r = 150 mm/h · 12692 m² · 529 L/s
Project code SAMPLE
Intensity
150 mm/h
Catchment
12692 m²
Design flow
528.8 L/s
Outlets / RWPs
26 nos
Gutters
3/3 OK
Emergency flow
793.3 L/s
Min. pressure
-7.9 m

1. Design basis

ItemValueBasis
Design rainfall intensity r150 mm/hdesign value entered
Emergency intensity225 mm/hBS 8490 / EN 12056-3 §7 — overflow at the 100-yr storm or 1.5 × design
IMD generalised IDF (reference)284 mm/h (5-yr, 5-min, Delhi NCR); 100-yr 518 mm/hKothyari & Garde (1992): i = C·T^0.20·R24^0.33 / t^0.71
Municipal / local minimum100 mm/hlocal bye-law / practice — NBCS 2026 E2 sets no fixed value: intensity from IMD / IRC data (4.5.11.2.3), RWPs for a very short time of concentration (4.5.11.2.5)
Runoff coefficient C1roof: 1.0
Effective catchmentA_E = plan + plan·(h/2)/B + extended + 0.5 × wallBS EN 12056-3 §4.2 (pitched roofs L·(B + h/2), walls 50 %)
Gutter capacityeaves gutter of rectangular / trapezoidal shape, Q_L = 0.9 × Q_N, Q_N = Q_SE × F_D × F_S, Q_SE = 3.48×10⁻⁵ · A_E^1.25 (EN 12056-3 5.1.4)BS EN 12056-3 §5.1 / 5.2, Figures 5–6, Table 6
Primary systemsiphonic full-bore (BS 8490:2007, ASPE 45, EN 12056-3 Annex)
Emergency systemduplicate siphonic system for 100 % of the emergency flowindependent of the primary system (BS 8490 §6, EN 12056-3 §7); NBCS 2026 E2 4.5.11.6.10: flat roofs need an emergency drain (down take or spout), horizontal outlets 100 % / side gratings 50 % of flow; Fig. 11A overflow weir 50 mm above roof
Indian RWP table (NBCS 2026)RA = 0.084 · d2.5 / I × 1.44 (PVC / HDPE)NBCS 2026 Part E Sec 2 4.5.11.6.8, Table 25 and Note; walls + 50 % (one) / + 35 % (two) — Notes 1–2
Roof falls / strainers (flat roofs)1:150–1:133 smooth, 1:100 stone / tiles, 1:75–1:66 gravel; strainer 1.5–2 × pipe areaNBCS 2026 Part E Sec 2 4.5.11.6.8
Rainfall intensity–duration — IMD generalised IDF, Delhi NCR (R24 = 90 mm)04008001 2001 6002 000Duration t (min)Intensity (mm/h)01224364860emergency 225 mm/hdesign 150 mm/hT = 2 yrT = 5 yrT = 10 yrT = 25 yrT = 100 yr
Figure 1 — IMD generalised IDF curves for the city (Kothyari–Garde) with the design intensity and the emergency intensity.

2. Roof drainage plan

Area-014011 m² · 167.1 L/s · pitch 8° · gutter level 12 mGutter 700×325 · cap 57 L/s · 9 outlets @ 9.8 m · 18.6 L/s eachRWDP-01: collector to d315 · 1 × downpipe d250 (167 L/s) · p_min -7.9 mEmergency: 11 siphonic outlets, 2 × d250 for 251 L/sArea-026801 m² · 283.4 L/s · pitch 8° · gutter level 12 mGutter 700×325 · cap 56 L/s · 13 outlets @ 7.0 m · 21.8 L/s eachRWDP-02: collector to d250 · 3 × downpipe d200 (109 L/s) · p_min -7.5 mEmergency: 18 siphonic outlets, 2 × d315 for 425 L/sArea-061880 m² · 78.3 L/s · pitch 8° · gutter level 12 mGutter 700×325 · cap 71 L/s · 4 outlets @ 12.1 m · 19.6 L/s eachRWDP-06: collector to d250 · 1 × downpipe d200 (78 L/s) · p_min -7.1 mEmergency: 5 siphonic outlets, 1 × d200 for 118 L/sRoof drainage plan — fall arrows to the gutter (blue), outlets (red), tributary boundaries (dashed), siphonic downpipes (violet) · r = 150 mm/h, emergency 225 mm/h.

