SAMPLEInsulation thickness, condensation & condensate drain — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
11. Condensate: m = qL × 3600 / 2450 = 26.38 × 3600 / 2450 = 38.8 kg/h(drain DN 25 by the practice table)
5. Notes
IS 14164 / ASHRAE: condensation control requires the outer surface above the ambient dew point at the design (monsoon) condition — use the worst RH, not the summer design point.
Drain sizes from common practice (¾ in to 3 in by capacity); provide a trap and vent, slope ≥ 1 %.
NBCS 2026 D3 10.6.1-10.6.2: chilled / heated pipes and ducts insulated against heat gain and condensation, vapour seal on chilled-water pipes; materials fire resistant, no noxious smoke or toxic fumes, non-hygroscopic.
NBCS 2026 Part F 3.5.7.3.5: duct insulation inside or outside of non-combustible type, not wrapped or secured with combustible material. D3 10.6.4: PUF / polyurethane not to be used on ducts; elastomeric tubes only with full cladding on smaller pipes, not on ducts. Elastomeric pipe insulation: provide full protective cladding (D3 10.6.4).
Minimum insulation R-values for energy compliance: ECSBC 2024 (cited by NBCS D3) — not checked here.
6. Standards and references
ASHRAE Handbook — Fundamentals 2021 — Psychrometrics (ch. 1), climatic design (ch. 14), cooling/heating load (ch. 18), solar (1997 ch. 29): Load calculation method, solar heat gain, sol-air temperature
ISHRAE Handbook / weather data — Indian climatic design conditions: City design DB / WB, daily range
IS 14164:2008 — Industrial application and finishing of thermal insulation materials: Insulation thickness practice, condensation control
NBCS 2026 (SP 7:2026) Part D Sec 3 — National Building Construction Standards — Air conditioning, heating and mechanical ventilation: Design conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation
NBCS 2026 (SP 7:2026) Part F — National Building Construction Standards — Fire and life safety: Means of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.