SAMPLELoad estimation & DB schedules — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
Electrical load estimation & DB schedules
Sample project — Tower A · Indian regime · NBCS 2026 · 6 rooms · 2 boards
Indian — NBCS 2026 (SP 7:2026) Part D Sec 2 · IS 732 · CPWD General Specifications (Electrical) Part I · ECSBC 2024
project
Code edition
NBCS 2026 (SP 7:2026) Part D Sec 2 — default
project
Type of building (diversity column)
Small shops, stores, offices and business premises
NBCS 4.2.2.2
Lighting density
ECSBC 2024 cl. 7.3.3, Tables 7.4 / 7.5 / 7.6 (space function LPD, PDF p. 92–96 — the energy-code tool's table) — per room type, W/m²
energy code
Small power
room-type raw-power VA/m² (CPWD practice) or the socket points (6 A = 100 W, 16 A = 1000 W), whichever is higher; building check against NBCS 5.9.2 (≥ 55 W/m²) in section 5
code / practice
Air-conditioning
split units 1500 W each from the room's W/m²; central HVAC = AHU / FCU share per room, plant as an extra load on the HVAC panel
project
Demand factors
Lighting 90 % (4.2.2.2 Sl i); Small power 50 % (cl. 5.9.2); Equipment 100 % largest + 75 % rest (4.2.2.2 Sl ii / xiv); Central AC low side 90 % (4.2.2.2 Sl iv low side); Central AC plant 80 % (4.2.2.2 Sl iv high side); Cooking 100 % largest + 80 % second + 60 % rest (4.2.2.2 Sl v); Motors / pumps 100 % largest + 80 % second + 60 % rest (4.2.2.2 Sl vii); Lifts 100 % (4.2.2.2 Sl viii); Split AC 100 % up to 200 m², 85 % beyond (Sl iii) · sub-panel 0.9 · main 0.85 (overall load factor within the 50–90 % of the note to NBCS 4.2.2.2)
NBCS 2026 Part D Sec 2 cl. 4.2.2.2 diversity table (by type of building) and cl. 5.9.2 (power ≤ 50 %)
Circuit rules
NBCS 2026 Part D Sec 2 cl. 5.4.4.3: mixed circuit (lights, fans, 6 A sockets) ≤ 10 points and 800 W, dedicated lighting ≤ 20 points / 800 W, 6 A socket circuit ≤ 8 nos / 800 W, fans ≤ 10, 16 A outlets ≤ 2 per circuit on 4 mm² Cu; cl. 5.4.4.7 sub-circuit ≤ 3 000 W · CPWD General Specifications Part I: separate circuit per AC
wiring code
System
415 V, pf 0.9, boards combined LPDB per floor and zone, floor panels
project
2. Room-wise connected load
Floor
Room
Type
m²
Light W
Light pts
6 A
16 A
Power W
AC
AC W
HVAC W
Equipment W
Total W
W/m²
Board
GF
Reception
Reception / waiting
40.0
364
11
2
1
1200
split × 3
4500
0
200
6264
156.6
auto
GF
Open office
Open-plan office
180.0
1800
50
9
7
7900
split × 11
16500
0
900
27100
150.6
auto
GF
Meeting room
Meeting / conference room
30.0
345
10
2
1
1200
split × 2
3000
0
300
4845
161.5
auto
GF
Toilets
Toilet / washroom
24.0
185
6
1
1
1100
none
0
0
240
1525
63.5
auto
FF
Open office
Open-plan office
240.0
2400
67
12
10
11200
split × 15
22500
0
1200
37300
155.4
auto
FF
Server room
Server / data / hub room
20.0
142
4
1
2
2100
split × 6
9000
0
10000 (Racks via UPS)
21242
1062.1
auto
Floor
Rooms
m²
Lighting
Small power (sockets)
Split AC
Central HVAC (AHU / FCU)
Equipment
Total W
W/m²
GF
4
274.0
2,694
11,400
24,000
0
1,640
39,734
145.0
FF
2
260.0
2,542
13,300
31,500
0
11,200
58,542
225.2
Bars: demand of the floor's boards by category (central HVAC = AHU / FCU share at the HVAC panel's factor); dashes: connected load. Plant loads at the panels (lifts, pumps, chillers) are not floor loads — see section 4.
