Lobby pressurisation (lift / stair)
Sample project — Tower A · Fire
Generated 15 Oct 2026 18:24 Pressurised lift / stair / fire-fighting lobbies: leakage to the floor, the stair and the … Project code SAMPLE
Fan duty
46665 m³/h
Fan pressure
244 Pa
Motor
7.5 kW
Design ΔP
30 Pa
Governing case
doors open
Relief damper
0.2 m²
1. Inputs
Group
Input
Value
Unit
Code & criteria
Code basis
India — NBC 2016 Part 4 targets + BS EN 12101-6 method
Code & criteria
Purpose (sets the open-door air speed)
Means of escape — 0.75 m/s
Code & criteria
Lobby pressure difference, doors closed (0 = code: NBC 30 Pa · EN class · NFPA min)
0
Pa
Code & criteria
Air speed through the open door (0 = by purpose / class)
0
m/s
Code & criteria
Maximum door-opening force (0 = code: India 110 N · EN 100 N · NFPA 133 N)
0
N
Code & criteria
Door-closer force at the handle
40
N
Building
Floors with a pressurised lobby
15
Building
Floor-to-floor height
3.3
m
Lobby
Lobby
Lift + stair (fire-fighting) lobby
Lobby
Doors lobby → floor (accommodation)
1
Lobby
Lobby → floor door
Single leaf — opens into the pressurised space (0.01 m²)
Lobby
Lobby → floor door width
1.0
m
Lobby
Lobby → floor door height
2.1
m
Lobby
Door leakage from
BS EN 12101-6 Table A.2 values
Lobby
Lobby → stair door
Single leaf — opens out of it (0.02 m²)
Lobby
Lobby → stair door width
1.0
m
Lobby
Stair pressurised too
True
Lobby
Stair ΔP (to the floor)
50
Pa
Lobby
Lift landing doors into the lobby
2
Lobby
Lift well pressurised too
False
Lobby
Include lobby wall leakage (ASHRAE ratios — BS practice leaves it to the unidentified allowance)
False
Fire-floor door open
Lobby → floor doors open at the fire floor
1
Fire-floor door open
ΔP across the lobby's other doors, door open
10
Pa
Fan, ducts & air distribution
Allowance for unidentified leakage
25
%
Fan, ducts & air distribution
Duct leakage allowance on the fan
15
%
Fan, ducts & air distribution
Over-pressure control
Barometric pressure-relief damper(s)
Fan, ducts & air distribution
Standby fan (duty + standby)
True
Fan, ducts & air distribution
Duct run fan → farthest outlet (0 = shaft height + 10 m)
0
m
Fan, ducts & air distribution
Duct friction
1.0
Pa/m
Fan, ducts & air distribution
Fittings allowance on duct friction
50
%
Fan, ducts & air distribution
Intake louvre + dampers + grille losses
125
Pa
Fan, ducts & air distribution
Fan total efficiency
60
%
Fan, ducts & air distribution
Supply grille face velocity
3.0
m/s
Fan, ducts & air distribution
Riser duct velocity
8.0
m/s
2. Results
Criteria
Item
Value
Unit
Note / basis
Basis
NBC 2016 Part 4 — 25–30 Pa in lobbies / lift wells; open-door air speed by BS EN 12101-6
Design pressure difference, doors closed
30.0
Pa
Air speed through the open door
0.75
m/s
Maximum door-opening force
110.0
N
Pressure across the other closed doors with the door open
10.0
Pa
BS EN 12101-6
Lobbies
15
nos
one per floor, 3.3 m floor to floor
Air per lobby, doors closed
2392.21
m³/h
net of inflow from a pressurised stair / shaft
Air to the fire-floor lobby, door open
7087.33
m³/h
Inflow from the stair / lift shaft per lobby
267.25
m³/h
Air quantities
Item
Value
Unit
Note / basis
Doors closed (with unidentified leakage)
9.97
m³/s
35,883 m³/h
Doors open — 1 lobby door(s) 1 × 2.1 m at the fire floor
1.58
m³/s
0.75 m/s × 2.10 m²
Doors open — total
11.27
m³/s
40,578 m³/h
Design (larger)
11.27
m³/s
doors open
Fan duty (with duct leakage)
12.96
m³/s
46,665 m³/h · 27,466 cfm
Fan, relief & distribution
Item
Value
Unit
Note / basis
Duct run
59.5
m
Duct friction incl. fittings
89.25
Pa
Fan total pressure
244.25
Pa
Shaft power
5.28
kW
Motor
7.5
kW
Fresh-air intake louvre (free area at 2.5 m/s)
5.19
m²
Pressure-relief damper free area
0.1962
m²
Air release from the fire floor (vent / shaft / façade)
Fresh-air intake louvre with bird screen, ≥ 5.19 m² free area (2.5 m/s), away from smoke outlets
1
set
Riser duct 1550 × 1050 mm, GI sheet, 60 m (fire-rated where outside the protected shaft)
309.4
m²
