SAMPLE Lightning protection (IEC 62305) — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

Lightning protection (IEC 62305)

Sample project — Tower A · Electrical
Generated 28 Nov 2026 16:09
Risk R1 per IEC 62305-2 (collection areas, dangerous events, probabilities, losses) agains…
Project code SAMPLE
R1 without LPS
2.10e-05 /yr
LPS class
IV
R1 with LPS
4.07e-06 /yr
Mesh / sphere
20 m / r 60 m
Down conductors
10 nos
Earth resistance
1.601 Ω

1. Inputs

GroupInputValueUnit
StructureLength60m
StructureWidth25m
StructureHeight to roof / parapet30m
StructureHighest protrusion (lift MR, OHT, mast) above roof4m
StructureLocation factor CdSurrounded by objects of same height or smaller (0.5)
StructureUse of the structureResidential / apartments
StructurePersons in the structure (nz)400
StructureConstructionRCC frame (rebar can serve as natural down conductor)
StructureRoofFlat RCC with parapet
Lightning densityPlace (NBCS 2026 / NBC 2016 cl. 11.8 thunderstorm days → Ng = 0.1 Td)Delhi — Td 30
Risk factors (IEC 62305-2 Annex B/C)Fire risk rfOrdinary — 400–800 MJ/m² (0.01)
Risk factors (IEC 62305-2 Annex B/C)Fire provisions rpExtinguishers, hydrants, manual alarm, fire brigade < 10 min (0.5)
Risk factors (IEC 62305-2 Annex B/C)Floor surface (touch/step) rtMarble, ceramic tiles (10⁻³)
Risk factors (IEC 62305-2 Annex B/C)Touch-voltage measures PTANone (1)
Risk factors (IEC 62305-2 Annex B/C)Environment of incoming lines CEUrban (0.1)
Risk factors (IEC 62305-2 Annex B/C)Power lineBuried cable
Risk factors (IEC 62305-2 Annex B/C)Power line length (from last pole / transformer)500m
Risk factors (IEC 62305-2 Annex B/C)HV/LV transformer at the structure (CT = 0.2)True
Risk factors (IEC 62305-2 Annex B/C)Telecom / data lineBuried
Risk factors (IEC 62305-2 Annex B/C)Telecom line length500m
Risk factors (IEC 62305-2 Annex B/C)Coordinated SPD protection on lines (PEB)Auto — SPD level to match the LPS class
Risk factors (IEC 62305-2 Annex B/C)Tolerable risk RT1e-05/yr
Risk factors (IEC 62305-2 Annex B/C)Tolerable frequency of damage FT (internal systems, IEC 62305-2 : 2024)0.1/yr
LPS designCode editionNBCS 2026 (SP 7:2026) Part D Sec 2 — IEC 62305 : 2024
LPS designClass of LPSAuto — lowest class that brings R1 ≤ RT
LPS designAir-termination methodMesh on the roof + rods at corners / protrusions
LPS designAir-termination rod height1.0m
LPS designConductor materialHot-dip galvanised steel strip / rod
LPS designSoil resistivity ρ100Ω·m
LPS designTarget earth resistance10Ω

2. Results

Dangerous events (IEC 62305-2 Annex A)

ItemValueUnitNote / basis
Ground flash density Ng3.0/km²·yrDelhi — Td 30 (NBCS 11.8), Ng = 0.1·Td
Collection area of the structure Ad51525.13m²L·W + 2·3H·(L+W) + π(3H)²
Location factor Cd0.5
Flashes to the structure ND7.729e-02/yr
Flashes near the structure NM2.611e+00/yrAm within 500 m
Power line (buried, 500 m): NL / NI6.00e-04 / 6.00e-02/yrAL = 20000 m², AI = 2000000 m²
Telecom line (buried, 500 m): NL / NI3.00e-03 / 3.00e-01/yrAL = 20000 m², AI = 2000000 m²

Loss factors (Annex C)

ItemValueUnitNote / basis
Loss by fire LF (type of structure)0.01
Panic / evacuation factor hz5
Fire risk rf0.01
Fire provisions rp0.5
Floor surface rt0.001
LA = rt·LT (touch/step)1.00e-05
LB = rp·rf·hz·LF (physical damage)2.50e-04

Risk components with LPS class IV, SPD III (Annex B)

ItemValueUnitNote / basis
PB (LPS)0.2
PEB (SPD on lines)0.05
RA — injury by touch/step near the structure1.55e-07/yr
RB — physical damage, flash to structure3.86e-06/yr
RU — injury, flash to line1.80e-09/yr
RV — physical damage, flash to line4.50e-08/yr
R1 total4.07e-06/yr
Tolerable RT1e-05/yr
Frequency of damage F = FC + FM + FW + FZ (indicative)3.21e-02/yrFC 3.9e-03 · FM 2.1e-02 · FW 1.8e-04 · FZ 7.2e-03; FT 0.1