3. Calculation per gutter run

Area-01 — RWDP-01: gutter run 88.3 m, roof depth 33.1 m, pitch 8°, eave 12 m

Rainwater flow
Plan area A_plan2926.4 m²
Pitched addition = A_plan × (h/2)/B, h = B·tan 8° = 4.65 m205.6 m²
Extended / other area879.1 m²
Wall above roof × 0.50.0 m²
Effective catchment A_E4011.1 m²
Q = C · r · A_E / 3600 = 1 × 150 × 4011.1 / 3600167.1 L/s
Outlets n = 9 (spacing 9.8 m ≤ 20 m) → tributary per outlet A_E/n = 446 m²18.6 L/s per outlet
Emergency Q_em = 1 × 225 × 4011.1 / 3600250.7 L/s
Gutter capacity (BS EN 12056-3)
Gutter 700 (T) × 700 (S) × 325 (H) mm, box / rectangular, laid level
Freeboard 75 mm → design water depth W = H − freeboard250 mm
Wetted section A_E = (T + S)/2 × W175000 mm²
Q_SE = 3.48 × 10⁻⁵ × A_E^1.25124.56 L/s
Depth factor F_D at W/T = 0.357 (Figure 5)0.78
Shape factor F_S at S/T = 1.00 (Figure 6)1.00
Q_N = Q_SE × F_D × F_S97.16 L/s
Q_L = 0.9 × Q_N (factor of safety for non-half-round shapes, 5.1.4)87.45 L/s
L/W = 88300 / 250 = 353 → long gutter, Table 6 F_L0.65
Gutter capacity Q = Q_L × F_L56.6 L/s
Flow at the critical section (one outlet's tributary arriving from both sides) 18.6 L/s ≤ 56.6 L/s → 33 % utilisedPASS
Siphonic system
Systems per gutter run1 (9 outlets, 167 L/s each)
Available head H = gutter water level − discharge11.50 m
Collector (far end → downpipe) / downpipe / ground runup to d315 / d250 / d250
Trunk velocities1.53 – 4.38 m/s (limits 1.0–6.0)
Minimum gauge pressure (top of the downpipe)-7.91 m (limit -8.0 m) PASS
Balance (all outlet paths vs head)max imbalance 7 % (tolerance ±10 %) PASS
Residual head at discharge0.42 m
HDPE per system106 m

Area-02 — RWDP-02: gutter run 90.4 m, roof depth 70.3 m, pitch 8°, eave 12 m

Rainwater flow
Plan area A_plan6354.5 m²
Pitched addition = A_plan × (h/2)/B, h = B·tan 8° = 9.88 m446.5 m²
Extended / other area0.0 m²
Wall above roof × 0.50.0 m²
Effective catchment A_E6801.0 m²
Q = C · r · A_E / 3600 = 1 × 150 × 6801.0 / 3600283.4 L/s
Outlets n = 13 (spacing 7.0 m ≤ 20 m) → tributary per outlet A_E/n = 523 m²21.8 L/s per outlet
Emergency Q_em = 1 × 225 × 6801.0 / 3600425.1 L/s
Gutter capacity (BS EN 12056-3)
Gutter 700 (T) × 700 (S) × 325 (H) mm, box / rectangular, laid level
Freeboard 75 mm → design water depth W = H − freeboard250 mm
Wetted section A_E = (T + S)/2 × W175000 mm²
Q_SE = 3.48 × 10⁻⁵ × A_E^1.25124.56 L/s
Depth factor F_D at W/T = 0.357 (Figure 5)0.78
Shape factor F_S at S/T = 1.00 (Figure 6)1.00
Q_N = Q_SE × F_D × F_S97.16 L/s
Q_L = 0.9 × Q_N (factor of safety for non-half-round shapes, 5.1.4)87.45 L/s
L/W = 90400 / 250 = 362 → long gutter, Table 6 F_L0.64
Gutter capacity Q = Q_L × F_L56.0 L/s
Flow at the critical section (one outlet's tributary arriving from both sides) 21.8 L/s ≤ 56.0 L/s → 39 % utilisedPASS
Siphonic system
Systems per gutter run3 (5 outlets, 109 L/s each)
Available head H = gutter water level − discharge11.50 m
Collector (far end → downpipe) / downpipe / ground runup to d250 / d200 / d200
Trunk velocities2.29 – 4.47 m/s (limits 1.0–6.0)
Minimum gauge pressure (top of the downpipe)-7.50 m (limit -8.0 m) PASS
Balance (all outlet paths vs head)max imbalance 6 % (tolerance ±10 %) PASS
Residual head at discharge0.37 m
HDPE per system50 m