Lobby supply grilles 1250 × 700 mm with motorised damper (fire floor fully open)
15
nos
Interface with the fire-alarm panel (start on alarm, status / fault to FACP), fire-survival cable to the fans
1
set
Barometric pressure-relief damper per lobby, 0.20 m² free area, set to 35 Pa (relieves to the floor / a relief shaft)
15
nos
3. Checks
Check
Result
Note
Pressure hierarchy: stair 50 Pa > lobby 30 Pa > floor 0 Pa
PASS
the stair must stay above the lobby so smoke cannot pass into the stair
Lobby → stair door force at 20 Pa: 63 N ≤ 110 N
PASS
Design ΔP 30 Pa ≤ door-opening force ≤ 110 N (62 Pa)
PASS
door force at the design ΔP 74 N
4. Worked example
Per lobby, doors closed: 0.83 × 0.0100 × 30^0.5 = 0.045 m³/s to the floor + 0.546 m³/s to the stair / lift shaft, × 1.25 unidentified − inflow 0.074 m³/s = 0.665 m³/s; × 15 lobbies = 9.968 m³/s
Fire floor, door open: v × A = 0.75 × 2.10 = 1.575 m³/s + the lobby's other doors at 10 Pa 0.394 m³/s = 1.969 m³/s; + 14 other lobbies × 0.665 = 11.272 m³/s
Fan pressure = 60 m × duct friction × (1 + fittings) = 89 + fixed losses + 30 Pa = 244 Pa; shaft power = Q·p/η = 12.963 × 244 / η = 5.28 kW → motor 7.5 kW
Door force: F = Fdc + W·A·ΔP / (2(W − d)) = 74 N at 30 Pa; limit 110 N → ΔP max = 2(W − d)(F − Fdc)/(W·A) = 62 Pa
Relief: leakage at 62 Pa = 0.985 m³/s; excess = 12.963 − 0.985 = 1.279 m³/s → A = Q / (0.83 √ΔP) = 0.196 m²
5. Notes
Each lobby is supplied from the riser; on alarm the fire-floor lobby gets the open-door air (motorised damper fully open) and the others their doors-closed air — the fan is sized for that case or for all lobbies doors-closed, whichever is larger.
Leakage areas: BS EN 12101-6 Table A.2 (doors), A.3 (windows); wall leakage ratios from the ASHRAE Handbook of Smoke Control Engineering (NFPA 92 Annex). Verify the door schedule and construction with the architect.
Open-door condition: the required air speed through the open door(s), the other doors closed at the reduced pressure — BS EN 12101-6 Annex A method; the fire floor needs an air-release path (vent, shaft or façade opening) sized above.
The fan starts on fire alarm; the intake is taken from a smoke-free location at least 5 m from any smoke outlet; fans, controls and cables are on the fire-protected supply (NBC 2016 Part 4 / BS EN 12101-6).
Commissioning: measure the pressure difference with all doors closed and the air speed with the design doors open (BS EN 12101-13 acceptance test).
6. Standards and references
NBC 2016 Part 4 — National Building Code — Fire and life safety: Occupant load (Table 5), exit width (Table 22), travel distance (Table 21), stair widths
NFPA 101:2021 — Life Safety Code: Means of egress (international option)
NFPA 92 (2021) — Smoke control systems: Pressurisation and smoke-exhaust design and acceptance
EN 81-72:2020 — Firefighters lifts: Fire-fighter lift features
BS EN 12101-6:2005 — Smoke and heat control systems — Specification for pressure differential systems — Kits: System classes A–F, design pressure differences and open-door air speeds, door-opening force, leakage areas of doors / windows (Annex A), calculation method
BS EN 12101-13:2022 — Smoke and heat control systems — Pressure differential systems (PDS) — Design and calculation methods, installation, acceptance testing, routine testing and maintenance: Design and calculation of pressurised stairs, lobbies and lift wells; commissioning (pressure difference doors closed, air speed doors open)
ASHRAE Handbook of Smoke Control Engineering (2012) — Klote, Milke, Turnbull, Kashef, Ferreira — Handbook of Smoke Control Engineering: Flow through leakage paths, wall / floor leakage ratios, stack effect in pressurised stairwells and lift shafts, door-opening force
BS 9999:2017 — Fire safety in the design, management and use of buildings — Code of practice: Protected stairs, fire-fighting shafts and lobbies, when pressurisation is used in place of natural ventilation
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.