Lightning protection & earthing layout
Sample project — Tower A · class III · Indian regime · NBCS 2026 (SP 7:2026) Part D Sec 2
Generated 28 Nov 2026 16:09 Footprint → air termination, down conductors, ring earth, equipment earthing Project code SAMPLE
Class
III
Roof area
1425.0 m²
Rods
7
Down conductors
13
Earth pits
23
Conductor
503.0 m
Earth R
1.55 Ω
Code edition: NBCS 2026 (SP 7:2026) Part D Sec 2 — lightning protection to IEC 62305 (all parts) : 2024 (NBCS 11.1 Note); class from the risk and frequency-of-damage assessment (11.2 b, 11.4).
1. Design basis
Item
Value
Reference
Class of LPS
III — rolling sphere 45 m, mesh 15 × 15 m, down conductors every 15 m, ki = 0.04
mesh + perimeter conductor, rods at corners and protrusions, rods 1 m
NBCS 11.6.1, 11.6.1.1
Down conductors
RCC column rebars used as natural down conductors (IEC 62305-3 §5.3.5, continuity to be documented); the external conductors shown are the test-joint / bonding positions; corners first, then each facade split so no gap exceeds 15 m
NBCS 11.6.2, 11.6.2.1 Table 4, 11.6.2.4
Earth termination
Type B ring 1.0 m outside the footprint at 0.5 m depth, 3.0 m rod at every down conductor; NBCS 2026 Table 5: class III, ρ 120 Ω·m → vertical electrode ≥ 2.5 m; Type B ring mean radius 22.6 m ≥ 2.5 m; resistance target 1.0 Ω (NBCS 11.6.3: < 10 Ω recommended; CPWD / IS 3043 practice ≤ 1 Ω where the power earth is bonded)
NBCS 11.6.3, Table 5, 11.6.3.2
Soil
ρ = 120 Ω·m, 3 m × 40 mm rods, Hot-dip GI 25 × 3 mm / 75 mm² (IEC 62305-3 Table 6: steel 50 mm²; CPWD 25 × 3)
measured / IS 3043 Table 1
Equipment earthing
fault 25 kA for 1 s, GI / steel k = 80, corrosion allowance 30 %; all earths interconnected
IS 3043 Table 6 / CPWD; NBCS 8.2.9, 8.2.20, 8.2.24
Surge protection
Type 1 SPD at the main panel, Iimp 12.5 kA (10/350) per pole (≥ 12.5 kA L–N; N–PE ≥ 50 kA 3-phase / 25 kA 1-phase); Type 2 In ≥ 5 kA L–N, 20 kA N–PE; Up ≤ 1.5 kV; Uc ≥ 253 V
rod 4.5 m total on the protrusion (rod on the protrusion top, 1.0 m above it; rolling sphere r = 45 m)
3. Down conductors
Tag
x
y
Gap to next m
DC-1
0.0
0.0
15.0
DC-2
15.0
0.0
15.0
DC-3
30.0
0.0
15.0
DC-4
45.0
0.0
15.0
DC-5
60.0
0.0
15.0
DC-6
60.0
15.0
12.5
DC-7
47.5
15.0
12.5
DC-8
35.0
15.0
15.0
DC-9
35.0
30.0
11.67
DC-10
23.333
30.0
11.67
DC-11
11.667
30.0
11.67
DC-12
0.0
30.0
15.0
DC-13
0.0
15.0
15.0
13 down conductors, largest gap 15.0 m (average 13.8 m) against 15 m PASS. RCC column rebars used as natural down conductors (IEC 62305-3 §5.3.5, continuity to be documented); the external conductors shown are the test-joint / bonding positions.
vertical electrode ≥ 2.5 m for class III, ρ 120 Ω·m; Type B: ring mean radius re = 22.63 m ≥ 2.5 m PASS
5. Separation distance
s = ki·kc·l / km = 0.04 × 0.138 × 24 / 1.0 = 0.13 m. s = ki·kc·l/km (IEC 62305-3 §6.3) with l = height from the roof to the nearest equipotential bonding; metal within s must be bonded.