3. Distribution-board schedules
LPDB-GF — GF · TPN 18-way · fed from FP-GF
Connected
39.73 kW
Demand
32.86 kW · 36.51 kVA
Ib
50.8 A
Incomer
80 A FP MCCB isolator
Earth leakage
100 A FP RCCB 30 mA
Unbalance
0.9 %
Ckt
Ph
Description
Points
Load W
Ib A
MCB
Wire mm²
1
B
Lighting & 6 A sockets — Reception
7
282
1.4
6 A SP
1.5
2
B
Lighting & 6 A sockets — Reception
6
282
1.4
6 A SP
1.5
3
Y
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
4
B
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
5
R
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
6
Y
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
7
B
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
8
R
Lighting & 6 A sockets — Open office
9
450
2.2
6 A SP
1.5
9
Y
Lighting & 6 A sockets — Meeting room
6
272
1.3
6 A SP
1.5
10
R
Lighting & 6 A sockets — Meeting room
6
272
1.3
6 A SP
1.5
11
Y
Lighting & 6 A sockets — Toilets
7
285
1.4
6 A SP
1.5
12
Y
16 A sockets (1) — Reception
1
1000
4.8
20 A SP
4
13
R
AC unit 1 — Reception
1
1500
7.2
20 A SP
4
14
Y
AC unit 2 — Reception
1
1500
7.2
20 A SP
4
15
B
AC unit 3 — Reception
1
1500
7.2
20 A SP
4
16
R
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
17
Y
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
18
B
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
19
B
16 A sockets (1) — Open office
1
1000
4.8
20 A SP
4
20
R
AC unit 1 — Open office
1
1500
7.2
20 A SP
4
21
Y
AC unit 2 — Open office
1
1500
7.2
20 A SP
4
22
B
AC unit 3 — Open office
1
1500
7.2
20 A SP
4
23
R
AC unit 4 — Open office
1
1500
7.2
20 A SP
4
24
Y
AC unit 5 — Open office
1
1500
7.2
20 A SP
4
25
B
AC unit 6 — Open office
1
1500
7.2
20 A SP
4
26
R
AC unit 7 — Open office
1
1500
7.2
20 A SP
4
27
Y
AC unit 8 — Open office
1
1500
7.2
20 A SP
4
28
B
AC unit 9 — Open office
1
1500
7.2
20 A SP
4
29
R
AC unit 10 — Open office
1
1500
7.2
20 A SP
4
30
Y
AC unit 11 — Open office
1
1500
7.2
20 A SP
4
31
R
Equipment — Open office
1
900
4.3
16 A SP
4
32
Y
16 A sockets (1) — Meeting room
1
1000
4.8
20 A SP
4
33
B
AC unit 1 — Meeting room
1
1500
7.2
20 A SP
4
34
R
AC unit 2 — Meeting room
1
1500
7.2
20 A SP
4
35
B
16 A sockets (1) — Toilets
1
1000
4.8
20 A SP
4
Phase loads R 13072 · Y 12957 · B 12964 W · demand by category: Lighting 2,694 → 90 % (4.2.2.2 Sl i) = 2,425, Small power (sockets) 11,400 → 50 % (cl. 5.9.2) = 5,700, Split AC 24,000 → 100 % up to 200 m², 85 % beyond: 250 m² → 97.0 % (4.2.2.2 Sl iii) = 23,280, Equipment 1,640 → 100 % largest + 75 % rest (4.2.2.2 Sl ii / xiv) = 1,455 · circuit wiring FRLS Cu, 1.5 mm² lighting / 4 mm² power / 4 mm² AC, earth per IS 3043 / IEC 60364-5-54
LPDB-FF — FF · TPN 18-way · fed from FP-FF
Connected
58.54 kW
Demand
50.25 kW · 55.83 kVA
Ib
77.7 A
Incomer
100 A FP MCCB isolator
Earth leakage
100 A FP RCCB 30 mA
Unbalance
1.1 %
Ckt
Ph
Description
Points
Load W
Ib A
MCB
Wire mm²
1
Y
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
2
B
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
3
Y
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
4
B
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
5
Y
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
6
B
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
7
R