Air termination — class IV

ItemValueUnitNote / basis
Rolling sphere radius60m
Mesh size20 × 20m
Mesh conductors along L / along W3 / 4nosincluding the perimeter conductor on the parapet
Mesh conductor length280.0m
Rod height1.0m
Protective angle at 1 m79.0°
Rod protected radius at roof level5.14m
Max rod spacing (rolling sphere)21.82m
Air-termination rods4nosat the four corners + one per protrusion
Protrusion 4 m: rod 5.0 m, α = 73.0°, protected radius16.35m

Down conductors

ItemValueUnitNote / basis
Perimeter170.0m
Typical spacing (NBCS Table 4)20m
Number of down conductors10nosone at each corner, each facade split ≤ 20 m (largest gap 20.0 m)
Natural down conductorsRCC rebars / steel columns — electrically continuous, tied at every floor, test joints at 0.5 m AFL
ConductorGI strip 25 × 3 mm (75 mm²) / 8 mm dia rod — Table 7 min. 50 mm²
Separation distance s in air (kc = 0.44, km = 1)0.528mto unbonded metal on the roof / facade
Separation distance through concrete / brick (km = 0.5)1.06m

Earth termination — Type B ring

ItemValueUnitNote / basis
Soil resistivity100.0Ω·m
Minimum vertical electrode length (NBCS Table 5)2.5m
Ring 1 m from the walls, 0.5 m deep62 × 27mlength 178 m
Mean radius re23.08m
Extra vertical electrode length per down conductor0.0m
Ring resistance3.3Ω
3 m rod resistance (each)31.13Ω
Combined with 10 rods at the down conductors1.6Ω
Electrode materialGI strip 25 × 6 mm or 16 mm dia rod (Table 8: steel tape 90 mm² / rod 14 mm)
Bondingring bonded to the building earth mat / power earth, main equipotential bar at each down conductor test joint (IEC 62305-3 §6); all earthing interconnected (NBCS 8.2.20)

SPDs and internal LPS (IEC 62305-4 / IEC 61643-11 / NBCS 11.7)

ItemValueUnitNote / basis
Type 1 (Class I) SPD at the main LT panelIimp ≥ 12.5 kA (10/350) per pole L–N; N–PE ≥ 50 kA (3-phase) / 25 kA (1-phase)LPL IV: 50 % of the LPS current to a 3-phase 4-wire service (11.7.3); minimum per 11.7.4.5.1
Type 2 (Class II) SPD at sub-DBs / floor DBsIn ≥ 20 kA (8/20) typical; NBCS minimum In 5 kA L–N, 20 kA N–PE (3-phase) / 10 kA (1-phase)11.7.4.5.3
Voltage protection level / UcUp ≤ 1.5 kV for 240/415 V equipment; Uc ≥ 1.1 × 230 = 253 V11.7.4.5.5 / 11.7.4.14
Type 3 / signal SPDsat sensitive equipment, telecom & data entry (Cat 6 / RS-485 / coax); lifts, fire panels, CCTV, PV (11.7.4.9–10)
Equipotential bondingall incoming services, metal pipes, cable trays, lift rails bonded at entry to the MEB / MET (11.7.3)

Risk R1 vs protection level

LPSSPDR1 /yr≤ RT
nonenone2.10e-05
IVIII4.07e-06✓
IIIIII2.06e-06✓
IIII1.02e-06✓
II2.10e-07✓

IEC 62305-3 parameters by class (NBCS Tables 3, 4, 5)

ClassSphere r (m)Mesh (m)Down-conductor spacing (m)kiPBIimp Type 1 (kA)Table 5 length at 100 Ω·m (m)
I205100.080.02252.5
II3010100.060.0518.752.5
III4515150.040.112.52.5
IV6020200.040.212.52.5

Bill of quantities (preliminary)

ItemQtyUnit
Air-termination rod 1 m with base5nos
Roof mesh conductor GI strip 25 × 3 mm (75 mm²) / 8 mm dia rod308m
Down conductor (external) GI strip 25 × 3 mm (75 mm²) / 8 mm dia rod0m
Test joints / rebar clamps10nos
Ring earth electrode GI strip 25 × 6 mm or 16 mm dia rod187m
Earth rods 3 m with inspection pit10nos
Type 1 SPD (4P, 3+1 with N–PE ≥ 50 kA)1set
Type 2 SPD (4P)1 per DBset
Bonding bar / MEB1nos
Ring earth electrode 62 × 27 m, 0.5 m deepDC1DC2DC3DC4DC5DC6DC7DC8DC9DC10Lift MR +4 mClass IV — mesh 20 × 20 m (orange), rods (red), down conductors (blue), ring earth (green dashed). 60 × 25 m roof.Risk components R1 (log scale) — without LPS vs class IV + SPD III, tolerable RT = 1e-05 /yr1e-101e-91e-81e-71e-61e-51e-41e-3RTRA7.7e-071.5e-07RB1.9e-053.9e-06RU3.6e-081.8e-09RV9.0e-074.5e-08RC…RZ00R12.1e-054.1e-06no LPSwith LPS + SPDProtective angle α vs height h of the air termination above the protected plane (IEC 62305-3 Fig. 1 / NBCS Fig. 19)0°10°20°30°40°50°60°70°80°0 m10 m20 m30 m40 m50 m60 mIIIIIIIVroof rod: h 1 m → α 79°, radius 5.1 mrod on protrusion: h 5 m → α 73°, radius 16.4 mBold: class IV. Beyond the end of each curve only the rolling-sphere and mesh methods apply; α is constant below 2 m.