6. Equipment earthing
Equipment
Kind
Body pits
Neutral pits
Pit tags
Body strip
Neutral strip
R (pits alone)
Note
Main LT panel
Main LT panel / PCC
2
0
E1, E2
65 × 8 mm GI / steel
—
30.14 Ω
IS 3043 cl. 19 / NBCS 8.2.9: two distinct earths for three-phase equipment
Transformer
Transformer
2
2
E3, E4, E5, E6
65 × 8 mm GI / steel
65 × 8 mm GI / steel
30.14 Ω
CEA reg. 41 / NBCS 8.2.9.1: body 2 pits, neutral 2 pits, separate
DG-1
DG set
2
2
E7, E8, E9, E10
65 × 8 mm GI / steel
65 × 8 mm GI / steel
30.14 Ω
body 2, neutral 2 (separate), interconnected with the main earth below ground
Strip area = I·√t / k × (1 + corrosion) = 25 kA × √1 / 80 × 1.3 = 406.2 mm² → 65 × 8 mm GI / steel. All pits bonded to the ring / main earth bus; equipment earth ≤ 1 Ω where the LPS earth is bonded to the power earth. No isolated earth: every earthing system of the building is interconnected below ground (NBCS 8.2.20); where a separate earth is unavoidable, an earth coupler / isolating spark gap is fitted (8.2.24). Three-phase equipment has two separate and distinct earth connections (8.2.9); no common salt in the pits (8.4.4).
Air-termination rods 1 m (Cu / SS, 16 mm) with base
7
nos
Down conductor — rebar continuity / bonding to the roof conductor, test joint per DC
26.0
m
Test joints (0.5 m above ground)
13
nos
Ring earth electrode Hot-dip GI 25 × 3 mm / 75 mm² (IEC 62305-3 Table 6: steel 50 mm²; CPWD 25 × 3), 0.5 m deep
188.0
m
Earth electrodes 3 m × 40 mm with pit, chamber and cover (LPS)
13
nos
Earth electrodes 3 m × 40 mm with pit (equipment)
10
nos
Earth strip 65 × 8 mm GI / steel (equipment body)
51.0
m
Earth strip 65 × 8 mm GI / steel (neutral)
33.6
m
Type 1 SPD at the main panel, Iimp 12.5 kA (10/350) per pole L–N (≥ 12.5 kA), N–PE ≥ 50 kA for 3-phase (NBCS 11.7.4.5.1)
4
nos
Equipotential bonding bar / main earth bus
1
nos
Saddles / clamps / exothermic joints (allow 1 per m of roof conductor)
315
nos
8. Checks
Check
Result
Down conductors 13: largest gap 15.0 m ≤ 15 m (class III, NBCS Table 4)
PASS
Earth resistance 1.55 Ω ≤ 1.0 Ω
CHECK
Earth electrode length (NBCS Table 5, class III, ρ = 120 Ω·m): ring mean radius 22.6 m / rod 3 m vs 2.5 m
PASS
Mesh 15 × 15 m and rolling sphere 45 m per class III
PASS
Separation distance s = 0.13 m — bond metal within it
PASS
Ring conductors at ground level and every 10–20 m of height (NBCS 11.6.2.4): H 24 m — fulfilled by the electrically continuous RCC reinforcement (bond the rebar at each floor)
PASS
9. Worked examples — from this project
Worked from this project’s own inputs and results — each value can be traced to the schedules above.
Class III — air termination and down conductors for this roof
the class is a project setting; its parameters come from the class table
Given: Footprint 1425.0 m², perimeter 180.0 m, bounding box 60 × 30 m, height 24 m · Method mesh · Class III (IEC 62305-3 Tables 2, 4, Annex C; NBCS Tables 3, 4) rolling sphere r = 45 m · mesh 15 × 15 m · DC spacing 15 m · ki 0.04
Protection against lightning — referred by NBCS 11.1 Note (IS/IEC 62305:2010 under revision)
IS 3043:2018
Code of practice for earthing
CEA Regulations 2023 (reg. 41)
Earthing of installations
CPWD General Specifications (Electrical) Part I / IV
Earthing pits, strips, LPS practice
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.