Rainwater — harvesting, roof drainage, recharge pit

Sample project — Tower A · Plumbing / PHE
Generated 28 Nov 2026 16:09
Annual and monthly harvesting (NBCS 2026 Table 26, runoff coefficients 4.5.11.2) with stor…
Project code SAMPLE
Annual harvest
1400.0 m³
Tank
60.0 m³
Downpipes
8 × DN 100
Gutter
half-round 200 mm
Recharge pits
18 nos
Demand met
10.5 %

1. Inputs

GroupInputValueUnit
CatchmentDesign regimeIndia — NBCS 2026 Part E Sec 2 (EN 12056-3 shown alongside)
CatchmentIndian code editionNBCS 2026 (SP 7:2026) — C 0.9 / 0.8 / 0.3 / 0.15, Table 25, Table 26
CatchmentRoof area (plan)1200m²
CatchmentPaved area800m²
CatchmentUnpaved ground0m²
CatchmentLawns / parks / green area1000m²
CatchmentAnnual rainfall800mm
CatchmentMonthly rainfall patternSW monsoon (most of India)
CatchmentDesign storm intensity (drainage / recharge)75mm/h
CatchmentStorm duration for recharge1h
HarvestingStorage for dry days (0 = first-flush + 1 day)3days
HarvestingNon-potable demand20000L/day
HarvestingFirst flush2mm
Roof drainageNumber of downpipes8
Roof drainageDown-pipe materialPVC / HDPE (NBCS Table 25 × 1.44)
Roof drainageGutter typeHalf-round eaves gutter
RechargeSoilSandy loam (25 mm/h)
RechargeRecharge pit diameter2m
RechargePit depth3m
RechargeRecharge bore in each pitTrue
RechargeHighest ground-water level below ground15m

2. Results

Rainwater

ItemValueUnitNote / basis
Runoff coefficientsroof 0.9 · paved 0.8 · unpaved 0.3 · lawns 0.15 (NBCS E2 4.5.11.2); roof harvest 80 % (Table 26)
Annual harvest potential (all surfaces)1400.0m³/yr
— from roof only768.0m³/yr1200 × 800/1000 × 0.8 (NBCS Table 26)
First-flush diverter2400.0Ldivert the first rain after a dry spell (NBCS E2 4.5.12.3.1)
Storage tank60.0m³3 day(s) of 20 m³/day
Demand met from roof rain (monthly balance)10.52%SW monsoon (most of India) pattern
Design storm75 mm/h → roof runoff 25.0 L/s
Downpipes — BS EN 12056-3 (international method)8 × DN 75 (3.12 L/s each; capacity 4.97 L/s)
Downpipes — NBCS 2026 Table 258 × DN 100 (roof 150 m² each ≤ 161 m²)RA = 0.084·d^2.5/I × 1.44 (NBCS E2 4.5.11.6.8)
Downpipes — governing8 × DN 100larger of NBCS Table 25 and EN 12056-3
Gutterhalf-round 200 mm for 3.12 L/s per run
Storm runoff to recharge (1 h)140.25m³
Recharge pit capacity7.85m³ per pitstorage 3.3 + percolation 0.5 + bore 4.0
Pits required18nosØ2.0 m × 3.0 m deep, filter media (boulders / gravel / sand); number and type per local / state bye-law (NBCS E2 4.5.12.1)

Downpipe capacity (EN 12056-3, ⅓ full) and NBCS 2026 Table 25 roof area at 75 mm/h

DN mmEN L/sEN roof m² at design stormNBCS T25 CI m²NBCS PVC m²
754.9723854.678.6
10010.69513112.0161.3
12519.39931195.7281.7
15031.531514308.6444.4
20067.913260633.6912.3

Monthly balance — roof harvest vs demand

MonthRain mmHarvest m³Demand m³Used m³Overflow → recharge m³Tank end m³
Jan87.7620.07.70.00.0
Feb87.7560.07.70.00.0
Mar87.7620.07.70.00.0
Apr1615.4600.015.40.00.0
May2423.0620.023.00.00.0
Jun10499.8600.099.80.00.0
Jul216207.4620.0207.40.00.0
Aug200192.0620.0192.00.00.0
Sep136130.6600.0130.60.00.0
Oct5653.8620.053.80.00.0
Nov1615.4600.015.40.00.0
Dec87.7620.07.70.00.0
Monthly roof harvest vs non-potable demand, tank 60 m³ — 11 % of demand met02004006008001 000Monthm³ per monthJan: 7.7Feb: 7.7Mar: 7.7Apr: 15.4May: 23Jun: 99.8Jul: 207Aug: 192Sep: 131Oct: 53.8Nov: 15.4Dec: 7.7Jan: 620Feb: 560Mar: 620Apr: 600May: 620Jun: 600Jul: 620Aug: 620Sep: 600Oct: 620Nov: 600Dec: 620JanFebMarAprMayJunJulAugSepOctNovDecRoof harvest (m³)Demand (m³)Tank level at month end (m³)

3. Checks

CheckResultNote
Downpipe DN 75 capacity ≥ 3.12 L/s (BS EN 12056-3, international method)PASS
NBCS 2026 Table 25: DN 100 drains 161 m² ≥ 150 m² per pipe at 75 mm/hPASSNBCS 2026 Part E Sec 2 4.5.11.6.8 / Table 25 governs for India
Recharge pit bottom at 3 m is 12 m (≥ 5 m) above the highest water table at 15 mPASSNBCS 2026 Part E Sec 2 4.5.12.4 (d); silt trap at each inlet (c)

4. Worked example

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Rainwater — harvest, down-pipes and recharge
from this project's catchment and design storm
Given: Catchment roof 1200 m², paved 800 m², unpaved 0 m², lawns 1000 m² · Rain 800 mm/yr, design storm 75 mm/h, 8 down-pipes
1. Roof harvest (NBCS Table 26): V = 0.8 · Aroof · R / 1000 = 0.8 × 1200 × 800 / 1000 = 768 m³/yr (80 % of gross precipitation)
2. Storage: S = demand · days = 20 × 3 = 60 m³ (11 % of the year's demand met (monthly balance))
3. Roof runoff: Q = A · i / 3600 = 1200 × 75 / 3600 = 25 L/s (3.12 L/s and 150 m² per pipe)
4. EN 12056-3 capacity (international): Q = 3.15×10⁻⁴ · f5/3 · d8/3, f = 0.33 = d = 75 = 4.97 L/s (≥ 3.12 L/s → DN 75)
5. NBCS roof area per pipe: RA = 0.084 · d2.5 / I × kmat = 0.084 × 1002.5 / 75 × 1.44 = 161.3 m² (NBCS E2 4.5.11.6.8, Table 25 (PVC × 1.44))
6. Governing down-pipe: RA ≥ Aroof / n and EN capacity ≥ q → DN 100: 161 ≥ 150 m² PASS
7. Storm runoff: V = Σ(A·C) · i · t / 1000 = 1870 × 75 × 1 / 1000 = 140.2 m³
8. Pit capacity: Vpit = 0.35 · πd²/4 · h + (πdh + πd²/4) · k · t + bore = 3.3 + 0.5 + 4.0 = 7.8 m³
9. Pits: n = ⌈V / Vpit⌉ = ⌈140.2 / 7.8⌉ = 18 nos

5. Notes

6. Standards and references

Prepared by
Checked by
Approved by