Lighting & 6 A sockets — Open office
10
450
2.2
6 A SP
1.5
8
Y
Lighting & 6 A sockets — Open office
9
450
2.2
6 A SP
1.5
9
B
Lighting & 6 A sockets — Server room
5
242
1.2
6 A SP
1.5
10
R
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
11
Y
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
12
B
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
13
R
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
14
Y
16 A sockets (2) — Open office
2
2000
9.7
20 A SP
4
15
R
AC unit 1 — Open office
1
1500
7.2
20 A SP
4
16
Y
AC unit 2 — Open office
1
1500
7.2
20 A SP
4
17
B
AC unit 3 — Open office
1
1500
7.2
20 A SP
4
18
R
AC unit 4 — Open office
1
1500
7.2
20 A SP
4
19
Y
AC unit 5 — Open office
1
1500
7.2
20 A SP
4
20
B
AC unit 6 — Open office
1
1500
7.2
20 A SP
4
21
R
AC unit 7 — Open office
1
1500
7.2
20 A SP
4
22
Y
AC unit 8 — Open office
1
1500
7.2
20 A SP
4
23
B
AC unit 9 — Open office
1
1500
7.2
20 A SP
4
24
R
AC unit 10 — Open office
1
1500
7.2
20 A SP
4
25
Y
AC unit 11 — Open office
1
1500
7.2
20 A SP
4
26
B
AC unit 12 — Open office
1
1500
7.2
20 A SP
4
27
R
AC unit 13 — Open office
1
1500
7.2
20 A SP
4
28
Y
AC unit 14 — Open office
1
1500
7.2
20 A SP
4
29
B
AC unit 15 — Open office
1
1500
7.2
20 A SP
4
30
R
Equipment — Open office
1
1200
5.8
16 A SP
4
31
B
16 A sockets (2) — Server room
2
2000
9.7
20 A SP
4
32
R
AC unit 1 — Server room
1
1500
7.2
20 A SP
4
33
Y
AC unit 2 — Server room
1
1500
7.2
20 A SP
4
34
B
AC unit 3 — Server room
1
1500
7.2
20 A SP
4
35
R
AC unit 4 — Server room
1
1500
7.2
20 A SP
4
36
Y
AC unit 5 — Server room
1
1500
7.2
20 A SP
4
37
B
AC unit 6 — Server room
1
1500
7.2
20 A SP
4
38
RYB
Racks via UPS — Server room
1
10000
15.5
20 A TP
6
Phase loads R 19483 · Y 19633 · B 19425 W · demand by category: Lighting 2,542 → 90 % (4.2.2.2 Sl i) = 2,288, Small power (sockets) 13,300 → 50 % (cl. 5.9.2) = 6,650, Split AC 31,500 → 100 % up to 200 m², 85 % beyond: 260 m² → 96.5 % (4.2.2.2 Sl iii) = 30,410, Equipment 11,200 → 100 % largest + 75 % rest (4.2.2.2 Sl ii / xiv) = 10,900 · circuit wiring FRLS Cu, 1.5 mm² lighting / 4 mm² power / 4 mm² AC, earth per IS 3043 / IEC 60364-5-54
Connected watts per phase of every TPN board after the largest-first R-Y-B allocation; the figure above each group is the unbalance (max − min) / max, limit 15 %.
4. Panels — connected, diversity, demand
MAIN LT PANEL — Ib 177.1 A · incomer 250 A · DF 0.85
Feeds
Kind
Connected W
Demand rule
Demand W
Phase
Passenger lift
lift
15,000
100 % (4.2.2.2 Sl viii)
15,000
3
Fire pumps
pump
45,000
100 % largest + 80 % second + 60 % rest (4.2.2.2 Sl vii)
45,000
3
FP-GF
panel
39,734
panel demand
29,574
3
FP-FF
panel
58,542
panel demand
45,223
3
Total
158,276
134,797 × 0.85 = 114,577
FP-GF — Ib 45.7 A · incomer 63 A · DF 0.9
Feeds
Kind
Connected W
Demand rule
Demand W
Phase
LPDB-GF
db
39,734
board demand
32,860
3
Total
39,734
32,860 × 0.9 = 29,574
FP-FF — Ib 69.9 A · incomer 100 A · DF 0.9
Feeds
Kind
Connected W
Demand rule
Demand W
Phase
LPDB-FF
db
58,542
board demand
50,248
3
Total
58,542
50,248 × 0.9 = 45,223
Maximum demand 114.6 kW = 127.3 kVA at pf 0.9 → transformer 160 kVA (≈ 80 % loading), DG 160 kVA for full backup — refine with the essential / non-essential split.
