SAMPLERooftop solar PV — yield, strings, inverter, cables — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
Rooftop solar PV — yield, strings, inverter, cables
Sample project — Tower A · Electrical
Generated 28 Nov 2026 16:09 Array and string design against the inverter DC window at site temperatures, inverter coun… Project code SAMPLE
Array
99.0 kWp
Modules
180 × 550 Wp
Strings
9 × 20 modules
Inverters
2 × 50 kW
Yield
163.6 MWh/yr
Specific yield
1652.8 kWh/kWp
PR
82.2 %
Payback
3.403 yr
1. Inputs
Group
Input
Value
Unit
Site
City (irradiance & temperature)
Delhi NCR
Site
Record minimum ambient (cold Voc)
2
°C
Site
Design maximum ambient (hot Vmp)
45
°C
Site
Module tilt (blank = latitude, min 10°)
°
Site
Azimuth off true south (0 = south, ±90 = E/W)
0
°
Site
Ground / roof albedo
0.2
Array
Size the array by
Target DC capacity
Array
Target DC capacity
100
kWp
Array
Roof length (E–W)
45
m
Array
Roof width (N–S)
30
m
Array
Edge setback / walkway
1.0
m
Array
Module orientation in the row
Portrait, 1 module high
Module (STC datasheet)
Pmax
550
Wp
Module (STC datasheet)
Voc
49.8
V
Module (STC datasheet)
Vmp
41.9
V
Module (STC datasheet)
Isc
14.0
A
Module (STC datasheet)
Imp
13.1
A
Module (STC datasheet)
Temp. coefficient of Voc
-0.27
%/°C
Module (STC datasheet)
Temp. coefficient of Pmax
-0.35
%/°C
Module (STC datasheet)
NOCT
45
°C
Module (STC datasheet)
Module length
2.278
m
Module (STC datasheet)
Module width
1.134
m
Module (STC datasheet)
Max series fuse rating
25
A
Inverter
Rated AC output (each)
50
kW
Inverter
Max DC input voltage
1100
V
Inverter
MPPT window — min
200
V
Inverter
MPPT window — max
1000
V
Inverter
Number of MPPTs
4
Inverter
Max input current per MPPT
32
A
Inverter
String inputs per MPPT
2
Inverter
Target DC / AC ratio
1.2
Inverter
Euro efficiency
98.0
%
Inverter
AC voltage
415 V three-phase (India)
Inverter
Transformerless inverter (needs Type B / 300 mA RCD per IEC 62109)
True
Losses
Soiling
3
%
Losses
Near shading
1
%
Losses
Mismatch + LID
2.5
%
Losses
DC wiring
1.5
%
Losses
AC wiring + transformer
1.0
%
Losses
Availability / downtime
1.0
%
Cables
String cable run (one way, longest)
40
m
Cables
DC voltage drop limit
1.5
%
Cables
AC cable inverter → ACDB / LT panel
60
m
Cables
AC conductor
Auto — copper up to 50 mm², aluminium above (NBCS 2026 D2 10.8)
Cables
AC voltage drop limit
1.0
%
Economics
Installed cost
45000
₹/kWp
Economics
Grid tariff offset
8.0
₹/kWh
Economics
Annual degradation
0.55
%/yr
Economics
Grid emission factor
0.716
kg CO₂/kWh
2. Results
Site and orientation
Item
Value
Unit
Note / basis
City / latitude
Delhi NCR / 28.6°N
Annual GHI (horizontal)
1846.2
kWh/m²
Tilt / azimuth
29° / 0°
Annual irradiation in the array plane
2011.97
kWh/m²
transposition gain +9.0 %
Sun elevation 9 am, 21 December
22.28
°
row-shading design point
Row pitch (slant height 2.28 m)
4.69
m
clear gap 2.70 m
Ground coverage ratio
0.4859
String design
Item
Value
Unit
Note / basis
Voc at 2 °C
52.89
V/module
Cell temperature at 45 °C ambient, 1000 W/m²
76.25
°C
Vmp at that cell temperature
34.38
V/module
Max modules per string (Voc cold ≤ Vdc max; Vmp ≤ MPPT max)
20
Min modules per string (Vmp hot ≥ MPPT min)
6
Modules per string
20
String Voc cold / Vmp STC / Vmp hot
1058 / 838 / 688
V
Strings
9
Modules / capacity
180 / 99.00 kWp
Inverters
2 × 50 kW = 100 kW AC
DC / AC ratio
0.99
Strings per inverter / per MPPT
5 / 2
Operating current per MPPT (strings × Isc)
28.0
A