Area-06 — RWDP-06: gutter run 48.5 m, roof depth 36.2 m, pitch 8°, eave 12 m

Rainwater flow
Plan area A_plan1756.8 m²
Pitched addition = A_plan × (h/2)/B, h = B·tan 8° = 5.09 m123.5 m²
Extended / other area0.0 m²
Wall above roof × 0.50.0 m²
Effective catchment A_E1880.3 m²
Q = C · r · A_E / 3600 = 1 × 150 × 1880.3 / 360078.3 L/s
Outlets n = 4 (spacing 12.1 m ≤ 20 m) → tributary per outlet A_E/n = 470 m²19.6 L/s per outlet
Emergency Q_em = 1 × 225 × 1880.3 / 3600117.5 L/s
Gutter capacity (BS EN 12056-3)
Gutter 700 (T) × 700 (S) × 325 (H) mm, box / rectangular, laid level
Freeboard 75 mm → design water depth W = H − freeboard250 mm
Wetted section A_E = (T + S)/2 × W175000 mm²
Q_SE = 3.48 × 10⁻⁵ × A_E^1.25124.56 L/s
Depth factor F_D at W/T = 0.357 (Figure 5)0.78
Shape factor F_S at S/T = 1.00 (Figure 6)1.00
Q_N = Q_SE × F_D × F_S97.16 L/s
Q_L = 0.9 × Q_N (factor of safety for non-half-round shapes, 5.1.4)87.45 L/s
L/W = 48500 / 250 = 194 → long gutter, Table 6 F_L0.81
Gutter capacity Q = Q_L × F_L70.6 L/s
Flow at the critical section (one outlet's tributary arriving from both sides) 19.6 L/s ≤ 70.6 L/s → 28 % utilisedPASS
Siphonic system
Systems per gutter run1 (4 outlets, 78 L/s each)
Available head H = gutter water level − discharge11.50 m
Collector (far end → downpipe) / downpipe / ground runup to d250 / d200 / d160
Trunk velocities2.05 – 5.02 m/s (limits 1.0–6.0)
Minimum gauge pressure (top of the downpipe)-7.15 m (limit -8.0 m) PASS
Balance (all outlet paths vs head)max imbalance 6 % (tolerance ±10 %) PASS
Residual head at discharge0.34 m
HDPE per system60 m

4. Schedules

Discharge — primary system

AreaNosRWDPPlan m²Pitch add m²2nd slope m²Extended m²Wall 50 % m²Catchment m² (each)r mm/hCQ L/s (each)OutletsTypeQ/outlet L/s
Area-011RWDP-012926.4205.60.0879.10.04011.11501.0167.19siphonic 2518.6
Area-021RWDP-026354.5446.50.00.00.06801.01501.0283.413siphonic 2521.8
Area-061RWDP-061756.8123.50.00.00.01880.31501.078.34siphonic 2519.6
Total311037.712692.4528.826

Discharge — emergency system

AreaERWDPCatchment m²r_em mm/hQ_em L/sProvision
Area-01ERWDP-014011.1225250.711 siphonic outlets, 2 × d250
Area-02ERWDP-026801.0225425.118 siphonic outlets, 2 × d315
Area-06ERWDP-061880.3225117.55 siphonic outlets, 1 × d200

Gutter sizing (BS EN 12056-3)

