Generated 28 Nov 2026 16:09 Pool volume and bather load, turnover → circulation flow, sand filters and backwash, pump … Project code SAMPLE
Volume
500.0 m³
Circulation
83.3 m³/h
Filters
2 × Ø1600 mm
Pumps
3 × 5.5 kW
Heater
268.5 kW
Bathers (peak)
92
Plant room
13.5 × 6.5 m
1. Inputs
Group
Input
Value
Unit
Pool
Design basis
NBCS 2026 Part E Sec 1 cl. 4.19 — turnover table, user load by depth, displacement 60 / 45 L
Turnover, user load by depth and displacement per NBCS 2026 (SP 7:2026) Part E Sec 1 cl. 4.19.1.2–4.19.1.4; filtration rate and balance-tank method per PWTAG / IS 3328 practice; local health regulations may impose stricter limits.
Evaporation by the Carrier / Smith et al. (1993) correlation used in ASHRAE Applications (Natatoriums); activity factors 0.5 residential, 0.65 hotel, 0.8 competition, 1.0 kids / spa.
Pump head is an estimate — confirm with the filter's dirty-bed pressure drop, heat exchanger and UV data; use the water-network tool for long pipe runs.
Indoor pools: hall air 1 °C above water, 50–60 % RH, dehumidification 0.75 × evaporation — size the pool-hall AHU separately (heat-load tool).
6. Standards and references
CPHEEO Manual on Water Supply & Treatment (1999 / 2024) — Manual on Water Supply and Treatment: Per-capita demand, peak factors, distribution velocity and residual pressure
ASHRAE Handbook — HVAC Applications ch. 51 — Service water heating: Hot-water demand, storage and recovery
IS 1172:1993 — Basic requirements for water supply, drainage and sanitation: Per-capita water requirement for storage sizing
PWTAG Code of Practice (2020) / Swimming Pool Water (2017) — Pool Water Treatment Advisory Group — design and operation of swimming pool water treatment: Turnover periods, filtration rates, bather load, balance tank, disinfection residuals, secondary UV / ozone
IS 3328:1993 — Quality tolerances for water for swimming pools: Water quality limits, chlorine residual, pH, turnover and circulation guidance
NBCS 2026 (SP 7:2026) Part E Sec 1 — National Building Construction Standards — Water supply: Per-capita demand, storage, fixture units and probable flow, pressures and zoning