SAMPLEIDMT relay setting & grading — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
IDMT relay setting & grading
Sample project — Tower A · Electrical
Generated 28 Nov 2026 17:16 Overcurrent / earth-fault IDMT relays: plug setting from the load, operating time at the f… Project code SAMPLE
Relays
3
Fastest trip
0.177 s
Slowest trip
0.439 s
Grading
OK
1. Inputs
Group
Input
Value
Unit
Relays (downstream first)
One relay per line: name, kV, CT primary A, plug setting ×In, TMS (0 = auto), curve SI/VI/EI/LTI, max fault current at the relay A
Grading LT incomer → HT transformer feeder: fault 25000 A × 0.415/11 = 943 A; PSM 9.43; t = 0.732 s; margin 0.311 s
5. Notes
Grading at the maximum fault current the downstream relay sees (fault just beyond it) — the point where the curves are closest for inverse characteristics.
Across a transformer the fault current is referred by the voltage ratio; delta–star transformers change the current distribution for earth faults — check earth-fault relays separately.
Add a high-set instantaneous (50) element above the maximum through-fault and below the minimum fault at the relay where the impedance allows; check transformer inrush (typically 8–12 × rated for 0.1 s) against the pick-up.
6. Standards and references
IEC 60909-0:2016 — Short-circuit currents in three-phase a.c. systems — Calculation of currents: Impedance method, voltage factor c (1.05 / 1.10 max, 0.95 min), peak factor κ = 1.02 + 0.98·e^(−3R/X), Ik" = c·Un/(√3·Zk)
IEC 60255-151:2009 — Measuring relays — Overcurrent protection functional requirements: IDMT / definite-time characteristics used in discrimination curves
IEEE Std 242-2001 (Buff Book) — Recommended practice for protection and coordination of industrial and commercial power systems: Relay grading margins and coordination practice
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.