Array and string design against the inverter DC window at site temperatures, inverter coun…
Project code SAMPLE
Array
99.0 kWp
Modules
180 × 550 Wp
Strings
9 × 20 modules
Inverters
2 × 50 kW
Yield
163.6 MWh/yr
Specific yield
1652.8 kWh/kWp
PR
82.2 %
Payback
3.403 yr

1. Inputs

GroupInputValueUnit
SiteCity (irradiance & temperature)Delhi NCR
SiteRecord minimum ambient (cold Voc)2°C
SiteDesign maximum ambient (hot Vmp)45°C
SiteModule tilt (blank = latitude, min 10°)°
SiteAzimuth off true south (0 = south, ±90 = E/W)0°
SiteGround / roof albedo0.2
ArraySize the array byTarget DC capacity
ArrayTarget DC capacity100kWp
ArrayRoof length (E–W)45m
ArrayRoof width (N–S)30m
ArrayEdge setback / walkway1.0m
ArrayModule orientation in the rowPortrait, 1 module high
Module (STC datasheet)Pmax550Wp
Module (STC datasheet)Voc49.8V
Module (STC datasheet)Vmp41.9V
Module (STC datasheet)Isc14.0A
Module (STC datasheet)Imp13.1A
Module (STC datasheet)Temp. coefficient of Voc-0.27%/°C
Module (STC datasheet)Temp. coefficient of Pmax-0.35%/°C
Module (STC datasheet)NOCT45°C
Module (STC datasheet)Module length2.278m
Module (STC datasheet)Module width1.134m
Module (STC datasheet)Max series fuse rating25A
InverterRated AC output (each)50kW
InverterMax DC input voltage1100V
InverterMPPT window — min200V
InverterMPPT window — max1000V
InverterNumber of MPPTs4
InverterMax input current per MPPT32A
InverterString inputs per MPPT2
InverterTarget DC / AC ratio1.2
InverterEuro efficiency98.0%
InverterAC voltage415 V three-phase (India)
InverterTransformerless inverter (needs Type B / 300 mA RCD per IEC 62109)True
LossesSoiling3%
LossesNear shading1%
LossesMismatch + LID2.5%
LossesDC wiring1.5%
LossesAC wiring + transformer1.0%
LossesAvailability / downtime1.0%
CablesString cable run (one way, longest)40m
CablesDC voltage drop limit1.5%
CablesAC cable inverter → ACDB / LT panel60m
CablesAC conductorAuto — copper up to 50 mm², aluminium above (NBCS 2026 D2 10.8)
CablesAC voltage drop limit1.0%
EconomicsInstalled cost45000₹/kWp
EconomicsGrid tariff offset8.0₹/kWh
EconomicsAnnual degradation0.55%/yr
EconomicsGrid emission factor0.716kg CO₂/kWh

2. Results

Site and orientation

ItemValueUnitNote / basis
City / latitudeDelhi NCR / 28.6°N
Annual GHI (horizontal)1846.2kWh/m²
Tilt / azimuth29° / 0°
Annual irradiation in the array plane2011.97kWh/m²transposition gain +9.0 %
Sun elevation 9 am, 21 December22.28°row-shading design point
Row pitch (slant height 2.28 m)4.69mclear gap 2.70 m
Ground coverage ratio0.4859

String design

ItemValueUnitNote / basis
Voc at 2 °C52.89V/module
Cell temperature at 45 °C ambient, 1000 W/m²76.25°C
Vmp at that cell temperature34.38V/module
Max modules per string (Voc cold ≤ Vdc max; Vmp ≤ MPPT max)20
Min modules per string (Vmp hot ≥ MPPT min)6
Modules per string20
String Voc cold / Vmp STC / Vmp hot1058 / 838 / 688V
Strings9
Modules / capacity180 / 99.00 kWp
Inverters2 × 50 kW = 100 kW AC
DC / AC ratio0.99
Strings per inverter / per MPPT5 / 2
Operating current per MPPT (strings × Isc)28.0A

Losses and performance

ItemValueUnitNote / basis
System losses (soiling, shading, mismatch/LID, DC, AC, availability)9.61%
Inverter efficiency98.0%
Clipping (DC/AC ratio)0.0%
Irradiation-weighted temperature loss7.26%
Performance ratio82.15%
CUF18.87%
Specific yield1652.85kWh/kWp/yr
Annual generation (year 1)163631.92kWh

