SAMPLEPsychrometric processes — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
Psychrometric processes
Sample project — Tower A · HVAC
Generated 28 Nov 2026 16:09 State points and processes on the psychrometric chart: mixing of two air streams, sensible… Project code SAMPLE
DB / WB
95.0 / 78.0 °F
Grains
117.4 gr/lb
Enthalpy
41.3 Btu/lb
1. Inputs
Group
Input
Value
Unit
Process
Process
State point
Process
Altitude
0
ft
Process
Code edition (room-state check)
NBCS 2026 Part D Sec 3 cl. 3.6 — 18–26 °C, RH 30–70 %
Load constants scaled for the site pressure: 1.08 → 1.080, 0.68 → 0.680, 4.5 → 4.500 (× p/14.696 = 1.0000); state properties use the site pressure.
Coil leaving state by the bypass-factor (contact factor) method — Carrier System Design Manual.
Room-state check: NBCS 2026 (SP 7:2026) Part D Sec 3 cl. 3.6 — occupied spaces sized for ≤ 26 °C (cooling) and ≥ 18 °C (heating), RH 30–70 %; the green box on the chart. Set the check to ‘Also the state point / leaving state’ to test this state as a room.
6. Standards and references
ASHRAE Handbook — Fundamentals 2021 — Psychrometrics (ch. 1), climatic design (ch. 14), cooling/heating load (ch. 18), solar (1997 ch. 29): Load calculation method, solar heat gain, sol-air temperature
Carrier System Design Manual Part 1 — Load Estimating (E20 form; Tables 15, 19, 20, 20A, 48, 61): Equivalent temperature differences, people gains, bypass factor
ISHRAE Handbook / weather data — Indian climatic design conditions: City design DB / WB, daily range
NBCS 2026 (SP 7:2026) Part D Sec 3 — National Building Construction Standards — Air conditioning, heating and mechanical ventilation: Design conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.