Fire fighting system — hydraulic design report

Sample project — Tower A · India — NBCS 2026 (SP 7:2026) Part F · IS 15105:2021 · IS 3844:1989 · IS 13039:2014 · TAC
Generated 28 Nov 2026 16:09
Sprinkler remote-area balancing · wet risers · external hydrants · pump & tank
Project code SAMPLE
Buildings
2
Ring main
4 pipes · 480 m
Hydrants
3 (≥ 11 for 45.0 m spacing)
Fire pump
3,600 L/min @ 118 m
Static tank
216 kL
Governing
sprinkler
Checks failing
0
NBCS 2026: give the building occupancy (Table 7A–7J row) to apply the Table 7K / 7M pump and storage — pump and tank below come from the hydraulic scenarios only

1. Design criteria

CriterionValueReference
StandardIndia — NBCS 2026 (SP 7:2026) Part F · IS 15105:2021 · IS 3844:1989 · IS 13039:2014 · TAC
Code editionNBCS 2026 (SP 7:2026) Part F (default; NBC 2016 Part 4 selectable)SP 7:2026 Part F
Sprinkler hazard classesLight hazard (LH): 2.25 mm/min over 84 m², K 57, ≥ 0.7 bar, hose 0 L/min, 30 min
Ordinary hazard (OH): 5.0 mm/min over 360 m², K 80, ≥ 0.5 bar, hose 0 L/min, 60 min
Ordinary hazard (OH) — was OH-II in IS 15105:2002: 5.0 mm/min over 360 m², K 80, ≥ 0.5 bar, hose 0 L/min, 60 min
Ordinary hazard (OH) — was OH-III in IS 15105:2002: 5.0 mm/min over 360 m², K 80, ≥ 0.5 bar, hose 0 L/min, 60 min
Ordinary hazard (OH) — was OH-III special in IS 15105:2002: 5.0 mm/min over 360 m², K 80, ≥ 0.5 bar, hose 0 L/min, 60 min
High hazard (HH) process: 12.2 mm/min over 260 m², K 115, ≥ 0.5 bar, hose 0 L/min, 120 min
High hazard (HH) — was EHP-II in IS 15105:2002: 12.2 mm/min over 260 m², K 115, ≥ 0.5 bar, hose 0 L/min, 120 min
High hazard (HH) — was EHP-III in IS 15105:2002: 12.2 mm/min over 260 m², K 115, ≥ 0.5 bar, hose 0 L/min, 120 min
IS 15105:2021 cl. 8.1.1 (2.25 L/min/m² over 84 m²), 9.17 (21 m²/head, 4.5 m), 10.5.7 (≥ 0.7 bar), Table 1 (K57/80), Table 30 (30 min)
IS 15105:2021 cl. 8.1.2 (5 L/min/m² over 360 m² — one OH class), 9.17 (12 m²/head, 4.5 m), 10.5.7 (≥ 0.5 bar), Table 1 (K80/115), Table 30 (60 min)
IS 15105:2021 cl. 8.1.2 (5 L/min/m² over 360 m² — one OH class), 9.17 (12 m²/head, 4.5 m), 10.5.7 (≥ 0.5 bar), Table 1 (K80/115), Table 30 (60 min)
IS 15105:2021 cl. 8.1.2 (5 L/min/m² over 360 m² — one OH class), 9.17 (12 m²/head, 4.5 m), 10.5.7 (≥ 0.5 bar), Table 1 (K80/115), Table 30 (60 min)
IS 15105:2021 cl. 8.1.2 (5 L/min/m² over 360 m² — one OH class), 9.17 (12 m²/head, 4.5 m), 10.5.7 (≥ 0.5 bar), Table 1 (K80/115), Table 30 (60 min)