Cables

ItemValueUnitNote / basis
String current (1.25 × Isc)17.5A
String cable (PV1-F Cu, +/− separate)4mm²40 A, 0.94 % drop over 40 m
AC current per inverter73.22A
AC cable per inverter (XLPE armoured Al)3½C × 95mm²175 A, 0.87 % over 60 m
Earthing conductor6 mm² Cu (module frames, structure) / 16 mm² Cu (inverter, ACDB) to the building earth

Protection (IEC 62548 / IEC 60364-7-712)

ItemValueUnitNote / basis
String fuses (gPV)not required (≤ 2 strings per MPPT, module fuse rating not exceeded)
DC isolator per inverter / MPPT1200 V, 40 A
DC SPD Type 2 (each MPPT / combiner)Uc ≥ 1269 V, In 20 kA
AC breaker per inverter100 A 4P MCCB
AC SPD Type 2 at the ACDBUc 275 V, In 20 kA (Type 1+2 if the building has an LPS)
Residual currentType B RCD / RCMU per IEC 62109-2 (transformerless)
Anti-islanding / grid protectionIEC 62116 / CEA technical standards; over/under V-f, reconnection delay; zero-export device where the DISCOM limits export

Building code — NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 10.8

ItemValueUnitNote / basis
Cables (10.8.3.1 v)copper; VD ≤ 2 %; DC solar cable IS 17293; AC Cu up to 50 mm²AC Al 95 mm² (Cu would be 70 mm²); DC 0.94 %, AC 0.87 %
Enclosures (10.8.3.1 iii, iv)DC / AC distribution boxes IP 65; inverter IP 54
Earthing (10.8.3.1 vi, 10.8.3.3)independent d.c. and a.c. earth systems, Cu / Cu-bonded steel, interconnected at earth level
Lightning protection (11.6.1.5)vertical air-terminals over the array bonded to the mesh / down-conductors; structure bonded; DC SPD at inverter / JB, AC SPD at inverter output and mains
Statutory (10.8.3)CEA Safety Regulations 2023, Reg. 119 / 121; net meter by the DISCOM

Economics and environment

ItemValueUnitNote / basis
Installed cost4455000.0₹
Year-1 savings at ₹8/kWh1309055.33₹
Simple payback3.4yr
25-year generation (degradation 0.55 %/yr)3831.85MWh
CO₂ avoided per year117.16t

Monthly generation

MonthGHI kWh/m²/dPOA kWh/m²/dCell °CTemp. factorkWh
Jan3.65.08350.96413318
Feb4.55.66390.9513187
Mar5.66.26460.92615754
Apr6.56.42510.90915343
May6.86.14530.90215050
Jun6.35.5510.90713137
Jul5.04.49450.92911337
Aug4.84.56450.92911505
Sep5.25.47490.91713199
Oct5.06.09500.91415123
Nov4.05.56430.93713703
Dec3.44.97360.9612975
Year5.065.51163632

Bill of quantities (preliminary)

ItemQtyUnit
PV module 550 Wp180nos
String inverter 50 kW2nos
Module mounting structure (HDG / Al)99.0kWp
DC cable 4 mm² Cu PV1-F792m
AC cable 95 mm² Al XLPE132m
MC4 connector pairs18nos
String fuses0nos
DC SPD Type 28nos
AC MCCB 100 A2nos
ACDB with AC SPD, metering CTs1set
Bidirectional net meter + solar meter1set
Earthing pits + 6/16 mm² Cu3sets
Walkways / lifeline / signage1lot
Roof 45 × 30 m (N ↑) · 180 modules in 5 rows, pitch 4.69 m, tilt 29° · 99.0 kWpString SLD (per inverter)5 strings× 20 modules4 mm²DC isoSPD T2Inverter 50 kW4 MPPT · RCMU95 mm²MCCB 100 AACDB · SPDNet meterLT panel / grid× 2 inverters · 415 V 3-ph · Delhi NCR · 164 MWh/yrMonthly generation — 99.0 kWp, Delhi NCR (year 1, 163,631 kWh)04 0008 00012 00016 00020 000monthkWhJan: 13 318Feb: 13 187Mar: 15 754Apr: 15 343May: 15 050Jun: 13 137Jul: 11 337Aug: 11 505Sep: 13 199Oct: 15 123Nov: 13 703Dec: 12 975JanFebMarAprMayJunJulAugSepOctNovDecmean 13,636 kWh/monthgeneration kWh