AreaGutterT mmS mmH mmW mmA_E mm²Q_SEF_DF_SQ_NkQ_LL mL/WF_LCapacity L/sQ/outlet L/sCheck
Area-01box700.0700.0325.0250175000124.560.781.097.160.987.4588.33530.6556.618.6OK
Area-02box700.0700.0325.0250175000124.560.781.097.160.987.4590.43620.6456.021.8OK
Area-06box700.0700.0325.0250175000124.560.781.097.160.987.4548.51940.8170.619.6OK

Siphonic hydraulics — Area-01 (RWDP-01, 9 outlets, head 11.5 m)

PipeFromToQ L/sd (OD)L mΣKv m/sh_f m
T1O1N118.6d751.02.05.433.57
T2O2N218.6d751.02.445.434.23
T3O3N318.6d751.02.895.434.91
T4O4N418.6d751.03.255.435.44
T5O5N518.6d751.03.475.435.77
T6O6N618.6d751.03.595.435.96
T7O7N718.6d751.03.775.436.22
T8O8N818.6d751.04.015.436.58
T9O9N918.6d631.02.07.77.46
C1N1N218.6d1259.81.41.950.65
C2N2N337.1d1609.80.92.380.68
C3N3N455.7d2009.80.92.280.53
C4N4N574.3d2509.80.91.950.34
C5N5N692.9d3159.80.91.530.18
C6N6N7111.4d3159.80.91.840.26
C7N7N8130.0d3159.80.92.150.36
C8N8N9148.6d3159.80.92.450.47
C9N9DP-top167.1d3154.90.92.760.47
DPDP-topDP-base167.1d25010.50.64.381.44
GRDP-baseDischarge167.1d2503.01.54.381.71

Balance — Area-01

OutletTailRestrictor ΔH mPath loss mAvailable mImbalance %p at downpipe top mTail v m/s
O1d750.010.6611.57.3-7.495.4
O2d750.6710.6711.57.2-7.55.4
O3d751.3410.6711.57.2-7.55.4
O4d751.8710.6711.57.2-7.55.4
O5d752.2110.6711.57.2-7.55.4
O6d752.3910.6711.57.2-7.55.4
O7d752.6610.6711.57.2-7.55.4
O8d753.0210.6711.57.2-7.55.4
O9d630.011.0811.53.6-7.917.7

Siphonic hydraulics — Area-02 (RWDP-02, 5 outlets, head 11.5 m)

PipeFromToQ L/sd (OD)L mΣKv m/sh_f m
T1O1N121.8d901.03.574.423.86
T2O2N221.8d751.02.06.374.91
T3O3N321.8d751.02.516.375.98
T4O4N421.8d751.02.816.376.59
T5O5N521.8d751.03.06.376.99
C1N1N221.8d1107.01.42.961.35
C2N2N343.6d1607.00.92.790.76
C3N3N465.4d2007.00.92.680.61
C4N4N587.2d2507.00.92.290.4
C5N5DP-top109.0d2503.50.92.860.5
DPDP-topDP-base109.0d20010.50.64.471.78
GRDP-baseDischarge109.0d2003.01.54.471.86

Balance — Area-02

OutletTailRestrictor ΔH mPath loss mAvailable mImbalance %p at downpipe top mTail v m/s
O1d901.5711.1311.53.2-7.54.4
O2d750.010.8311.55.9-7.26.4
O3d751.0711.1311.53.2-7.56.4
O4d751.6811.1311.53.2-7.56.4
O5d752.0811.1311.53.2-7.56.4

Siphonic hydraulics — Area-06 (RWDP-06, 4 outlets, head 11.5 m)

PipeFromToQ L/sd (OD)L mΣKv m/sh_f m
T1O1N119.6d751.02.05.723.97
T2O2N219.6d751.03.095.725.79
T3O3N319.6d751.03.615.726.65
T4O4N419.6d751.04.015.727.32
C1N1N219.6d11012.11.42.661.53
C2N2N339.2d16012.10.92.510.86
C3N3N458.8d20012.10.92.410.67
C4N4DP-top78.3d2506.10.92.050.3
DPDP-topDP-base78.3d20010.50.63.210.93
GRDP-baseDischarge78.3d1603.01.65.022.61