IS 15105:2021 cl. 8.1.3 (12.2 L/min/m² over 260 m² — one HH process class), 9.17 (9 m²/head, 3.75 m), 10.5.7 (≥ 0.5 bar), Table 1 (K115/160), Table 30 (120 min); fully calculated per 10.3.2
IS 15105:2021 cl. 8.1.3 (12.2 L/min/m² over 260 m² — one HH process class), 9.17 (9 m²/head, 3.75 m), 10.5.7 (≥ 0.5 bar), Table 1 (K115/160), Table 30 (120 min); fully calculated per 10.3.2
IS 15105:2021 cl. 8.1.3 (12.2 L/min/m² over 260 m² — one HH process class), 9.17 (9 m²/head, 3.75 m), 10.5.7 (≥ 0.5 bar), Table 1 (K115/160), Table 30 (120 min); fully calculated per 10.3.2
Wet riser / standpipe1800 L/min; 3.5 bar at the topmost outlet; ≤ 7.0 bar at any outlet; main size by occupancy and height per NBCS 2026 Table 8 (100 mm / 150 mm)IS 3844 — two landing valves (2 × 900 L/min) operating on the topmost floor (wet riser per NBCS 2026 Part F Tables 7A–7J) · NBCS 2026 Part F cl. 5.1.1 (f) — ≥ 3.5 bar at the hydraulically remote and the highest hydrant · NBCS 2026 Part F cl. 5.1.1 (f) — ≤ 7.0 bar at any hydrant; orifice plates / pressure-controlled landing valves at lower levels · NBCS 2026 Part F cl. 5.1.1 (a) Table 8 — 100 mm or 150 mm main by occupancy and height (150 mm above 15 m for most rows)
External hydrants1800 L/min per hydrant, 2 operating; ≥ 3.5 bar residual; spacing ≤ 45 m; ring ≥ 100 mmIS 13039 — double-headed hydrant 2 × 900 L/min; two hydrants operating simultaneously (light / ordinary hazard) · NBCS 2026 Part F cl. 5.1.1 (f) / IS 13039 — ≥ 3.5 bar at the hydraulically remote hydrant · IS 13039 cl. 5 — hydrants ≤ 45 m apart (30 m high hazard), 2–15 m from the building
Velocity≤ 6.0 m/s sprinkler / riser; ≤ 5.0 m/s ring maintypical practice (TAC) — ≤ 6 m/s in risers
Head lossHazen-Williams · ring main DI · risers / sprinkler pipes MS; fittings 20 % of pipe lengthfittings allowance 20 % of pipe length (typical) unless counted per pipe
Fire pump150 % flow at ≥ 65 % head; shut-off ≤ 140 %; diesel standby 100 %; jockey 180 L/minNBCS 2026 Part F Tables 7A–7J (level of protection) → Table 7K / 7M pump and storage when the occupancy is given; IS 12469 pumps: 150 % flow at ≥ 65 % head, shut-off ≤ 140 %; shut-off ≤ 12 bar for buildings above 60 m
Water tankmax(calculated duration × demand, code table)NBCS 2026 Part F Table 7K / 7M — level demand × duration (30–120 min, Note 2) — or scenario demand × duration where larger
Pump shut-off / sprinkler systempump shut-off ≤ 12 bar for buildings above 60 m; sprinkler system ≤ 12 bar (else high-pressure sprinklers)NBCS 2026 Part F Table 7A Note 5 / 7B Note 5 / 7C Note 3 / 7E Note 4 · cl. 5.1.3 (f)

