SAMPLE Energy code compliance — ECSBC 2024 (ECBC 2017 option) / ASHRAE 90.1 — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

Energy code compliance

Sample project — Tower A · ECSBC 2024 · ECSBC · Composite
Generated 28 Nov 2026 16:09
Prescriptive checklist with proposed values, results and clauses; EPI estimate
Project code SAMPLE
Code
ECSBC 2024
Level
ECSBC
Climate zone
Composite
Checks
26 / 28 pass
EPI estimate
111.3 kWh/m²/yr
Benchmark
90 kWh/m²/yr

1. Project & path

ItemValue
Building typeoffice
Gross floor area5000 m²
Location / climate zoneGurgaon — Composite (composite)
Code editionECSBC 2024 — BEE Energy Conservation and Sustainable Building Code 2024 — the energy code cited by NBCS 2026 (SP 7:2026) Part D Sec 1 / Sec 3. Standardized Compliance Method (cl. 3.2.3): mandatory + standardized requirements checked item by item.
Compliance pathStandardized Compliance Method (ECSBC 2024 cl. 3.2.3) — mandatory (x.2) and standardized (x.3) requirements checked item by item; the Integrative Compliance Method (cl. 3.2.2, Table 3.1: MEPI of the proposed vs the baseline building by simulation, PES of cl. 12.6) and the envelope trade-off (EPF, cl. 5.3.5) / total-system-efficiency (Table 6.25) alternatives are not covered here
Requirement valuestranscribed from the code tables for design-stage checking — verify against the current edition before submission

2. Envelope — 8 of 8 ok

RequirementCode valueProposedUnitResultClauseNote
Window-to-wall ratio (Standardized method)0.40.35PASSECSBC 2024 cl. 5.3.3 (1)trade-off method also limited to WWR ≤ 40 %
Roof assembly U-factor0.260.26W/m²KPASSECSBC 2024 Table 5.3insulation outside, not in the false ceiling
Opaque external wall assembly U-factor0.630.4W/m²KPASSECSBC 2024 Table 5.6Business < 10,000 m² AGA (area taken as AGA)
Vertical fenestration assembly U-factor2.22.2W/m²KPASSECSBC 2024 Table 5.9
Vertical fenestration SHGC (non-north)0.250.25PASSECSBC 2024 Table 5.9unshaded; shaded glass may divide by the SEF (Tables 5.12–5.13)
Fenestration visible light transmittance0.270.4PASSECSBC 2024 cl. 5.3.3 (2)
Cool roof — initial solar reflectance0.70.7PASSECSBC 2024 cl. 5.3.1 (a)roof not under PV / SWH; or a vegetated roof
Daylighting: ≥ 40 % of above-grade floor area with UDI 100–2,000 lx (simulation or manual DEF method)requiredyesPASSECSBC 2024 cl. 5.2.3, Table 5.1

3. Lighting — 5 of 5 ok

RequirementCode valueProposedUnitResultClauseNote
Interior lighting power density — office (building area method)9.58W/m²PASSECSBC 2024 Table 7.1
Occupancy sensors in spaces < 30 m², meeting rooms, stores > 15 m², public toilets > 25 m²requiredyesPASSECSBC 2024 cl. 7.2.2 (b)
Daylight-area luminaires: manual or automatic control (≥ 5 min delay, off / dim to 10 %)requiredyesPASSECSBC 2024 cl. 7.2.2 (c)
Automatic shut-off of interior lighting with 2 h overriderequiredyesPASSECSBC 2024 cl. 7.2.2 (a)
Exterior lighting: photo-sensor / astronomical time switch, luminaire efficacy ≥ 100 lm/WrequiredyesPASSECSBC 2024 cl. 7.2.3 / 7.2.7

4. HVAC — 11 of 12 ok

RequirementCode valueProposedUnitResultClauseNote
CH-1 700 kW — full-load COP (water-cooled)5.45.6PASSECSBC 2024 Table 12.4IPLV ≥ 6.5; baseline (ECSBC) value
CH-1 — BEE star rating3—starinfoECSBC 2024 Table 6.12
AHU — fan mechanical efficiency (motor IE3)65—%infoECSBC 2024 Table 6.9W/(L/s) 2.1 entered — ECSBC sets efficiency, not W/(L/s)
Economiser — not required (BUA ≤ 20,000 m²)not requiredyesinfoECSBC 2024 cl. 6.3.5 (a)
Variable-flow hydronic pumping (pump system power > 7.5 kW, down to 50 %)requiredyesPASSECSBC 2024 cl. 6.3.6 (a)
AHU fan-speed modulation on duct static pressure (AHUs ≥ 5,000 m³/h)requiredyesPASSECSBC 2024 cl. 6.2.3 (e)
Piping insulation — as per ECSBC 2024 Tables 6.4 / 6.5 / 6.6 (p. 75–76) — e.g. chilled water 4.5–15 °C: R 0.7 / 0.9 / 1.0 (< 40 mm pipe)requiredyesPASSECSBC 2024 cl. 6.2.4 (a)
Duct insulation — ECSBC 2024 Table 6.7 (p. 76) — supply ducts R-1.4 exterior / R-0.6 unconditioned or buried, return R-0.6 exteriorrequiredyesPASSECSBC 2024 cl. 6.2.4 (b)
Timeclock: 3 day-types per week, 2 h manual override, systems ≥ 17.5 kWr (cl. 6.2.3 (a), p. 74)requiredyesPASS
Zone temperature control, 3.0 °C dead band, no simultaneous heating & cooling (cl. 6.2.3 (b), p. 74)requiredyesPASS
Occupancy controls per zone — set-point to ≥ 27 °C when unoccupied (cl. 6.2.3 (c), p. 74)requirednoCHECK
Demand-control ventilation where outdoor air > 5,400 m³/h, CO₂ sensors in spaces > 50 m² (cl. 6.2.1 (c), p. 72)where applicablenoinfo

