calc.designlink.inPole transverse load & foundation
Sample project — Tower A · Electrical
Generated 28 Nov 2026 17:16
Wind on the conductors, the pole and the luminaire / bracket plus the pull at a line devia…
Project code SAMPLE
Moment at ground
6.662 kN·m
1. Inputs
| Group | Input | Value | Unit |
|---|
| Pole | Height above ground | 9 | m |
| Pole | Top diameter | 90 | mm |
| Pole | Bottom diameter | 160 | mm |
| Pole | Force coefficient of the pole | 0.8 | |
| Pole | Pole working load (applied 0.6 m below top) | 2.0 | kN |
| Pole | Luminaire + bracket projected area | 0.25 | m² |
| Conductors / cables | Number of overhead conductors (0 = underground feed) | 0 | |
| Conductors / cables | Conductor diameter | 9.0 | mm |
| Conductors / cables | Wind span | 35 | m |
| Conductors / cables | Conductor height above ground | 7.5 | m |
| Conductors / cables | Conductor tension (each) | 2.0 | kN |
| Conductors / cables | Line deviation angle | 0 | ° |
| Wind and soil | Basic wind speed | 44 m/s | |
| Wind and soil | Terrain / height factor k2 | 1.0 | |
| Wind and soil | Kd · Ka · Kc | 0.9 | |
| Wind and soil | Soil friction angle | 30 | ° |
| Wind and soil | Soil unit weight | 18 | kN/m³ |
| Wind and soil | Foundation (concrete) width / diameter | 0.6 | m |
| Wind and soil | Factor of safety on the soil | 2.0 | |
2. Results
Forces
| Item | Value | Unit | Note / basis |
|---|
| Design wind speed Vz | 44.0 | m/s | |
| Design pressure pd = 0.6·Vz² × K | 1045.44 | N/m² | |
| On the pole | 0.9409 | kN | at 4.08 m |
| On the luminaire / bracket | 0.3136 | kN | at 9 m |
| On the conductors | 0.0 | kN | 0 × wind span |
| Deviation pull 2T·sin(θ/2) | 0.0 | kN | |
| Moment at ground | 6.66 | kN·m | |
| Pole capacity WL × (h − 0.6) | 16.8 | kN·m | |
Foundation
| Item | Value | Unit | Note / basis |
|---|
| Kp = (1 + sinφ)/(1 − sinφ) | 3.0 | | |
| Load height e = M/H | 5.31 | m | |
| Depth for FoS | 1.0 | m | Hu = 0.5·γ·b·D³·Kp/(e + D) ≥ 2 × H |
| Rule of thumb (1/6 of total length, typical) | 1.67 | m | |
| Adopt | 1.67 | m | |
3. Checks
| Check | Result | Note |
|---|
| Moment 6.66 ≤ pole capacity 16.80 kN·m | PASS | |
| Soil capacity at 1 m ≥ 2 × H | PASS | |
4. Worked example
pd = 0.6 × 44.0² × 0.9 = 1045 N/m²; pole: 1045 × 0.8 × 1.125 m² = 941 N
M = 0.941 × 4.08 + 0.314 × 9 + 0.000 × 7.5 = 6.66 kN·m
5. Notes
- Wind per IS 875 Part 3 (pz = 0.6·Vz²); conductor drag coefficient 1.0 (IS 802 practice). Short-pile soil capacity after Broms for cohesionless soil — use a geotechnical check for soft clay or fill.
- Street-light poles: planting depth also per the maker's base-plate / anchor-bolt design where a foundation bolt cage is used.
6. Standards and references
- IS 2713 (parts 1–3):1980 — Tubular steel poles for overhead power lines: Lighting poles
- IS 875 (part 3):2015 — Design loads for buildings and structures — wind loads: Pole and bracket wind design
- IS 802 (Part 1/Sec 1) — Use of structural steel in overhead transmission line towers — materials, loads and permissible stresses: Wind on conductors and supports
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.