Losses and performance
Item
Value
Unit
Note / basis
System losses (soiling, shading, mismatch/LID, DC, AC, availability)
9.61
%
Inverter efficiency
98.0
%
Clipping (DC/AC ratio)
0.0
%
Irradiation-weighted temperature loss
7.26
%
Performance ratio
82.15
%
CUF
18.87
%
Specific yield
1652.85
kWh/kWp/yr
Annual generation (year 1)
163631.92
kWh
Cables
Item
Value
Unit
Note / basis
String current (1.25 × Isc)
17.5
A
String cable (PV1-F Cu, +/− separate)
4
mm²
40 A, 0.94 % drop over 40 m
AC current per inverter
73.22
A
AC cable per inverter (XLPE armoured Al)
3½C × 95
mm²
175 A, 0.87 % over 60 m
Earthing conductor
6 mm² Cu (module frames, structure) / 16 mm² Cu (inverter, ACDB) to the building earth
Protection (IEC 62548 / IEC 60364-7-712)
Item
Value
Unit
Note / basis
String fuses (gPV)
not required (≤ 2 strings per MPPT, module fuse rating not exceeded)
DC isolator per inverter / MPPT
1200 V, 40 A
DC SPD Type 2 (each MPPT / combiner)
Uc ≥ 1269 V, In 20 kA
AC breaker per inverter
100 A 4P MCCB
AC SPD Type 2 at the ACDB
Uc 275 V, In 20 kA (Type 1+2 if the building has an LPS)
Residual current
Type B RCD / RCMU per IEC 62109-2 (transformerless)
Anti-islanding / grid protection
IEC 62116 / CEA technical standards; over/under V-f, reconnection delay; zero-export device where the DISCOM limits export
Building code — NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 10.8
Item
Value
Unit
Note / basis
Cables (10.8.3.1 v)
copper; VD ≤ 2 %; DC solar cable IS 17293; AC Cu up to 50 mm²
AC Al 95 mm² (Cu would be 70 mm²); DC 0.94 %, AC 0.87 %
Enclosures (10.8.3.1 iii, iv)
DC / AC distribution boxes IP 65; inverter IP 54
Earthing (10.8.3.1 vi, 10.8.3.3)
independent d.c. and a.c. earth systems, Cu / Cu-bonded steel, interconnected at earth level
Lightning protection (11.6.1.5)
vertical air-terminals over the array bonded to the mesh / down-conductors; structure bonded; DC SPD at inverter / JB, AC SPD at inverter output and mains
Statutory (10.8.3)
CEA Safety Regulations 2023, Reg. 119 / 121; net meter by the DISCOM
Economics and environment
Item
Value
Unit
Note / basis
Installed cost
4455000.0
₹
Year-1 savings at ₹8/kWh
1309055.33
₹
Simple payback
3.4
yr
25-year generation (degradation 0.55 %/yr)
3831.85
MWh
CO₂ avoided per year
117.16
t
Monthly generation
Month
GHI kWh/m²/d
POA kWh/m²/d
Cell °C
Temp. factor
kWh
Jan
3.6
5.08
35
0.964
13318
Feb
4.5
5.66
39
0.95
13187
Mar
5.6
6.26
46
0.926
15754
Apr
6.5
6.42
51
0.909
15343
May
6.8
6.14
53
0.902
15050
Jun
6.3
5.5
51
0.907
13137
Jul
5.0
4.49
45
0.929
11337
Aug
4.8
4.56
45
0.929
11505
Sep
5.2
5.47
49
0.917
13199
Oct
5.0
6.09
50
0.914
15123
Nov
4.0
5.56
43
0.937
13703
Dec
3.4
4.97
36
0.96
12975
Year
5.06
5.51
163632
Bill of quantities (preliminary)
Item
Qty
Unit
PV module 550 Wp
180
nos
String inverter 50 kW
2
nos
Module mounting structure (HDG / Al)
99.0
kWp
DC cable 4 mm² Cu PV1-F
792
m
AC cable 95 mm² Al XLPE
132
m
MC4 connector pairs
18
nos
String fuses
0
nos
DC SPD Type 2
8
nos
AC MCCB 100 A
2
nos
ACDB with AC SPD, metering CTs
1
set
Bidirectional net meter + solar meter
1
set
Earthing pits + 6/16 mm² Cu
3
sets
Walkways / lifeline / signage
1
lot
3. Checks
Check
Result
Note
String Voc at 2 °C: 20 × 52.9 = 1058 V ≤ 1100 V
PASS
IEC 62548 §7.3.2
String Vmp at 76 °C cell: 20 × 34.4 = 688 V ≥ MPPT min 200 V
PASS
String Vmp at STC 838 V ≤ MPPT max 1000 V
PASS
MPPT current 28.0 A (2 strings × Isc) ≤ 32 A, 2 ≤ 2 inputs
PASS
inverter max input current per MPPT (its short-circuit rating is separate and higher)
