SAMPLE Project hub — one building, every tool — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

Project hub

Sample project — Tower A · one building, every tool
Generated 28 Nov 2026 16:09
Links, staleness, re-run, roll-up BOQ
Project code SAMPLE

1. The chain

ToolBuilt fromWhat flows
Building model—storeys, rooms with walls, doors, glazing
Heat loadbuildingrooms, envelope
Lighting designbuildingrooms with shapes → luminaires
Load estimationbuilding + lightingrooms, lighting watts → circuits, DBs, panels
Power distributionloadfeeder schedule → fault levels, cables
Electrical layoutslighting + PDDluminaires → circuits on the plan; cables → tray
LPS & earthingbuildingroof outline
Sprinkler layoutbuildingrooms → heads, pipes, zones
Sprinkler calc sheetsprinkler layoutthe governing zone's pipes
Building drainagebuildingstoreys → stacks

2. Staleness

A tool is stale when its source project was saved after the tool last imported from it. Re-run re-imports in place — the tool's own settings, DB positions, riser points and room overrides are kept where the importer can match them.

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.