (1 + 1 + 1 + 1 + 1 + 4 + 2) × 12 = 132
3. AO points: AO = Σ per-unit × qty + Σ per-system = (1 + 1 + 1) × 12 = 36
4. DO points: DO = Σ per-unit × qty + Σ per-system = (1) × 12 = 12
5. Hardwired total: AI + DI + AO + DO = 120 + 132 + 36 + 12 = 300
6. AI with spare: AI + ⌈AI × 15 %⌉ = 120 + ⌈18.00⌉ = 120 + 18 = 138
7. DI with spare: DI + ⌈DI × 15 %⌉ = 132 + ⌈19.80⌉ = 132 + 20 = 152
8. AO with spare: AO + ⌈AO × 15 %⌉ = 36 + ⌈5.40⌉ = 36 + 6 = 42
9. DO with spare: DO + ⌈DO × 15 %⌉ = 12 + ⌈1.80⌉ = 12 + 2 = 14
10. Total incl. spare: Σ (type + spare) + SI = 138 + 152 + 42 + 14 + 240 SI = 586 (soft points carry no spare)
Project totals with spare
spare applied once on the project total per type (rounded up)
1. AI: AI + ⌈AI × 15 %⌉ = 174 + ⌈26.10⌉ = 201
2. DI: DI + ⌈DI × 15 %⌉ = 636 + ⌈95.40⌉ = 732
3. AO: AO + ⌈AO × 15 %⌉ = 40 + ⌈6.00⌉ = 46
4. DO: DO + ⌈DO × 15 %⌉ = 140 + ⌈21.00⌉ = 161
5. Hardwired incl. spare: Σ = 201 + 732 + 46 + 161 = 1140 (990 without spare)
Panel DDC-COM-03 — Tower A · common (no floor in the schedule)
the most loaded controller panel of the architecture
Given: Equipment FPS, FAS, L-01, L-02, L-03, L-04, L-05, L-06 … · Controller 256 points, 1 per panel
1. Raw points per panel (room for spare): Nmax = ⌊points/controller × controllers/panel / (1 + spare)⌋ = ⌊256 × 1 / 1.15⌋ = 222
2. Panel loading: N ≤ Nmax → 221 ≤ 222 PASS
3. DI modules: ⌈DI × (1 + spare) / 16 ch⌉ = ⌈164 × 1.15 / 16⌉ = ⌈11.79⌉ = 12 (192 channels, 28 spare = 17 %)
4. DO modules: ⌈DO × (1 + spare) / 8 ch⌉ = ⌈55 × 1.15 / 8⌉ = ⌈7.91⌉ = 8 (64 channels, 9 spare = 16 %)
5. AI modules: ⌈AI × (1 + spare) / 8 ch⌉ = ⌈2 × 1.15 / 8⌉ = ⌈0.29⌉ = 1 (8 channels, 6 spare = 300 %)
6. Controllers: ⌈Σ channels / points per controller⌉ = ⌈264 / 256⌉ = 2
7. Spare channels: spare ≥ 15 % per type → DI 28/164, DO 9/55, AI 6/2 PASS

8. Codes and standards

Indian code edition: NBCS 2026 (SP 7:2026) — National Building Construction Standards (replaced NBC 2016 on 30 Apr 2026).

NBCS 2026 clausePDF pageGoverns
Part D Sec 2 cl. 10.4.1–10.4.31747–1748BMS scope (substation, HVAC, lighting, lifts, fire, PA, security), integration of stand-alone systems, BEE / Part F compliance, cyber protection
Part D Sec 3 cl. 15.1.12044HVAC automation — monitoring, control, energy data, alarms, history
Part D Sec 3 cl. 15.1.22044–2045Life-safety systems always stand-alone; monitored from the BMS (tanks, pumps, pressures, FA alerts)
Part D Sec 5 cl. 9.82321–2322Lift interface — monitoring signals (a), control signals only via a BA interface (b), reports (c)
Part D Sec 6 cl. 2.62465BMS as an ICT sub-system; shared IT space
Part F cl. 3.5.7.2.12762AHU smoke-sensitive devices for actuation and control
Part F cl. 3.5.11 (b)2765Fire command centre — control of FA, pressurisation and smoke systems; BMS monitoring may be from the FCC
Part F cl. 4.6.22788Smoke extraction starts on the sprinkler flow switch; manual start-stop for fire fighters
Part F cl. 4.9 (b), (j)2789–2790FA programmed to operate AHU / pressurisation / smoke systems; tanks, pressures, pump status, valves monitored from the FA panel
Part D Sec 2 cl. 4.21671–Substation and switch rooms — HV, transformer and LV switchgear monitored by the SCADA
Part D Sec 2 cl. 4.2.1 (jj)1674–1675Fire and life-safety loads on normal + standby supply with changeover
Part D Sec 2 cl. 4.3–4.51680–1681DG sets; battery storage with gas monitoring; multiple sources — synchronisation and priority
Part D Sec 2 cl. 4.81682Substation safety
Part D Sec 2 cl. 10.4.21748Integration of substation, renewable and standby generation with the BMS
StandardTitleUsed for
ISO 16484 (Parts 1–6)Building automation and control systemsSystem design, hardware, functions, data communication (BACnet) for the BMS
ASHRAE Standard 135 / ISO 16484-5 (BACnet)Data communication protocol for building automation and control networksBackbone and controller network protocol
ASHRAE Guideline 36High-performance sequences of operation for HVAC systemsControl narratives for AHUs, plants and zones
ASHRAE Guideline 13Specifying building automation systemsPoint classification, spare capacity, graphics and alarm philosophy
Modbus Application Protocol V1.1b3 / Serial Line V1.02Modbus protocol specificationsThird-party integration of drives, meters, chillers, UPS and plant PLCs
IEC 61131-2 / -3Programmable controllers — equipment requirements and programming languagesPLC panels for tunnel / car-park ventilation, lighting and electrical SCADA
IEC 61439-1/2:2020 / IS/IEC 61439Low-voltage switchgear and controlgear assembliesPanel construction (TTA/PTTA), busbar short-time withstand (Icw 1 s), temperature rise, IP rating
IEC 62443 (series)Security for industrial automation and control systemsZones and conduits, user management, hardening of the automation network
IEC 61850Communication networks and systems for power utility automationSubstation SCADA — relays, IEDs, GOOSE / MMS
IEC 60870-5-104Telecontrol equipment and systems — network accessElectrical SCADA telecontrol over TCP/IP
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
NBCS 2026 (SP 7:2026) Part D Sec 3National Building Construction Standards — Air conditioning, heating and mechanical ventilationDesign conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation
NBCS 2026 (SP 7:2026) Part D Sec 5National Building Construction Standards — Lifts, escalators, moving walks and power-driven parkingLift traffic, fire-fighting lifts, controls
NBCS 2026 (SP 7:2026) Part D Sec 6National Building Construction Standards — Information and communication enabled installationsStructured cabling, Wi-Fi (IEEE 802.11ax/be), ICT spaces
NBCS 2026 (SP 7:2026) Part FNational Building Construction Standards — Fire and life safetyMeans of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
CEA (Measures relating to Safety and Electric Supply) Regulations, 2023Central Electricity Authority safety regulationsStatutory safety requirements for installations
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IS 3043:2018Code of practice for earthingEarth bus, strip sizing, earthing of panels (future earthing tool)
CPWD General Specifications for Electrical Works Part VI (BMS)Building management system specificationPanels, cabling, controllers and head end for CPWD works
Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.