3. Checks

CheckResultNote
R1 without LPS = 2.10e-05 vs RT = 1.00e-05CHECKLPS required
R1 with LPS class IV + SPD III = 4.07e-06 ≤ RTPASSauto-selected
Frequency of damage F ≈ 3.21e-02 ≤ FT = 0.1 /yr (indicative, internal systems)PASSIEC 62305-2 : 2024 frequency-of-damage check — coordinated SPDs / shielding lower F (NBCS 11.2 b)
Mesh 20 × 20 m: sphere sag 839 mm between conductorsPASSrolling sphere r = 60 m
Earth resistance ≈ 1.6 Ω ≤ 10 ΩPASSring 178 m + 10 × 3 m rods in ρ = 100 Ω·m; NBCS 11.6.3: < 10 Ω recommended
Ring mean radius re = 23.1 m ≥ Table 5 length = 2.5 mPASSNBCS Table 5 class IV, ρ 100 Ω·m (11.6.3.2)
Ring conductors at ground level and every 10–20 m of height: H 30 m → 1 intermediate level(s)PASSNBCS 11.6.2.4 — fulfilled by electrically continuous RCC / steel frame

4. Worked example

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Risk R1 — flashes to the structure and physical damage
this building's own dimensions, location and use
Given: Structure 60 × 25 m, H 30 m + protrusion 4 m · Lightning density Ng = 3 /km²·yr (Delhi, Td 30, NBCS 11.8)
1. Collection area: AD = L·W + 2·3H·(L + W) + π(3H)² = 60·25 + 2·3·34·(60 + 25) + π(3·34)² = 51 525 m²
2. Flashes to the structure: ND = Ng · AD · CD · 10⁻⁶ = 3 · 51525 · 0.5 · 10⁻⁶ = 7.729e-02 /yr
3. Loss by physical damage: LB = rp · rf · hz · LF = 0.5 · 0.01 · 5 · 0.01 = 2.50e-04
4. Physical damage risk: RB = ND · PB · LB = 7.729e-02 · 0.2 · 2.50e-04 = 3.86e-06 /yr (class IV)
5. Total: R1 = RA + RB + RU + RV (+ RC…RZ) = 1.55e-07 + 3.86e-06 + 1.80e-09 + 4.50e-08 = 4.07e-06 /yr
6. Tolerable risk: R1 ≤ RT = 1e-05 → without LPS 2.10e-05; with class IV + SPD III: 4.07e-06 PASS
7. Frequency of damage (indicative): F ≤ FT = 0.1 /yr → 3.9e-03 + 2.1e-02 + 1.8e-04 + 7.2e-03 = 3.21e-02 PASS (IEC 62305-2 : 2024)
Class IV — mesh, down conductors and separation distance
the class chosen above applied to this roof
Given: Class IV (NBCS Tables 3, 4) sphere r = 60 m, mesh 20 m, DC spacing 20 m, ki 0.04
1. Sphere sag between mesh conductors: d = r − √(r² − (m/2)²) = 60 − √(60² − 10²) = 839 mm
2. Down conductors (a DC at every corner): n = 2·⌈L / s⌉ + 2·⌈W / s⌉ = 2·⌈60 / 20⌉ + 2·⌈25 / 20⌉ = 2·3 + 2·2 = 10 nos (same rule as the LPS layout and CAD tools)
3. Separation distance: s = ki · kc / km · l = 0.04 · 0.44 / 1 · 30 = 0.53 m
Earth termination — Type B ring + rods
ρ = 100 Ω·m
1. Ring mean radius: re = √(Aring / π) = √(62 · 27 / π) = 23.08 m
2. Minimum electrode length (NBCS Table 5, 11.6.3.2): re ≥ 2.5 m (class IV, ρ 100 Ω·m) → 23.1 m PASS
3. Combined resistance: R = 1 / (1/Rring + n / Rrod) = 1 / (1/3.30 + 10 / 31.13) = 1.6 Ω
4. Target: R ≤ 10 Ω → 1.60 Ω PASS (NBCS 11.6.3: < 10 Ω recommended)

5. Notes

6. Standards and references

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.