SCADA — I/O point summary

Sample project — Tower A · detailed profile · 15 % spare
Generated 18 Oct 2026 18:00
Equipment schedule → point templates → I/O summary, field devices, soft-integration composition
Project code SAMPLE
Systems
6
Units
55
Hardwired I/O
78
With 15 % spare
91
Soft points
1,060
Field devices
14
Alarm points
28

1. Basis

ItemValue
SystemSCADA
Template profiledetailed
Spare on hardwired points15 % per type, rounded up per system
ProtocolsBACnet/IP · BACnet MS/TP · Modbus RTU (RS-485)
Code regimeIndian — NBCS 2026 (SP 7:2026), which replaced NBC 2016 on 30 Apr 2026

2. System-wise summary (including spare)

SrSystemLocationQtyAIDIAODOSIHardwiredTotal incl. spare
1HT breaker (33 kV / 11 kV)Substation · GF · HT room401200801294
2Power / distribution transformerSubstation · GF · Transformer bay24120001619
3LT main ACB / bus coupler / capacitor sourceSubstation · GF · LT room602401212036162
4DG set with synchronising panelSubstation · GF · DG room26600601274
5Multi-function meter — LT panel feederSubstation · GF · LT room4000008000800
6SCADA PLC panel health monitoringSubstation · GF · SCADA room10200023
TOTAL5510560121060781151

3. I/O point summary

SrDescriptionQtyAIDIAODOSIMonCtlAlmRemarks
ELECTRICAL
1HT breaker (33 kV / 11 kV) Substation · GF · HT room480
iBreaker ON / OFF Status4●Potential Free Contact to SCADA from HT / LT Panel
iiBreaker Trip Status4●●Potential Free Contact to SCADA from HT / LT Panel
iiiBreaker Auto / Manual Status4●Potential Free Contact to SCADA from HT / LT Panel
ivProtocol integration (soft points)80●Modbus/BACnet Integration — MFM at 20 registers per breaker
2Power / distribution transformer Substation · GF · Transformer bay2
iTransformer HV / LV Breaker ON / OFF Status2●A transformer has no ON/OFF of its own — this is its incomer and outgoing breaker status. Potential Free Contact to SCADA from HT / LT Panel
iiTransformer Trip Status2●●Potential Free Contact to SCADA from HT / LT Panel
iiiWinding Temperature Alarm2●●Potential Free Contact to SCADA from HT / LT Panel
ivWinding Temperature Trip2●●Potential Free Contact to SCADA from HT / LT Panel
vOil Temperature Alarm2●●Potential Free Contact to SCADA from HT / LT Panel
viOil Temperature Trip2●●Potential Free Contact to SCADA from HT / LT Panel
viiWinding Temperature Value2●4-20 mA output from WTI. Previously only alarm and trip contacts — no trendable value.
viiiOil Temperature Value2●4-20 mA output from OTI. Previously only alarm and trip contacts — no trendable value.
3LT main ACB / bus coupler / capacitor source Substation · GF · LT room6120
iBreaker ON / OFF Command12●Potential Free Contact from SCADA to LT Panel. 2 DO per breaker (close and open), subject to the local/remote selector being in Remote. Scope of remote switchin
iiBreaker ON / OFF Status6●Potential Free Contact to SCADA from HT / LT Panel
iiiBreaker Trip Status6●●Potential Free Contact to SCADA from HT / LT Panel
ivBreaker Auto / Manual Status6●Potential Free Contact to SCADA from HT / LT Panel
vBreaker Spring Charged Status6●Potential Free Contact to SCADA from HT / LT Panel
viProtocol integration (soft points)120●Modbus/BACnet Integration — MFM at 20 registers per breaker
4DG set with synchronising panel Substation · GF · DG room260
iDG Internal and Outer Fuel Tank Low Level4●●Sensor & field wiring — flame proof level switch
iiDG Fuel Tank Continuous Level Measurement4●Level switches alone give no available run time. 4-20 mA transmitter on day and bulk tanks.
iiiDG Battery Under Voltage Fault2●●Sensor & field wiring — DC voltage transducer
ivDG Battery Voltage Value2●The DC voltage transducer is already provided; its analogue output was discarded and only a threshold contact was taken.
vProtocol integration (soft points)60●Modbus/BACnet Integration — 30 parameters per set: start/stop, sync panel status, auto/manual, on-load/off-load, low oil pressure warning and shutdown, hot wate
ENERGY AND METERING
5Multi-function meter — LT panel feeder Substation · GF · LT room40800
iProtocol integration (soft points)800●MOVED from the BMS I/O Summary and re-based at 20 registers per meter. The SCADA polls these meters once; the BMS reads a 5-parameter subset from the SCADA serv
SYSTEM HEALTH
6SCADA PLC panel health monitoring Substation · GF · SCADA room1
iPanel Door Open Status1●●
iiPanel Auxiliary Supply Healthy Status1●●PLC auxiliary supply is from the substation UPS / DC system; loss of it stops event recording.