5. Electrical — 5 of 6 ok

RequirementCode valueProposedUnitResultClauseNote
Distribution transformer — BEE star (oil) / Table 8.1 losses (dry)BEE 3-star (oil) / Table 8.1 ECSBC column (dry)Level 2infoECSBC 2024 cl. 8.2.1
Motor efficiency class (IS 12615)IE3IE3PASSECSBC 2024 cl. 8.2.3
Power factor at the point of connection0.970.97PASSECSBC 2024 cl. 8.2.6
UPS UPS-1 100 kVA — efficiency at 100 % load0.940.92CHECKECSBC 2024 Table 8.8
Mains energy / demand / THD metering; sub-metering by end use (≥ 120 kVA contract demand)requiredyesPASSECSBC 2024 cl. 8.2.5
Lifts: energy class C / B / A (IS 17515-2) with VFD, PM gearless machine, standby lighting; escalators A+ / A++ / A+++ (cl. 8.2.11, p. 103–104)requiredyesPASSECSBC 2024 cl. 8.2.11lifts class C at this level

6. Renewable — 2 of 2 ok

RequirementCode valueProposedUnitResultClauseNote
On-site renewable energy (REGZ) as % of the contract demand — ECSBC 4 % (or ≥ 50 % of the roof), ECSBC+ 7.5 %, Super ECSBC 15 % (cl. 8.2.10 (a), Tables 8.9 / 8.10)44% of contract demandPASSECSBC 2024 cl. 8.2.10 (a)ECSBC level: or ≥ 50 % of the roof area
Centralised hot water by heat pumps (COP ≥ 3.5 air-source, 4.5 water-source, 3.0 ground-source); hospitality & healthcare: solar ≥ 40 % of the hot-water demand (cl. 9.2.8, p. 107–108)requiredyesPASSECSBC 2024 cl. 9.2.8

7. Compliance chart — required vs proposed

Compliance — proposed as % of the code value (ECSBC 2024)"max" items comply at ≤ 100 %, "min" items (COP, efficiency, VLT, SRI, pf) at ≥ 100 %0 %25 %50 %75 %100 %125 %150 %Window-to-wall ratio (Standardized method) (max)0.35 vs 0.4 Roof assembly U-factor (max)0.26 vs 0.26 W/m²KOpaque external wall assembly U-factor (max)0.4 vs 0.63 W/m²KVertical fenestration assembly U-factor (max)2.2 vs 2.2 W/m²KVertical fenestration SHGC (non-north) (max)0.25 vs 0.25 Fenestration visible light transmittance (min)0.4 vs 0.27 Cool roof — initial solar reflectance (min)0.7 vs 0.7 Interior lighting power density — office (building… (max)8 vs 9.5 W/m²CH-1 700 kW — full-load COP (water-cooled) (min)5.6 vs 5.4 Power factor at the point of connection (min)0.97 vs 0.97 UPS UPS-1 100 kVA — efficiency at 100 % load (min)0.92 vs 0.94 On-site renewable energy (REGZ) as % of the contra… (min)4 vs 4 % of contract demand

8. Compliance tiers — ECSBC / ECSBC+ / Super ECSBC

Compliance tiers — ECSBC 2024 requirement at each level vs proposed (scaled per item)ticks = code value per level, ◆ = proposed; right column = highest level the proposed value meetsECSBCECSBC+Super ECSBCWindow-to-wall ratio (Standardized method) (all levels)Super ECSBC0.35 Roof assembly U-factorECSBC0.26 W/m²KOpaque external wall assembly U-factorECSBC+0.4 W/m²KVertical fenestration assembly U-factorECSBC2.2 W/m²KVertical fenestration SHGC (non-north)ECSBC+0.25 Fenestration visible light transmittance (all levels)Super ECSBC0.4 Cool roof — initial solar reflectance (all levels)Super ECSBC0.7 Interior lighting power density — office (buildi…ECSBC8 W/m²Power factor at the point of connectionECSBC0.97 UPS UPS-1 100 kVA — efficiency at 100 % load (all levels)none0.92 On-site renewable energy (REGZ) as % of the cont…ECSBC4 % of contract demand

9. Energy performance index (estimate)

ComponentkWh/m²/yrBasis
Lighting24.0LPD W/m² × 3000 h
Equipment / plug loads21.010 W/m² × 3000 h × 0.7 diversity
Cooling incl. fans & pumps58.3600 kW × 1800 EFLH ÷ COP 5.0 × 1.35
Other (lifts, pumps, external)8.0allowance
Total111.3benchmark 90 kWh/m²/yr — above
EPI estimate 111.3 kWh/m²/yr vs benchmark 90 — aboveEPI24.021.058.38.0benchmark 90Lighting 24.0Equipment 21.0Cooling incl. fans & pumps 58.3Other 8.0

The EPI here is a design-stage estimate from operating hours and installed loads, not a simulation; the ECSBC 2024 Integrative Compliance Method (MEPI, Table 3.1) needs an hourly model.

