SAMPLE LPS & earthing layout — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

Lightning protection & earthing layout

Sample project — Tower A · class III · Indian regime · NBCS 2026 (SP 7:2026) Part D Sec 2
Generated 28 Nov 2026 16:09
Footprint → air termination, down conductors, ring earth, equipment earthing
Project code SAMPLE
Class
III
Roof area
1425.0 m²
Rods
7
Down conductors
13
Earth pits
23
Conductor
503.0 m
Earth R
1.55 Ω

Code edition: NBCS 2026 (SP 7:2026) Part D Sec 2 — lightning protection to IEC 62305 (all parts) : 2024 (NBCS 11.1 Note); class from the risk and frequency-of-damage assessment (11.2 b, 11.4).

1. Design basis

ItemValueReference
Class of LPSIII — rolling sphere 45 m, mesh 15 × 15 m, down conductors every 15 m, ki = 0.04NBCS 2026 cl. 11.3, Table 3, Table 4; IEC 62305-3:2024
Footprint1425.0 m², perimeter 180.0 m, height 24 mdrawing
Air terminationmesh + perimeter conductor, rods at corners and protrusions, rods 1 mNBCS 11.6.1, 11.6.1.1
Down conductorsRCC column rebars used as natural down conductors (IEC 62305-3 §5.3.5, continuity to be documented); the external conductors shown are the test-joint / bonding positions; corners first, then each facade split so no gap exceeds 15 mNBCS 11.6.2, 11.6.2.1 Table 4, 11.6.2.4
Earth terminationType B ring 1.0 m outside the footprint at 0.5 m depth, 3.0 m rod at every down conductor; NBCS 2026 Table 5: class III, ρ 120 Ω·m → vertical electrode ≥ 2.5 m; Type B ring mean radius 22.6 m ≥ 2.5 m; resistance target 1.0 Ω (NBCS 11.6.3: < 10 Ω recommended; CPWD / IS 3043 practice ≤ 1 Ω where the power earth is bonded)NBCS 11.6.3, Table 5, 11.6.3.2
Soilρ = 120 Ω·m, 3 m × 40 mm rods, Hot-dip GI 25 × 3 mm / 75 mm² (IEC 62305-3 Table 6: steel 50 mm²; CPWD 25 × 3)measured / IS 3043 Table 1
Equipment earthingfault 25 kA for 1 s, GI / steel k = 80, corrosion allowance 30 %; all earths interconnectedIS 3043 Table 6 / CPWD; NBCS 8.2.9, 8.2.20, 8.2.24
Surge protectionType 1 SPD at the main panel, Iimp 12.5 kA (10/350) per pole (≥ 12.5 kA L–N; N–PE ≥ 50 kA 3-phase / 25 kA 1-phase); Type 2 In ≥ 5 kA L–N, 20 kA N–PE; Up ≤ 1.5 kV; Uc ≥ 253 VIEC 62305-4 / IEC 61643-11; NBCS 11.7.4.5.1, 11.7.4.5.3, 11.7.4.5.5, 11.7.4.14

2. Air termination

Class III LPS — mesh 15 m · 13 down conductors · ring earth · 10 equipment pitsLift MR +3.5 mDC-1DC-2DC-3DC-4DC-5DC-6DC-7DC-8DC-9DC-10DC-11DC-12DC-13EP-1EP-2EP-3EP-4EP-5EP-6EP-7EP-8EP-9EP-10EP-11EP-12EP-13E1E2E3E4E5E6E7E8E9E10Main LT panelTransformerDG-1orange: roof conductor / mesh · red: air-termination rods · blue: down conductors · green dashed: ring earth with pits · cyan / violet: body / neutral earth strips
Rolling-sphere section — class III, r = 45 m, mesh 15 m; building 30 m wide × 24 m highdip 629 mm between conductors 15 m apartrod on Lift MR, top +4.5 mblue: sphere on two mesh conductors · grey: sphere off the roof edge to the ground · side flash negligible up to 60 m (NBCS 11.6.1.4)
ElementQuantity
Roof mesh conductor135.0 m (5 runs)
Perimeter conductor180.0 m
Air-termination rods7 nos (corner, protrusion)
Protrusion: Lift MRrod 4.5 m total on the protrusion (rod on the protrusion top, 1.0 m above it; rolling sphere r = 45 m)

3. Down conductors

TagxyGap to next m
DC-10.00.015.0
DC-215.00.015.0
DC-330.00.015.0
DC-445.00.015.0
DC-560.00.015.0
DC-660.015.012.5
DC-747.515.012.5
DC-835.015.015.0
DC-935.030.011.67
DC-1023.33330.011.67
DC-1111.66730.011.67
DC-120.030.015.0
DC-130.015.015.0

13 down conductors, largest gap 15.0 m (average 13.8 m) against 15 m PASS. RCC column rebars used as natural down conductors (IEC 62305-3 §5.3.5, continuity to be documented); the external conductors shown are the test-joint / bonding positions.