5. Final-circuit checks
Check
Circuits
Result
Lighting circuits ≤ 800 W and ≤ 10 points (NBCS 5.4.4.3 mixed circuit of lights, fans and 6 A sockets; a dedicated lighting circuit may take 20 points — the 10-point packing is stricter)
20
PASS
16 A outlets ≤ 2 per circuit on 4 mm² Cu (NBCS 5.4.4.3)
13
PASS
General sub-circuits ≤ 3000 W (NBCS 5.4.4.7; design ≈ 2500 W for 20 % growth)
33
PASS
Final-circuit voltage drop ≤ 3 % from the DB to the last point (NBCS 2026 cl. 6.2; ≤ 6 % transformer → final DB) needs the circuit lengths: it is checked in Electrical layouts (circuits drawn on the plan).
Building planning densities — NBCS 2026 Part D Sec 2 cl. 5.9.2 — planning densities where nothing is specified (informational)
Item
Project
NBCS 5.9.2
Basis
Status
Lighting, built-up area
9.81
≤ 13 W/m²
5,236 W / 534.0 m²
meets
Power (sockets + AC + equipment), built-up area
174.2
≥ 55 W/m²
93,040 W / 534.0 m², excl. lifts, pumps, fire-fighting, ventilation
meets
Small-power diversity applied
50.0
≤ 50 %
12,350 / 24,700 W demand / connected
meets
Informational: NBCS 5.9.2 gives these values for planning where nothing else is specified; the room-by-room estimate above governs. Lighting above 13 W/m² or power below 55 W/m² is flagged for review only.
6. Feeder schedule for the power-distribution design
#
From
To
kW
Length m
Phase
Panel
1
MAIN LT PANEL
Passenger lift
15.0
30.0
3
2
MAIN LT PANEL
Fire pumps
45.0
30.0
3
3
MAIN LT PANEL
FP-GF
29.57
40.0
3
●
4
MAIN LT PANEL
FP-FF
45.22
40.0
3
●
5
FP-GF
LPDB-GF
32.86
30.0
3
●
6
FP-FF
LPDB-FF
50.25
30.0
3
●
Send to Power Distribution Design for cable sizing, fault levels and the SLD; lengths are project defaults until measured on the plan.
7. Worked examples — from this project
Worked from this project’s own inputs and results — each value can be traced to the schedules above.
Board LPDB-FF — FF (2 rooms, 38 circuits)
the board with the largest demand in this project
Given: System 415 V 3φ / 230 V 1φ, pf 0.9 · Board TPN 18-way, fed from FP-FF
1. Demand — Lighting: Pd per NBCS 4.2.2.2 = 2,542 W → 90 % (4.2.2.2 Sl i) = 2288 W(type of building: office)
2. Demand — Small power (sockets): Pd = Pconn × 50 % = 13,300 W → 50 % (cl. 5.9.2) = 6650 W
3. Demand — Split AC: Pd per NBCS 4.2.2.2 = 31,500 W → 100 % up to 200 m², 85 % beyond: 260 m² → 96.5 % (4.2.2.2 Sl iii) = 30 410 W
4. Demand — Equipment: Pd per NBCS 4.2.2.2 = 11,200 W → 100 % largest + 75 % rest (4.2.2.2 Sl ii / xiv) = 10 900 W
2. Diversity at the main panel: PMD = Σ × DFmain = 134,797 × 0.85 = 114,577 W
3. Maximum demand: S = PMD / cosφ = 114,577 / 0.9 / 1000 = 127.3 kVA
4. Main incomer current: Ib = PMD / (√3 · U · cosφ) = 114,577 / (1.732 · 415 · 0.9) = 177.1 A(incomer 250 A (≥ 1.25 · Ib, min 100 A))
5. Transformer: next size ≥ 1.25 · S = 1.25 × 127.3 = 159.1 kVA = 160 kVA (≈ 80 % loading; DG 160 kVA (next size ≥ S))
8. Standards applied
Standard
Used for
NBCS 2026 (SP 7:2026) Part D Sec 2
cl. 4.2.2.2 diversity by type of building (+ note: 50–90 % load factor), 5.4.4.3 / 5.4.4.7 sub-circuit limits, 5.9.2 planning densities, 6.2 voltage drop
IS 732:2019
Electrical wiring installations
CPWD General Specifications for Electrical Works Part I (Internal)
Sub-circuit limits, wiring sizes, DB construction
ECSBC 2024 cl. 7.3.3, Tables 7.4 / 7.5 / 7.6
Lighting power density per room type
IS 3043
Earthing
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.