2. Buildings — sprinkler design areas and wet risers

BuildingHazardFloors / heightRing nodeSprinkler design area (most remote)Wet riser / standpipe
Tower AOrdinary hazard (OH)12 / 38.4 mN330 heads (5 × 7) · 360 m² · 5.00 mm/min · K80
demand 2,723 + hose 0 = 2,723 L/min at 8.73 bar (89.1 m) at the connection · remote head 0.65 bar, 60.0 L/min · density achieved 5.00 mm/min · V max 5.8 m/s · tank 163.4 kL (60 min)
2 riser(s) 150.0 mm · 1,800 L/min (system 1,800) · V 1.70 m/s · h_f 1.36 m
required at connection 7.40 bar (75.5 m) for 3.5 bar at the top outlet
PRV / orifice at landing valves on floors 1, 2 (> 7.0 bar)
Table 8: ii) above 15 m (no occupancy given — most rows) → 150 mm
OfficeLight hazard (LH)4 / 14.4 mN25 heads (2 × 3) · 84 m² · 2.25 mm/min · K57
demand 266 + hose 0 = 266 L/min at 2.71 bar (27.6 m) at the connection · remote head 0.70 bar, 47.7 L/min · density achieved 2.36 mm/min · V max 3.7 m/s · tank 8.0 kL (30 min)
1 riser(s) 100.0 mm · 1,800 L/min (system 1,800) · V 3.82 m/s · h_f 4.94 m
required at connection 5.40 bar (55.0 m) for 3.5 bar at the top outlet
Table 8: i) up to 15 m (no occupancy given — most rows) → 100 mm
0.0401.7323.4245.0166.788.403.5 bar min7 bar maxTower AOfficeorifice / PRV (> 7 bar)3.5–7 bar bandRunning pressure at the landing valve (bar), riser at its design flowHeight above riser base (m)

Riser pressure vs floor: running pressure at each landing valve with the riser at its design flow; band 3.5–7 bar (NBCS 2026 Part F cl. 5.1.1 (f) — ≤ 7.0 bar at any hydrant; orifice plates / pressure-controlled landing valves at lower levels). Static (no-flow) pressures at pump shut-off are higher — set the orifice / PRV on that basis.

3. Hydraulic calculation sheets (sprinkler remote area)

Tower A — Ordinary hazard (OH): hydraulic calculation sheet (remote head → connection)

NodeElev (m)Kq head L/minQ L/minP_t barPipeSizeID mmL mFittingsL_eq mL_tot mCV m/sp_f bar/mP_f barP_e barP_next bar
H1-738.4080.064.264.20.645B1-72525.03.46—0.003.46120.02.180.02950.1020.0000.747
H1-638.4080.069.1133.40.747B1-62525.03.46—0.003.46120.04.530.11410.3950.0001.142
H1-538.4080.085.5218.91.142B1-53232.03.46—0.003.46120.04.540.08590.2970.0001.440
H1-438.4080.096.0314.81.440B1-44040.03.46—0.003.46120.04.180.05680.1970.0001.636
H1-338.4080.0102.3417.21.636B1-34040.03.46—0.003.46120.05.530.09570.3310.0001.968
H1-238.4080.0112.2529.41.968B1-25050.03.46—0.003.46120.04.490.05020.1740.0002.141
H1-138.4080.0117.1646.52.141B1-15050.01.731×tee3.104.83120.05.490.07260.3510.0002.492
CM138.402,722.72.492X1100100.01.731×tee6.107.83120.05.780.03560.2790.0002.771
RT38.402,722.72.771FEED100.0100.048.402×ell90, 1×gate, 1×check13.3061.70120.05.780.03562.1973.7668.734
CONN0.002,722.78.734—

P_next = P_t + P_f + P_e (P_e positive when moving down toward the source). Branch lines not on the remote path carry balanced flows solved simultaneously (head-to-head balancing); all 30 head flows: H1-1 117 L/min @ 2.14 bar, H1-2 112 L/min @ 1.97 bar, H1-3 102 L/min @ 1.64 bar, H1-4 96 L/min @ 1.44 bar, H1-5 86 L/min @ 1.14 bar, H1-6 69 L/min @ 0.75 bar, H1-7 64 L/min @ 0.65 bar, H2-1 115 L/min @ 2.08 bar, H2-2 110 L/min @ 1.91 bar, H2-3 101 L/min @ 1.59 bar, H2-4 94 L/min @ 1.40 bar, H2-5 84 L/min @ 1.11 bar, H2-6 68 L/min @ 0.72 bar, H2-7 63 L/min @ 0.62 bar, H3-1 113 L/min @ 1.98 bar, H3-2 108 L/min @ 1.82 bar, H3-3 98 L/min @ 1.51 bar, H3-4 92 L/min @ 1.33 bar, H3-5 82 L/min @ 1.05 bar, H3-6 66 L/min @ 0.69 bar, H3-7 62 L/min @ 0.59 bar, H4-1 110 L/min @ 1.89 bar, H4-2 105 L/min @ 1.73 bar, H4-3 96 L/min @ 1.44 bar, H4-4 90 L/min @ 1.26 bar, H4-5 80 L/min @ 1.00 bar, H4-6 65 L/min @ 0.65 bar, H4-7 60 L/min @ 0.56 bar, H5-1 110 L/min @ 1.90 bar, H5-2 103 L/min @ 1.65 bar.