10. Worked example — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Lighting power — office
this project's lighting input
Given: Method building area · Level ECSBC
1. Allowance: LPDallow from the building-area table = 9.5 W/m² (ECSBC 2024 Table 7.1)
2. Installed LPD: LPD ≤ LPDallow → 8 ≤ 9.5 W/m² PASS
Envelope — opaque wall and glass, zone Composite
this project's envelope input
1. Wall U limit: Umax for the zone and level = Composite, ECSBC = 0.63 W/m²K (ECSBC 2024 Table 5.6)
2. Wall U: U ≤ Umax → 0.4 ≤ 0.63 PASS
3. SHGC limit: SHGCmax non-north for the zone and level (WWR ≤ 0.40 by cl. 5.3.3) = Composite, ECSBC, WWR = 0.35 = 0.25 (ECSBC 2024 Table 5.9)
4. Glass SHGC: SHGC ≤ SHGCmax → 0.25 ≤ 0.25 PASS
Chiller efficiency — first chiller
this project's chiller schedule
Given: Chiller CH-1, wc_screw, 700 kWr
1. Minimum COP: COPmin from the capacity band = 700 kWr = 5.4 (ECSBC 2024 Table 12.4)
2. Full-load COP: COP ≥ COPmin → 5.6 ≥ 5.4 PASS (IPLV ≥ 6.5; baseline (ECSBC) value)
3. BEE label: star rating for the level (Table 6.12) = ECSBC = 3 star (ECSBC 2024 Table 6.12)
EPI estimate — design-stage build-up
operating hours and installed loads of this project
Given: Hours 10 h × 300 d = 3000 h/yr · Area 5000 m²
1. Lighting: EL = LPD × h / 1000 = 8 × 3000 / 1000 = 24 kWh/m²/yr
2. Equipment: EE = W/m² × h × 0.7 / 1000 = 10 × 3000 × 0.7 / 1000 = 21 kWh/m²/yr
3. Cooling incl. fans & pumps: EC = kW × EFLH / COP × 1.35 / A = 600 × 1800 / 5 × 1.35 / 5000 = 58.3 kWh/m²/yr (kW = 0.12 kW/m² placeholder)
4. EPI: EL + EE + EC + other = 24 + 21 + 58.3 + 8 = 111.3 kWh/m²/yr
5. Benchmark: EPI ≤ benchmark → 111.3 ≤ 90 CHECK

11. Standards applied

StandardUsed for
ECSBC 2024 (BEE)Energy Conservation and Sustainable Building Code 2024 — the requirement values used here (levels ECSBC / ECSBC+ / Super ECSBC)
ECSBC 2024 ch. 5Envelope: daylight Table 5.1 (p. 59), roof Tables 5.3–5.5 (p. 61–62), walls Tables 5.6–5.8 (p. 62–63), fenestration cl. 5.3.3 / Tables 5.9–5.11 (p. 63–64), skylights Table 5.15 (p. 68)
ECSBC 2024 ch. 6Comfort systems: chillers Table 6.12 + baseline COP Tables 12.4 / 12.5 (p. 78, 138), unitary / VRF Tables 6.1, 6.2, 6.19–6.24 (p. 73, 81), fans Tables 6.9–6.11, pumps 6.13–6.15, cooling towers 6.3.4 (p. 78–79), economiser 6.3.5, variable flow 6.3.6 (p. 80), controls 6.2.3 (p. 74–75)
ECSBC 2024 ch. 7Lighting: controls cl. 7.2 (p. 86–88), LPD building area Tables 7.1–7.3 (p. 91–92), space function Tables 7.4–7.6 (p. 92–96)
ECSBC 2024 ch. 8 / 9Electrical & renewable: motors 8.2.3, pf 8.2.6, UPS Table 8.8, losses 8.2.8, renewable 8.2.10 / Tables 8.9–8.10, lifts 8.2.11 (p. 99–104); service hot water 9.2.8 (p. 107)
NBCS 2026 (SP 7:2026) Part D Sec 1 / Sec 3cites ECSBC 2024 as the energy code: D1 4.2.10 and 4.6.1 notes, D3 envelope note, Fig. 10 fan efficiency, Table 38 controls compliance
BEE star rating for commercial buildingsEPI benchmarks by climate (the design-stage estimate here; the ECSBC ICM uses a simulated MEPI)
Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.