SAMPLE Design & tender package — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Design & tender package: worked example & sample report | Design Link calc
Package ready — use Print → Save as PDF (A4), or download the PDF / ZIP from the package page.
Design Linkcalc.designlink.in
Design & tender package

Sample project — Tower A

Gurugram · Sample client
DocumentDL-SAMPLE-MEP-TPRevisionR1Date2026-09-30
StatusIssued for tender
Code basisNBCS 2026 (SP 7:2026) — Parts A, D, E, F
PreparedPKCheckedRSApprovedAM

Assembled by designlink calc on 28 Nov 2026 from the project hub SAMPLE. Every section is the live output of the tool it came from; the standards each section applies are listed inside it and in the specification's standards schedule.

Revision history

RevDateDescriptionBy
R02026-09-01Issued for reviewPK
R12026-09-30Issued for tenderPK

Contents

  1. Design basis summary
  2. Drawing register
  3. Bill of quantities (roll-up)
  4. Appendices — design calculations and reports

    1. Design basis summary

    Key results and the automatic code checks of every linked tool at the time of issue. Detailed calculations follow in the appendices.

    Code basis

    NBCS 2026 (SP 7:2026) — National Building Construction Standards

    DisciplinePart / section applied
    ElectricalPart D Sec 2 (electrical & allied installations); Part D Sec 1 (lighting); Part F cl. 3.5.5.2 / 3.5.6 (emergency power, escape lighting)
    FirePart F (fire & life safety): Tables 7A–7J by occupancy, Tables 7K / 7M fire water, Table 8 mains, cl. 5.1.1–5.1.3; egress cl. 4.4

    Electrical

    Lighting design Sample project — Tower A · S1

    Rooms24
    Luminaires312
    LPD W/m²6.8
    • ✔ Illuminance and uniformity met in every room (24 of 24)
    • ✔ Emergency lighting meets the escape-route level

    Fire

    Sprinkler placement & piping Sample project — Tower A · S2

    Heads186
    Zones2
    Governing demand1,420 L/min @ 5.2 bar
    • ✔ Coverage per head within the hazard limit
    • ✔ Zone area within the code limit

    2. Drawing register

    Drawing no.TitleSourceRevFormat
    E-01Lighting layoutLighting designR1DXF
    F-01Sprinkler layout & pipingSprinkler placement & pipingR1DXF

    Drawings are issued as DXF files in the package ZIP under the numbers above.

    3. Technical specification

    No specification is linked to this hub yet — open the Specification maker from the hub, save it, and re-issue the package.

    4. Bill of quantities — roll-up

    Quantities collected from every tool; rates and the DSR item mapping are added in the BOQ workbook.

    Discipline / toolItemQtyUnit
    Lighting designLED panel 36 W312no
    Sprinkler placement & pipingMS class C pipe 50 mm640m
    Sample project — Tower A · DL-SAMPLE-MEP-TP · R1 · designlink calc