Office — Light hazard (LH): hydraulic calculation sheet (remote head → connection)

NodeElev (m)Kq head L/minQ L/minP_t barPipeSizeID mmL mFittingsL_eq mL_tot mCV m/sp_f bar/mP_f barP_e barP_next bar
H1-314.4057.047.747.70.700B1-32525.04.50—0.004.50120.01.620.01700.0760.0000.777
H1-214.4057.050.297.90.777B1-22525.04.50—0.004.50120.03.320.06440.2900.0001.066
H1-114.4057.058.9156.81.066B1-13232.02.251×tee1.804.05120.03.250.04630.1870.0001.254
CM114.40265.51.254X16565.02.251×tee3.705.95120.01.330.00390.0230.0001.277
RT14.40265.51.277FEED100.0100.024.402×ell90, 1×gate, 1×check13.3037.70120.00.560.00050.0181.4122.707
CONN0.00265.52.707—

P_next = P_t + P_f + P_e (P_e positive when moving down toward the source). Branch lines not on the remote path carry balanced flows solved simultaneously (head-to-head balancing); all 5 head flows: H1-1 59 L/min @ 1.07 bar, H1-2 50 L/min @ 0.78 bar, H1-3 48 L/min @ 0.70 bar, H2-1 56 L/min @ 0.96 bar, H2-2 53 L/min @ 0.86 bar.

4. Design scenarios on the ring main

ScenarioFlow (L/min)Head required at pump (m)Head available from pump (m)Duration (min)Tank (kL)Status
Sprinkler design area + hose — Tower A (Ordinary hazard (OH))2,723117.8129.660163.4PASS
Wet riser / standpipe — Tower A (1800 L/min, 3.5 bar at the top outlet)1,80092.6137.23054.0PASS
External hydrants — 2 × 1800 L/min at the farthest hydrants (N3, N2), ≥ 3.5 bar3,60068.1117.860216.0PASS

5. Fire pump

ItemValue
Main fire pump (electric)3,600 L/min (216.0 m³/h) @ 117.8 m (11.55 bar) — governing: sprinkler
Standby diesel pump100 % — 3600 L/min @ 118 m
Jockey pump180 L/min @ 130 m
Terrace / booster pump—
Suction water level97.00 m
Power (hydraulic / shaft η 70 %)69.3 / 99.1 kW
Curve envelopeshut-off 141.4 m = 13.9 bar (120 % PASS) · 150 % flow at 76.6 m (65 % PASS)
8030642155048231013214651161620107752duty 3600 L/min @ 117.8 mFlow (L/min)Head (m)— pump curve- - system curve

6. Fire water tank

ScenarioFlow (L/min)Duration (min)Volume (kL)
Sprinkler design area + hose — Tower A (Ordinary hazard (OH))2,72360163.4
Wet riser / standpipe — Tower A (1800 L/min, 3.5 bar at the top outlet)1,8003054.0
External hydrants — 2 × 1800 L/min at the farthest hydrants (N3, N2), ≥ 3.5 bar3,60060216.0
Code table (none applied)0.0
Adopt216.0 kL