Balance — Area-06

OutletTailRestrictor ΔH mPath loss mAvailable mImbalance %p at downpipe top mTail v m/s
O1d750.010.8711.55.5-6.865.7
O2d751.8211.1511.53.0-7.155.7
O3d752.6811.1611.53.0-7.155.7
O4d753.3511.1611.53.0-7.155.7

Bill of quantities (preliminary)

ItemQtyUnit
HDPE pipe d63 (PE100, fusion welded, on rail bracket system)2m
HDPE pipe d75 (PE100, fusion welded, on rail bracket system)53m
HDPE pipe d90 (PE100, fusion welded, on rail bracket system)7m
HDPE pipe d110 (PE100, fusion welded, on rail bracket system)73m
HDPE pipe d125 (PE100, fusion welded, on rail bracket system)22m
HDPE pipe d160 (PE100, fusion welded, on rail bracket system)101m
HDPE pipe d200 (PE100, fusion welded, on rail bracket system)206m
HDPE pipe d250 (PE100, fusion welded, on rail bracket system)133m
HDPE pipe d315 (PE100, fusion welded, on rail bracket system)97m
Siphonic outlets 25 L/s with baffle, leaf guard, flange to gutter26nos
Emergency siphonic outlets34nos
Gutter 700 × 325 mm (rect) with brackets, expansion joints, stop ends88m
Gutter 700 × 325 mm (rect) with brackets, expansion joints, stop ends90m
Gutter 700 × 325 mm (rect) with brackets, expansion joints, stop ends48m
Overflow scuppers / emergency provisionas schedulednos
Discharge to storm drain / rainwater harvesting chamber1lot

5. Checks

CheckResultNote
Design intensity 150 mm/h (entered) — municipal / local minimum for Delhi NCR 100 mm/h, IMD 5-yr 5-min 284 mm/hPASSdesign value entered
Area-01: gutter capacity 56.6 L/s ≥ flow at the critical section 18.6 L/s (33 % used)PASSbox 700 × 325 mm, W = 250 mm, F_D 0.78, F_S 1.00, F_L 0.65 (L/W = 353)
Area-01: 9 siphonic outlets × 18.6 L/s ≤ 25 L/s listed, spacing 9.8 m ≤ 20 m, 1 downpipe(s) of 9 outletsPASScollector up to d315, downpipe d250, head 11.5 m, 167 L/s per downpipe
Area-01: siphonic balance — all paths within ±10 % of the available head, residual 0.42 mPASSO1 d75 +7 %; O2 d75 +7 %; O3 d75 +7 %; O4 d75 +7 %; O5 d75 +7 %; O6 d75 +7 %; O7 d75 +7 %; O8 d75 +7 %; O9 d63 +4 %
Area-01: velocities 1.5–4.4 m/s within 1–6; minimum pressure -7.9 m ≥ -8 mPASStop of downpipe governs; increase pipe sizes or reduce head if pressure fails
Area-02: gutter capacity 56.0 L/s ≥ flow at the critical section 21.8 L/s (39 % used)PASSbox 700 × 325 mm, W = 250 mm, F_D 0.78, F_S 1.00, F_L 0.64 (L/W = 362)
Area-02: 13 siphonic outlets × 21.8 L/s ≤ 25 L/s listed, spacing 7.0 m ≤ 20 m, 3 downpipe(s) of 5 outletsPASScollector up to d250, downpipe d200, head 11.5 m, 109 L/s per downpipe
Area-02: siphonic balance — all paths within ±10 % of the available head, residual 0.37 mPASSO1 d90 +3 %; O2 d75 +6 %; O3 d75 +3 %; O4 d75 +3 %; O5 d75 +3 %
Area-02: velocities 2.3–4.5 m/s within 1–6; minimum pressure -7.5 m ≥ -8 mPASStop of downpipe governs; increase pipe sizes or reduce head if pressure fails
Area-06: gutter capacity 70.6 L/s ≥ flow at the critical section 19.6 L/s (28 % used)PASSbox 700 × 325 mm, W = 250 mm, F_D 0.78, F_S 1.00, F_L 0.81 (L/W = 194)
Area-06: 4 siphonic outlets × 19.6 L/s ≤ 25 L/s listed, spacing 12.1 m ≤ 20 m, 1 downpipe(s) of 4 outletsPASScollector up to d250, downpipe d200, head 11.5 m, 78 L/s per downpipe
Area-06: siphonic balance — all paths within ±10 % of the available head, residual 0.34 mPASSO1 d75 +6 %; O2 d75 +3 %; O3 d75 +3 %; O4 d75 +3 %
Area-06: velocities 2.1–5.0 m/s within 1–6; minimum pressure -7.1 m ≥ -8 mPASStop of downpipe governs; increase pipe sizes or reduce head if pressure fails
Emergency system: duplicate siphonic system for 225 mm/h (793 L/s total)PASSBS 8490 / EN 12056-3 §7: an independent overflow is mandatory for siphonic and box-gutter systems; NBCS 2026 E2 4.5.11.6.10: flat roofs need an emergency drain (down take or spout), horizontal outlets 100 %, side gratings 50 % of flow