4. Earth termination

ItemValue
Ring electrode188.0 m, 1.0 m outside the footprint, 0.5 m deep
Ring resistance (Dwight)1.77 Ω
Rods 3 m at every DC13 × 36.31 Ω → 12.15 Ω in parallel (IS 3043 Table 12 factor)
Combined1.55 Ω vs target 1.0 Ω CHECK
Minimum electrode length (NBCS Table 5)vertical electrode ≥ 2.5 m for class III, ρ 120 Ω·m; Type B: ring mean radius re = 22.63 m ≥ 2.5 m PASS
Earth resistance vs number of rods (ring 1.77 Ω ∥ rods 3 m, ρ 120 Ω·m)0.000.390.781.171.561.95R (Ω)target 1.0 Ω12468101214161820222426design: 13 rods → 1.54 Ωnumber of rods n (one per down conductor in the design) · green: ring ∥ rods · cyan dashed: rods alone (Rrod·λ/n)

5. Separation distance

s = ki·kc·l / km = 0.04 × 0.138 × 24 / 1.0 = 0.13 m. s = ki·kc·l/km (IEC 62305-3 §6.3) with l = height from the roof to the nearest equipotential bonding; metal within s must be bonded.

6. Equipment earthing

EquipmentKindBody pitsNeutral pitsPit tagsBody stripNeutral stripR (pits alone)Note
Main LT panelMain LT panel / PCC20E1, E265 × 8 mm GI / steel—30.14 ΩIS 3043 cl. 19 / NBCS 8.2.9: two distinct earths for three-phase equipment
TransformerTransformer22E3, E4, E5, E665 × 8 mm GI / steel65 × 8 mm GI / steel30.14 ΩCEA reg. 41 / NBCS 8.2.9.1: body 2 pits, neutral 2 pits, separate
DG-1DG set22E7, E8, E9, E1065 × 8 mm GI / steel65 × 8 mm GI / steel30.14 Ωbody 2, neutral 2 (separate), interconnected with the main earth below ground

Strip area = I·√t / k × (1 + corrosion) = 25 kA × √1 / 80 × 1.3 = 406.2 mm² → 65 × 8 mm GI / steel. All pits bonded to the ring / main earth bus; equipment earth ≤ 1 Ω where the LPS earth is bonded to the power earth. No isolated earth: every earthing system of the building is interconnected below ground (NBCS 8.2.20); where a separate earth is unavoidable, an earth coupler / isolating spark gap is fitted (8.2.24). Three-phase equipment has two separate and distinct earth connections (8.2.9); no common salt in the pits (8.4.4).

7. Bill of quantities

ItemQtyUnit
Air-termination / roof conductor — Hot-dip GI 25 × 3 mm / 75 mm² (IEC 62305-3 Table 6: steel 50 mm²; CPWD 25 × 3)315.0m
Air-termination rods 1 m (Cu / SS, 16 mm) with base7nos
Down conductor — rebar continuity / bonding to the roof conductor, test joint per DC26.0m
Test joints (0.5 m above ground)13nos
Ring earth electrode Hot-dip GI 25 × 3 mm / 75 mm² (IEC 62305-3 Table 6: steel 50 mm²; CPWD 25 × 3), 0.5 m deep188.0m
Earth electrodes 3 m × 40 mm with pit, chamber and cover (LPS)13nos
Earth electrodes 3 m × 40 mm with pit (equipment)10nos
Earth strip 65 × 8 mm GI / steel (equipment body)51.0m
Earth strip 65 × 8 mm GI / steel (neutral)33.6m
Type 1 SPD at the main panel, Iimp 12.5 kA (10/350) per pole L–N (≥ 12.5 kA), N–PE ≥ 50 kA for 3-phase (NBCS 11.7.4.5.1)4nos
Equipotential bonding bar / main earth bus1nos
Saddles / clamps / exothermic joints (allow 1 per m of roof conductor)315nos

8. Checks

CheckResult
Down conductors 13: largest gap 15.0 m ≤ 15 m (class III, NBCS Table 4)PASS
Earth resistance 1.55 Ω ≤ 1.0 ΩCHECK
Earth electrode length (NBCS Table 5, class III, ρ = 120 Ω·m): ring mean radius 22.6 m / rod 3 m vs 2.5 mPASS
Mesh 15 × 15 m and rolling sphere 45 m per class IIIPASS
Separation distance s = 0.13 m — bond metal within itPASS
Ring conductors at ground level and every 10–20 m of height (NBCS 11.6.2.4): H 24 m — fulfilled by the electrically continuous RCC reinforcement (bond the rebar at each floor)PASS