7. Code checks — NBCS 2026 (SP 7:2026) Part F

CheckResultNote
Yard hydrants ≤ 7 bar running pressure (NBCS 2026 Part F cl. 5.1.1 (f))ACTIONorifice plate / pressure-controlled hydrant valve at N2, N3, N4
Tower A: landing valves ≤ 7 bar (NBCS 2026 Part F cl. 5.1.1 (f))ACTIONorifice plates / PRVs on floors 1, 2
Tower A: riser 150 mm ≥ NBCS 2026 Table 8 size 150 mm — row ii) above 15 m (no occupancy given — most rows)PASS
Office: landing valves ≤ 7 bar (NBCS 2026 Part F cl. 5.1.1 (f))PASS
Office: riser 100 mm ≥ NBCS 2026 Table 8 size 100 mm — row i) up to 15 m (no occupancy given — most rows)PASS
Sprinkler system pressure ≤ 12 bar (NBCS 2026 Part F cl. 5.1.3 (f))ACTIONpump shut-off 13.9 bar — high-pressure sprinklers or zone PRVs at the installation control valves

8. Ring-main node pressures

NodeTypeGL (m)Min pressure (m / bar)Required (m)Statussprinkler (bar)riser (bar)hydrant (bar)
N1pump100.0065.1 / 6.39—PASS11.268.796.39
N2hydrant100.5039.9 / 3.9235.7PASS > 7 bar: orifice10.158.243.92
N3hydrant101.0038.7 / 3.7989.1PASS > 7 bar: orifice9.037.693.79
N4hydrant100.8051.6 / 5.06—PASS > 7 bar: orifice10.128.215.06

9. Ring-main pipes

PipeL (m)Size (mm)ID (mm)MaterialCQ max (L/min)V max (m/s)h_f (m)Status
N1 → N2120.0100100.0DI1402,1194.5024.70PASS
N2 → N3120.0100100.0DI1401,3622.8910.89PASS
N3 → N4120.0100100.0DI1401,4813.1412.72PASS
N4 → N1120.0100100.0DI1401,4813.1412.72PASS

10. Worked example

Worked from this project’s own inputs and results — the values can be traced to the calculation sheets and tables above.

Sprinkler remote area — Tower A, Ordinary hazard (OH)
first sprinklered building; the hydraulic calculation sheet continues node by node to the connection
Given: density 5.00 mm/min · design area 360 m² · K 80 · Pmin 0.50 bar · grid 3.46 m
1. Area per head: Ahead = s² = 3.46² = 12.0 m²
2. Heads in the design area: n = ⌈A / Ahead⌉ = ⌈360 / 12.0⌉ = 30 (5 branch lines × 7 heads (⌈1.2·√A / s⌉))
3. Minimum head flow: q = max(density·Ahead, K·√Pmin) = max(60.0, 80 × √0.50 = 56.6) = 60.0 L/min
4. Remote-head pressure: P = (q / K)² = (60.0 / 80)² = 0.645 bar
5. First pipe B1-7 (25 mm): pf = 6.05×10⁵·Q1.85 / (C1.85·d4.87) = C 120.0, Ltot 3.46 m = 0.0295 bar/m (Pf = 0.102 bar)
6. Next node: Pnext = Pt + Pf + Pe = 0.645 + 0.102 + 0.000 = 0.747 bar
7. At the connection: balanced flows summed to the riser connection = 2,723 L/min at 8.73 bar (+ hose 0 L/min = 2,723 L/min)
8. Density achieved: ≥ design density → 5.00 ≥ 5.00 mm/min PASS
Wet riser — Tower A (tallest, 38.4 m)
the most remote riser carries the first-riser flow; residual pressure at the topmost landing valve
Given: Q 1,800 L/min · riser 2 × 150.0 mm MS · Ptop 3.5 bar
1. Main size — NBCS 2026 Part F Table 8: by occupancy and height = row ii) above 15 m (no occupancy given — most rows) (p. 2827) = 150 mm
2. Adopted size: riser ≥ code size → 150.0 ≥ 150 mm PASS
3. Velocity: V = Q / (π·d²/4) = 0.0300 / (π × 0.1500² / 4) = 1.70 m/s
4. Velocity limit: V ≤ Vmax → 1.70 ≤ 6.0 m/s PASS
5. Friction (Hazen-Williams): hf = 10.67·L·Q1.852 / (C1.852·d4.87) = L = 38.4 + 10.0 + fittings 9.7 m, Q = 0.0300 m³/s, d = 0.1500 m = 1.36 m
6. Pressure at the riser base: Pbase = Ptop·10.197 + H + hf = 3.5 × 10.197 + 38.4 + 1.36 = 75.5 m (7.40 bar)
7. Landing-valve pressure: ≤ 7.0 bar at every outlet (orifice / PRV above it) → floors 1, 2 above 7.0 bar → orifice plate / PRV PASS
Fire pump duty, envelope and storage
the ring main is solved for every scenario; the pump takes the largest flow and the largest head
Given: sprinkler 2,723 L/min @ 117.8 m · riser 1,800 L/min @ 92.6 m · hydrant 3,600 L/min @ 68.1 m
1. Duty flow: Q = max(scenario flows, code table) = 2,723, 1,800, 3,600 = 3,600 L/min (216.0 m³/h)
2. Duty head: H = max(scenario head at the pump) = 117.8, 92.6, 68.1 = 117.8 m (11.55 bar; governing: sprinkler)
3. Hydraulic power: Ph = ρ·g·Q·H = 1000 × 9.81 × 0.0600 × 117.8 / 1000 = 69.3 kW (shaft 99.1 kW at η 70 %)
4. 150 % flow head: H150 ≥ 65 % H → 76.6 m = 65 % PASS
5. Shut-off head: H0 ≤ 140 % H → 141.4 m = 120 % = 13.9 bar PASS
6. Storage: V = max(Qsc·tsc, code table) = max(3,600 × 60 / 1000, 0.0) = 216.0 kL