6. Review checklist

#Reviewer's itemThis designTypical comment on a submission
1Intensity basis150 mm/h (design value entered)state the IDF / return period; 150 mm/h without a source is not substantiated
2Catchment build-upplan + pitch + extended + walls per EN §4.2, per outlet tributarysheets that divide the whole roof by outlet count hide the pitch and wall additions
3F_D / F_S / F_L valuesinterpolated from Figures 5–6 and Table 6 at the actual W/T, S/T, L/W (shown)values read off the figure without stating the ratio cannot be checked
4Long-gutter factorL/W up to 362L/W > 500 is outside Table 6 — add outlets rather than extrapolate
5Freeboardstated per runEN rule 25 / 0.3 W / 75 mm
6Outlet capacitylisted siphonic capacity or weir / orifice checkoutlets are the usual bottleneck, not the gutter
7Siphonic hydraulicspipe-by-pipe losses, balance, minimum pressure, velocitiesthe supplier's calculation must show the same for every outlet path
8Emergency system100 % duplicate siphonicmandatory and independent for siphonic / box gutters

7. Worked examples — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Area-02 (RWDP-02) — catchment, design flow and outlets
the largest flow of the 3 gutter run(s)
Given: Rainfall r = 150 mm/h (design value entered), emergency 225 mm/h, C = 1 · Roof gutter run L = 90.4 m, depth B = 70.3 m, pitch 8° · Outlets 13 (entered)
1. Rise: h = B · tan α = 70.3 × tan 8° = 9.88 m
2. Pitched-roof addition: Apitch = Aplan · (h / 2) / B = 6354.5 × (9.88 / 2) / 70.3 = 446.5 m² (EN 12056-3 §4.2)
3. Effective catchment: AE = Aplan + Apitch + Aext + 0.5 · Awall = 6354.5 + 446.5 + 0.0 + 0.0 = 6801 m²
4. Design flow: Q = C · r · AE / 3600 = 1 × 150 × 6801.0 / 3600 = 283.4 L/s (engine 283.4 L/s)
5. Emergency flow: Qem = C · rem · AE / 3600 = 1 × 225 × 6801.0 / 3600 = 425.1 L/s
6. Flow per outlet: q = Q / n = 283.4 / 13 = 21.8 L/s (spacing 7.0 m)
Area-02 — gutter 700 × 325 mm (box) capacity
eaves gutter of rectangular / trapezoidal shape, Q_L = 0.9 × Q_N, Q_N = Q_SE × F_D × F_S, Q_SE = 3.48×10⁻⁵ · A_E^1.25 (EN 12056-3 5.1.4)
1. Design water depth: W = H − freeboard = 325 − 75 = 250 mm
2. Wetted section: A = (T + S) / 2 · W = (700 + 700) / 2 × 250 = 175 000 mm²
3. Smooth-gutter capacity Q_SE: 3.48×10⁻⁵ · A1.25 = 3.48×10⁻⁵ × 1750001.25 = 124.56 L/s (engine 124.56)
4. Depth factor: FD at W / T (Figure 5) = 250 / 700 = 0.357 = 0.78
5. Shape factor: FS at S / T (Figure 6) = 700 / 700 = 1.00 = 1
6. Nominal capacity: QN = QSE · FD · FS = 124.56 × 0.780 × 1.000 = 97.16 L/s
7. Non-half-round eaves gutter: QL = 0.9 · QN = 0.9 × 97.16 = 87.45 L/s
8. Long-gutter factor: FL at L / W (Table 6; 1.0 for L/W ≤ 50) = 90400 / 250 = 362 = 0.641
9. Gutter capacity: Q = QL · FL = 87.45 × 0.641 = 56 L/s (engine 56.0 L/s)
10. Critical section: qoutlet ≤ Qgutter → 21.8 ≤ 56.0 L/s (39 % used) PASS
Area-02 — siphonic system
3 downpipe(s) of 5 outlets each
1. Available head: H = eave height − discharge level = 12 − 0.5 = 11.5 m
2. Flow per downpipe: Qdp = ngroup · q = 5 × 21.80 = 109 L/s (collector up to d250, downpipe d200)
3. Minimum pressure: pmin ≥ -8.0 m → -7.50 m (top of the downpipe) PASS
4. Velocities: 1.0 ≤ v ≤ 6.0 m/s → 2.29 – 4.47 m/s PASS
5. Balance: all outlet paths within ±10 % of the head → max 6 %, residual 0.37 m PASS