9. Worked examples — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Class III — air termination and down conductors for this roof
the class is a project setting; its parameters come from the class table
Given: Footprint 1425.0 m², perimeter 180.0 m, bounding box 60 × 30 m, height 24 m · Method mesh · Class III (IEC 62305-3 Tables 2, 4, Annex C; NBCS Tables 3, 4) rolling sphere r = 45 m · mesh 15 × 15 m · DC spacing 15 m · ki 0.04
1. Mesh divisions: nx = ⌈Bx / m⌉, ny = ⌈By / m⌉ = ⌈60 / 15⌉, ⌈30 / 15⌉ = 4 × 2 (actual mesh 15.00 × 15.00 m ≤ 15 m)
2. Roof conductor: (nx − 1) + (ny − 1) lines clipped to the roof + perimeter = 135.0 + 180.0 = 315 m (5 mesh runs)
Protrusions: 1 rod(s) on top, e.g. Lift MR → rod top 4.5 m above the roof (1 m above the protrusion), rolling sphere r = 45 m.
3. Down conductors: n = Σ ⌈facade length / sDC⌉ (a DC at every corner) = ⌈60 / 15⌉ + ⌈15 / 15⌉ + ⌈25 / 15⌉ + ⌈15 / 15⌉ + ⌈35 / 15⌉ + ⌈30 / 15⌉ = 13 nos (same rule as the CAD drive tool)
4. Down-conductor spacing: largest gap ≤ 15 m → 15.0 m (average 180.0 / 13 = 13.8 m) PASS
5. Separation distance: s = ki · kc · l / km = 0.04 · 0.138 · 24 / 1 = 0.13 m (kc = 1/(2n) + 0.1 (Annex C simplified))
Earth termination — ring + 13 rods, ρ = 120 Ω·m
the LPS earth of this building
Given: Ring 1.0 m outside the footprint, 0.5 m deep, 188.0 m long, strip ≈ 30 mm equivalent · Rods 13 × 3 m × 40 mm
1. Ring equivalent diameter: D = 2 · √(Aring / π) = 2 · √(1609.0 / π) = 45.26 m
2. Ring resistance (Dwight): Rring = ρ / (2π² D) · [ln(8D/d) + ln(D / 2t)] = 120 / (2π² · 45.26) · [ln(8 · 45.26 / 0.03) + ln(45.26 / 1)] = 1.77 Ω (engine 1.77 Ω)
3. One rod: Rrod = ρ / (2π l) · ln(4l / d) = 120 / (2π · 3) · ln(4 · 3 / 0.04) = 36.31 Ω (engine 36.31 Ω)
4. Rods in parallel: Rrods = Rrod · λ / n = 36.31 · 4.35 / 13 = 12.15 Ω (IS 3043 Table 12 → λ = 4.35 for n = 13)
5. Combined: R = 1 / (1/Rring + 1/Rrods) = 1 / (1/1.77 + 1/12.15) = 1.55 Ω
6. Earth resistance: R ≤ 1.0 Ω → 1.55 Ω CHECK
7. Ring mean radius: re = √(Aring / π) = √(1609.0 / π) = 22.63 m
8. Type B ring (NBCS 11.6.3.2): re ≥ Table 5 length 2.5 m (class III, ρ 120 Ω·m) → 22.63 m PASS
Equipment earthing strip
3 equipment item(s) — Main LT panel, Transformer, DG-1
Given: Fault Ik 25 kA for 1 s · Material GI / steel, k = 80 · Corrosion allowance 30 %
1. Required area: A = Ik · √t / k × (1 + c) = 25,000 · √1 / 80 × 1.3 = 406.2 mm²
2. Strip chosen: next standard strip ≥ A → 65 × 8 mm GI / steel = 520 mm² PASS

10. Standards applied

StandardUsed for
NBCS 2026 (SP 7:2026) Part D Sec 2cl. 8 earthing (8.2.9, 8.2.20, 8.2.24, Table 2, 8.4.4); cl. 11 lightning protection (Tables 3, 4, 5; 11.6.2.4; 11.6.1.4; 11.7.4.5)
IEC 62305 (all parts) : 2024Protection against lightning — referred by NBCS 11.1 Note (IS/IEC 62305:2010 under revision)
IS 3043:2018Code of practice for earthing
CEA Regulations 2023 (reg. 41)Earthing of installations
CPWD General Specifications (Electrical) Part I / IVEarthing pits, strips, LPS practice
Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.