11. Bill of quantities (ring main)

MaterialSize (mm)Length (m)
DI100480.0

12. Formulae applied

QuantityFormulaReference
Sprinkler dischargeQ (L/min) = K · √P (bar)NFPA 13 cl. 27.2.2.2 / IS 15105 cl. 11
Minimum head flowq_head = max( density × area per head , K·√P_min )NFPA 13 cl. 27.2.4.1 / IS 15105
Design area & headsn = ⌈A_design / A_head⌉ ; heads per branch = ⌈1.2·√A_design / S_head⌉NFPA 13 cl. 27.2.4.3 (1.2·√A rule)
Hazen-Williamsh_f = 10.67·L·Q^1.852 / (C^1.852·D^4.87) (SI) ≡ p = 6.05·Q^1.85·10⁵ / (C^1.85·d^4.87) bar/mNFPA 13 cl. 27.2.2.1 / IS 15105 cl. 11.4
FittingsL_eq from the equivalent-length table (C = 120), × (120/C)^1.85NFPA 13 Table 28.2.3.1.2
ElevationP_e = 0.098 bar per metreNFPA 13 cl. 27.2.2.4
Network solutionGlobal gradient algorithm with sprinkler heads as emitters Q = K·√P (implicit head-to-head balancing)Todini & Pilati 1988 (EPANET) — equivalent to NFPA 13 ch. 27 step-by-step balancing
Standpipe / wet riser demandQ = Q_first + Q_add × (n − 1) ≤ Q_max ; P_base = P_top + 0.098·H + h_f(riser + fittings)NFPA 14 cl. 7.10 / IS 3844
Pump demandQ_pump = max(sprinkler + hose, riser/standpipe, hydrant × n_sim, code table) ; H_pump = max over scenarios of head required at the pumpNFPA 20 cl. 4.8 / NBCS 2026 Part F Table 7K / 7M
Pump curve checkH(0) ≤ 140 % H_rated ; H(150 % Q) ≥ 65 % H_ratedNFPA 20 cl. 6.2 / IS 12469
TankV = max( (Q_sprinkler + Q_hose) × t_duration , Q_riser × t_riser , code table )NFPA 22 / NFPA 13 Table 19.2.3.1.2 / NBCS 2026 Part F Table 7K / 7M

13. Standards and references