Step summary — every gutter run

Intensity: design value entered; emergency 225 mm/h
Area-01: A_E = A_plan + plan·(h/2)/B + extended + 0.5·wall = 2926.4 + 205.6 + 879.1 + 0.0 = 4011.1 m² (h = 4.65 m); Q = C·r·A/3600 = 1 × 150 × 4011.1 / 3600 = 167.1 L/s; per outlet 167.1 / 9 = 18.6 L/s
Area-01 gutter: W = H − freeboard = 325 − 75 = 250 mm; A_E = 700 × 250 = 175000 mm²; Q_SE = 3.48×10⁻⁵ × 175000^1.25 = 124.56 L/s; × F_D 0.78 (W/T = 0.357) × F_S 1.00 (S/T = 1.00) = Q_N 97.16; × 0.9 = Q_L 87.45; L/W = 88300/250 = 353 → F_L 0.65 (Table 6) → capacity 56.6 L/s
Area-02: A_E = A_plan + plan·(h/2)/B + extended + 0.5·wall = 6354.5 + 446.5 + 0.0 + 0.0 = 6801.0 m² (h = 9.88 m); Q = C·r·A/3600 = 1 × 150 × 6801.0 / 3600 = 283.4 L/s; per outlet 283.4 / 13 = 21.8 L/s
Area-02 gutter: W = H − freeboard = 325 − 75 = 250 mm; A_E = 700 × 250 = 175000 mm²; Q_SE = 3.48×10⁻⁵ × 175000^1.25 = 124.56 L/s; × F_D 0.78 (W/T = 0.357) × F_S 1.00 (S/T = 1.00) = Q_N 97.16; × 0.9 = Q_L 87.45; L/W = 90400/250 = 362 → F_L 0.64 (Table 6) → capacity 56.0 L/s
Area-06: A_E = A_plan + plan·(h/2)/B + extended + 0.5·wall = 1756.8 + 123.5 + 0.0 + 0.0 = 1880.3 m² (h = 5.09 m); Q = C·r·A/3600 = 1 × 150 × 1880.3 / 3600 = 78.3 L/s; per outlet 78.3 / 4 = 19.6 L/s
Area-06 gutter: W = H − freeboard = 325 − 75 = 250 mm; A_E = 700 × 250 = 175000 mm²; Q_SE = 3.48×10⁻⁵ × 175000^1.25 = 124.56 L/s; × F_D 0.78 (W/T = 0.357) × F_S 1.00 (S/T = 1.00) = Q_N 97.16; × 0.9 = Q_L 87.45; L/W = 48500/250 = 194 → F_L 0.81 (Table 6) → capacity 70.6 L/s

8. Standards and references

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.