calc.designlink.inInsulation resistance & polarisation index
Sample project — Tower A · Electrical
Generated 28 Nov 2026 17:16
Test voltage, measured insulation resistance corrected to 40 °C, minimum IR, polarisation …
Project code SAMPLE
1. Inputs
| Group | Input | Value | Unit |
|---|
| Equipment | What is tested | Motor / generator winding (IEEE 43) | |
| Equipment | Rated voltage | 0.415 | kV |
| Equipment | Winding | Random-wound and form-wound below 1 kV (5 MΩ) | |
| Equipment | Insulation class | Class F | |
| Readings | IR at 30 s (0 = not read) | 0 | MΩ |
| Readings | IR at 1 min | 450 | MΩ |
| Readings | IR at 10 min (0 = not read) | 1200 | MΩ |
| Readings | Winding temperature during the test | 30 | °C |
2. Results
IEEE 43 evaluation
| Item | Value | Unit | Note / basis |
|---|
| Test voltage (rated voltage) | 500 V | DC | |
| Temperature correction Kt = 0.5^((40 − T)/10) | 0.5 | | |
| IR(1 min) corrected to 40 °C | 225.0 | MΩ | |
| Minimum IR(1 min, 40 °C) | 5.0 | MΩ | |
| Polarisation index IR10 / IR1 | 2.67 | | |
3. Checks
| Check | Result | Note |
|---|
| IR(1 min) at 40 °C 225.0 MΩ ≥ 5 MΩ | PASS | IEEE 43 recommended minimum |
| Polarisation index 2.67 ≥ 2 (class F) | PASS | IEEE 43 minimum PI |
4. Worked example
IR40 = 450 × 0.5^((40 − 30)/10) = 450 × 0.500 = 225.0 MΩ; PI = 1200 / 450 = 2.67
5. Notes
- Discharge the winding after the test for at least four times the test duration; record temperature and humidity with every reading — trends matter more than one value.
6. Standards and references
- IEC 60364-6 — Low-voltage installations — verification: Initial verification: inspection and testing, reporting
- IEC 60034-1 — Rotating electrical machines — rating and performance: Alternators and motors
- IEEE Std 43-2013 — Recommended practice for testing insulation resistance of electric machinery: Insulation resistance and polarisation index of rotating machines
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.