Earthing — electrodes, pits, strips, earth mat

Sample project — Tower A · Electrical
Generated 28 Nov 2026 16:09
Single electrode resistance (pipe / rod / plate / strip), electrodes in parallel to reach …
Project code SAMPLE
One electrode
30.3 Ω
Electrodes for target
55 nos
Combined
0.994 Ω
Earth strip
1×65×8 mm
PE conductor
185 mm² Cu

1. Inputs

GroupInputValueUnit
Site & faultSoil resistivity100Ω·m
Site & faultTarget earth resistance1.0Ω
Site & faultEarth-fault current25kA
Site & faultFault clearing time1.0s
Site & faultEarth conductor materialGI strip / flat
Site & faultCorrosion allowance30%
Site & faultLargest phase conductor (for PE sizing)240mm²
Site & faultEarthing three-phase equipment / installation (two distinct earths, NBCS 8.2.9)True
ElectrodeElectrode typePipe / rod (vertical)
ElectrodeElectrode material (NBCS Table 2 check)Hot-dip galvanised steel
ElectrodePipe or solid rodPipe
ElectrodeLength3.0m
ElectrodeDiameter (pipe / rod)40mm
ElectrodeBurial depth (top)0.6m
ElectrodeSpacing between electrodes6.0m
ElectrodeBackfill / treatmentNative soil
Substation earth mat (IEEE 80)Design an earth gridFalse

2. Results

Single electrode

ItemValueUnitNote / basis
Formula (IS 3043 cl. 9)R = ρ/(2πL) · ln(4L/d)
Givenρ 100.0 Ω·m, L 3.0 m, d 40 mm
Resistance of one electrode30.26Ω
Backfill factor1.0
Design resistance of one electrode30.26Ω

Minimum electrode size (NBCS 2026 Table 2, soil)

ItemValueUnitNote / basis
ElectrodeSteel, hot-dip galvanised pipe
Table 2 minimumØ ≥ 25 mm, wall ≥ 2 mm
ProvidedØ 40 mm

Electrodes in parallel (IS 3043 Table 12 method)

ItemValueUnitNote / basis
Spacing6.0m
α = ρ / (2π R₁ s)0.0877
Electrodes required55nos
Combined resistance0.9939Ω

Earth conductor / strip

ItemValueUnitNote / basis
Material · kGI / steel · k = 80 A·√s/mm²IS 3043 Table 6
Thermal section I·√t/k312.5mm²
With corrosion allowance406.25mm²
Selected strip1 × 65 × 8 mm
Provided section520mm²

Protective (PE) conductor — copper

ItemValueUnitNote / basis
Phase conductor240.0mm²
Rule size (S ≤ 16 → S; 16 < S ≤ 35 → 16; > 35 → S/2)120.0mm²
Adiabatic minimum I·√t/143174.83mm²
PE conductor185mm²

Resistance vs number of electrodes

NλR Ω
11.030.26
21.016.456
31.6611.554
42.158.991
52.547.399
62.876.312
73.125.505
83.364.897
93.554.408
103.744.018
113.913.693
124.073.421
134.213.187
144.352.986
154.472.809
164.62.654
174.72.513
184.82.388
194.92.277
205.02.176
215.122.088
225.242.007
235.361.934
245.481.866
255.61.805
Combined resistance vs number of electrodes — pipe in ρ = 100 Ω·m at 6 m spacing0.006.5413.0719.6126.1432.681611162126313641465156target 1 ΩN = 55 → 0.99 Ωnumber of electrodes N (R_N = R₁·(1 + λα)/N, IS 3043 λ factors) — mutual coupling makes extra electrodes less and less effective

3. Checks

CheckResultNote
55 electrode(s) → 0.99 Ω ≤ target 1.0 ΩPASSincrease spacing, length or use treated electrodes if the count is high
Earth strip 1 × 65 × 8 mm GI / steelPASS≥ 406 mm² incl. corrosion
Electrode size Ø 40 mm vs NBCS Table 2 Ø ≥ 25 mm, wall ≥ 2 mmPASSminimum sizes for corrosion and mechanical strength (8.3)
Earth strip laid in soil 65 × 8 mm ≥ Table 2 strip 90 mm² × 3 mmPASSa buried strip also acts as an electrode (NBCS Table 2)
Three-phase equipment: two separate and distinct earth connections — 55 electrode(s) / connectionsPASSNBCS 8.2.9 / 8.2.9.1 (transformer / DG neutral also by two separate connections)

4. Worked example

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Electrodes for the target resistance
this site's soil and electrode
Given: Soil ρ = 100 Ω·m · Electrode ρ 100.0 Ω·m, L 3.0 m, d 40 mm · Backfill factor 1
1. One electrode: R = ρ/(2πL) · ln(4L/d) = 30.26 Ω (× 1 backfill → 30.26 Ω)
2. Interaction factor: α = ρ / (2π · R₁ · s) = 100 / (2π · 30.26 · 6) = 0.09
3. 55 electrodes in parallel: RN = R₁ · (1 + λ·α) / N = 30.26 · (1 + 9.20 · 0.088) / 55 = 0.99 Ω (λ from IS 3043 Table 12)
4. Target: RN ≤ 1 Ω → 0.99 Ω with N = 55 PASS
5. Minimum size (NBCS Table 2): Ø ≥ 25 mm, wall ≥ 2 mm → Ø 40 mm PASS
6. Two distinct earths (NBCS 8.2.9): ≥ 2 connections for three-phase equipment → 55 provided PASS
Earth strip and PE conductor for the fault current
25 kA for 1 s
1. Thermal section: A = I · √t / k = 25,000 · √1 / 80 = 312 mm² (GI / steel, IS 3043 Table 6)
2. With corrosion allowance: Ac = A · (1 + c) = 312 · (1 + 0.3) = 406 mm²
3. Strip chosen: next standard strip ≥ Ac → 1 × 65 × 8 mm = 520 mm² PASS
4. PE conductor: max(rule size, I·√t / 143) = max(120, 175) = 185 mm² Cu (IEC 60364-5-54)

5. Notes

6. Standards and references

Prepared by
Checked by
Approved by