DC/AC ratio 0.99 within 0.9–1.35
PASS
2 × 50 kW inverters; clipping loss ≈ 0.0 %
Roof: 180 modules need 5 rows at 4.69 m pitch; roof takes 222
PASS
9 am 21-Dec sun elevation 22.3° → row gap 2.70 m
DC string cable 4 mm² Cu: 0.94 % ≤ 1.5 %, 40 A ≥ 17.5 A
PASS
AC cable 95 mm² Al: 0.87 % ≤ 1 %, 175 A ≥ 92 A
PASS
per inverter
NBCS cable voltage drop: DC 0.94 % and AC 0.87 % ≤ 2 % each
PASS
NBCS 2026 D2 cl. 10.8.3.1 table v)
AC conductor Al 95 mm² — copper required where the Cu size ≤ 50 mm² (Cu size here 70 mm²)
PASS
NBCS 2026 D2 cl. 10.8.3.1 table v): a.c. cables copper up to 50 mm²
4. Worked example
Worked from this calculation's own inputs — each value matches the results tables above.
9. Row pitch (9 am, 21 Dec): p = h · cos t + h · sin t / tan β = 2.28 · cos 29° + 2.28 · sin 29° / tan 22.3° = 4.69 m
10. Annual yield: E = Σ kWp · HT · days · fT · (1 − losses) · ηinv = 99.0 kWp · 2012 kWh/m² · … = 163 632 kWh(PR 82.2 %, specific yield 1653 kWh/kWp)
11. DC string cable drop: VD = 2 · L · I · ρ / (A · V) = 2 · 40 · 17.5 · 0.0225 / (4 · 838) = 0.94 %
12. AC cable drop: VD = √3 · L · I · ρ / (A · V) = 1.732 · 60 · 91.5 · 0.036 / (95 · 415) = 0.87 %(Al 95 mm²)
13. NBCS 2026 D2 10.8 cables: VD ≤ 2 % each; AC Cu where the Cu size ≤ 50 mm² → DC 0.94 %, AC 0.87 %; Cu size 70 mm² → Al 95 mm² PASS
5. Notes
NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 10.8 / 11.6.1.5: copper cables with ≤ 2 % voltage drop (AC copper up to 50 mm²); IP 65 DC / AC boxes and IP 54 inverter; separate d.c. and a.c. earthing interconnected at earth level; air-terminals over the array bonded to the LPS with the module structure; Class I/II SPDs on the d.c. side (inverter / junction box) and the a.c. side (inverter output, mains).
Monthly GHI and ambient temperature are long-term averages (NASA POWER / IMD); use a site TMY (Meteonorm / SolarGIS) for bankable yield. Transposition is Liu–Jordan isotropic with Erbs diffuse fraction; PVsyst-type models differ by ±3 %.
Net metering rules vary by DISCOM (capacity caps as % of sanctioned load, export limits, single-phase ≤ 10 kW); check the state regulation before fixing inverter size.
Structure design (wind uplift per IS 875-3, roof loading, waterproofing) and the roof's structural capacity are outside this calculation.
6. Standards and references
IS 732:2019 — Code of practice for electrical wiring installations: Voltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IEC 61643-11:2011 — Surge protective devices connected to low-voltage power systems: SPD ratings (Iimp, In, Up)
IEC 62548:2016 / IS 16221 — Photovoltaic (PV) arrays — design requirements: String Voc at minimum temperature, fuse requirements, DC isolators, SPDs, cable ratings
IEC 60364-7-712:2017 — Low-voltage installations — solar PV power supply systems: DC wiring, protection against overcurrent and earth faults, RCD type for transformerless inverters
IS 16221 (Part 1/2):2015 — Safety of power converters for use in PV systems (IEC 62109): Inverter safety, RCMU / residual-current monitoring, anti-islanding
CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 / amendments — Grid connectivity of rooftop PV: Voltage / frequency protection, harmonics, net-metering interface, metering
NBCS 2026 (SP 7:2026) Part D Sec 2 — National Building Construction Standards — Electrical and allied installations: Load assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.