SAMPLE Energy consumption & electricity bill — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

Energy consumption & electricity bill

Sample project — Tower A · Electrical
Generated 28 Nov 2026 17:16
Monthly kWh of a load list (kW × quantity × hours × days), maximum demand, and the bill on…
Project code SAMPLE
Energy
8506.8 kWh/month
Maximum demand
37.2 kVA
Bill
87662.7 ₹/month
Average rate
10.3 ₹/kWh

1. Inputs

GroupInputValueUnit
LoadsOne load per line: name, kW each, quantity, hours/day, days/month, demand factor (optional)LED lighting, 0.036, 120, 10, 26, 1 Split AC 1.5 TR, 1.6, 12, 8, 26, 0.8 Computers, 0.15, 40, 9, 26, 0.9 Water pump, 3.7, 2, 3, 30, 0.5 Lift, 11, 1, 4, 30, 0.6
TariffEnergy slabs — upper kWh:₹/kWh, the last *:rate500:6.5, 2000:7.5, *:8.5
TariffDemand / fixed charge250₹ per kVA per month
TariffContract demand60kVA
TariffBilled demand at least75% of contract demand
TariffAverage power factor0.95
TariffFuel / power-purchase adjustment0.3₹/kWh
TariffElectricity duty5% of energy + demand

2. Results

Bill

ItemValueUnitNote / basis
Energy charge (slabs)69807.8₹
Demand charge11250.0₹billed 45.0 kVA
Fuel adjustment2552.04₹
Electricity duty4052.89₹
Total87662.73₹

Loads

LoadkW eachQtyh/daydayskWkWh/month
LED lighting0.03612010264.321,123
Split AC 1.5 TR1.61282619.203,994
Computers0.15409266.001,404
Water pump3.723307.40666
Lift11143011.001,320

3. Checks

CheckResultNote
Maximum demand 37.2 kVA within the contract demand 60 kVAPASSexceeding usually attracts a penalty

4. Worked example

Energy = Σ kW × qty × h × days = 8,507 kWh; slabs → ₹ 69,808
MD = Σ kW × qty × DF = 35.4 kW ÷ pf 0.95 = 37.2 kVA; billed max(37.2, 75 % × 60) = 45.0 kVA

5. Notes

6. Standards and references

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.