3. Checks

CheckResultNote
String Voc at 2 °C: 20 × 52.9 = 1058 V ≤ 1100 VPASSIEC 62548 §7.3.2
String Vmp at 76 °C cell: 20 × 34.4 = 688 V ≥ MPPT min 200 VPASS
String Vmp at STC 838 V ≤ MPPT max 1000 VPASS
MPPT current 28.0 A (2 strings × Isc) ≤ 32 A, 2 ≤ 2 inputsPASSinverter max input current per MPPT (its short-circuit rating is separate and higher)
DC/AC ratio 0.99 within 0.9–1.35PASS2 × 50 kW inverters; clipping loss ≈ 0.0 %
Roof: 180 modules need 5 rows at 4.69 m pitch; roof takes 222PASS9 am 21-Dec sun elevation 22.3° → row gap 2.70 m
DC string cable 4 mm² Cu: 0.94 % ≤ 1.5 %, 40 A ≥ 17.5 APASS
AC cable 95 mm² Al: 0.87 % ≤ 1 %, 175 A ≥ 92 APASSper inverter
NBCS cable voltage drop: DC 0.94 % and AC 0.87 % ≤ 2 % eachPASSNBCS 2026 D2 cl. 10.8.3.1 table v)
AC conductor Al 95 mm² — copper required where the Cu size ≤ 50 mm² (Cu size here 70 mm²)PASSNBCS 2026 D2 cl. 10.8.3.1 table v): a.c. cables copper up to 50 mm²

4. Worked example

Worked from this calculation's own inputs — each value matches the results tables above.

99.0 kWp — 9 strings × 20 modules, 2 × 50 kW inverters
Delhi NCR, tilt 29°, azimuth 0°
Given: Module 550 Wp, Voc 49.8 V, Vmp 41.9 V, Isc 14 A, βVoc -0.27 %/°C · Site Tmin 2 °C, Tmax 45 °C, NOCT 45 °C · Inverter Vdc,max 1100 V, MPPT 200–1000 V
1. Cold open-circuit voltage: Voc(Tmin) = Voc · (1 + β · (Tmin − 25)) = 49.8 · (1 + -0.0027 · (2 − 25)) = 52.89 V
2. Max modules per string: Nmax = ⌊Vdc,max / Voc,cold⌋ (and Vmp ≤ MPPT max) = ⌊1100 / 52.89⌋ = 20
3. Hot cell temperature: Tcell = Tmax + (NOCT − 20) / 800 · 1000 = 45 + (45 − 20) / 800 · 1000 = 76 °C
4. Hot MPP voltage: Vmp(Tcell) = Vmp · (1 + βP · (Tcell − 25)) = 41.9 · (1 + -0.0035 · (76 − 25)) = 34.38 V
5. Min modules per string: Nmin = ⌈VMPPT,min / Vmp,hot⌉ = ⌈200 / 34.38⌉ = 6
6. String length: Nmin ≤ N ≤ Nmax → 6 ≤ 20 ≤ 20 PASS
7. Array: kWp = strings · N · Pmod / 1000 = 9 · 20 · 550 / 1000 = 99 kWp
8. DC / AC ratio: 0.9 ≤ kWp / (ninv · Pinv) ≤ 1.35 → 99.00 / (2 · 50) = 0.99 PASS
9. Row pitch (9 am, 21 Dec): p = h · cos t + h · sin t / tan β = 2.28 · cos 29° + 2.28 · sin 29° / tan 22.3° = 4.69 m
10. Annual yield: E = Σ kWp · HT · days · fT · (1 − losses) · ηinv = 99.0 kWp · 2012 kWh/m² · … = 163 632 kWh (PR 82.2 %, specific yield 1653 kWh/kWp)
11. DC string cable drop: VD = 2 · L · I · ρ / (A · V) = 2 · 40 · 17.5 · 0.0225 / (4 · 838) = 0.94 %
12. AC cable drop: VD = √3 · L · I · ρ / (A · V) = 1.732 · 60 · 91.5 · 0.036 / (95 · 415) = 0.87 % (Al 95 mm²)
13. NBCS 2026 D2 10.8 cables: VD ≤ 2 % each; AC Cu where the Cu size ≤ 50 mm² → DC 0.94 %, AC 0.87 %; Cu size 70 mm² → Al 95 mm² PASS