4. Field device schedule

DeviceQuantityPrincipal application
Transformer WTI/OTI with 4-20 mA Output4Power / distribution transformer (4)
Flame Proof Level Switch4DG set with synchronising panel (4)
Fuel Level Transmitter4DG set with synchronising panel (4)
DC Voltage Transducer2DG set with synchronising panel (2)

5. Soft-integrated points

SubsystemUnitsSIPer unitNature
HT breaker (33 kV / 11 kV)48020Modbus/BACnet Integration — MFM at 20 registers per breaker
LT main ACB / bus coupler / capacitor source612020Modbus/BACnet Integration — MFM at 20 registers per breaker
DG set with synchronising panel26030Modbus/BACnet Integration — 30 parameters per set: start/stop, sync panel status, auto/manual, on-load/off-load, low oil pressure warning and shutdown, hot wate
Multi-function meter — LT panel feeder4080020MOVED from the BMS I/O Summary and re-based at 20 registers per meter. The SCADA polls these meters once; the BMS reads a 5-parameter subset from the SCADA serv

6. Panels and system architecture

Panels
5
Controllers
5
I/O modules
10
Channels used
78 / 128
NLC / trunks
1 / 1
Cable (est.)
2,520 m
PanelLocationTrunkCtrlDIDOAIAOModulesSpare ch.Equipment
RTU-GF-01Substation · floor GF · DG roomNLC-01/T116060212DG-01, DG-02
RTU-GF-02Substation · floor GF · HT roomNLC-01/T111200014HT-VCB-01, HT-VCB-02, HT-VCB-03, HT-VCB-04
RTU-GF-03Substation · floor GF · LT roomNLC-01/T11241200412LT-ACB-01, LT-ACB-02, LT-ACB-03, LT-ACB-04, LT-ACB-05, LT-ACB-06
RTU-GF-04Substation · floor GF · SCADA roomNLC-01/T112000114SCADA-PLC
RTU-GF-05Substation · floor GF · Transformer bayNLC-01/T111204028TR-01, TR-02
FLOOR GFRTU-GF-01DI 6 · DO 0 · AI 6 · AO 01 ctrl · 2 modDG-01, DG-02RTU-GF-02DI 12 · DO 0 · AI 0 · AO 01 ctrl · 1 modHT-VCB-01, HT-VCB-02, HT-VCB-03 +1RTU-GF-03DI 24 · DO 12 · AI 0 · AO 01 ctrl · 4 modLT-ACB-01, LT-ACB-02, LT-ACB-03 +3RTU-GF-04DI 2 · DO 0 · AI 0 · AO 01 ctrl · 1 modSCADA-PLCRTU-GF-05DI 12 · DO 0 · AI 4 · AO 01 ctrl · 2 modTR-01, TR-02SUBSTATIONNLC-01network controllerT1 BACnet MS/TPCORE SWITCH — BACnet/IPBMS SERVER (DUTY)BMS SERVER (HOT STANDBY)OPERATOR WS-1OPERATOR WS-2PRINTERWEB / MOBILE CLIENTSLEVEL 1 — MANAGEMENT (HEAD-END)LEVEL 2 — AUTOMATION NETWORKLEVEL 3 / 4 — FIELD CONTROLLERS AND FIELD DEVICESTHIRD-PARTY INTEGRATION (SOFT POINTS)HT breaker (33 kV / 11 kV)4 no · 80 pts · BACnet/IP or Modbus (vendoLT main ACB / bus coupler / capaci6 no · 120 pts · BACnet/IP or Modbus (vendoDG set with synchronising panel2 no · 60 pts · BACnet/IP or Modbus (vendoMulti-function meter — LT panel fe40 no · 800 pts · Modbus RTU (RS-485)Modbus RTU (RS-485) / BACnet gatewayBackbone BACnet/IP (Cat 6 / fibre)Controller network BACnet MS/TPThird-party Modbus RTU (RS-485)5 panels · 5 controllers · 10 I/O modules (78 used of 128 channels) · 1 NLC · 1 trunks · 4 integrationsBMS SYSTEM ARCHITECTURE — SAMPLE PROJECT — TOWER A

Bill of materials

ItemQtyNote
BMS server (head-end) with software licence2hot standby
Operator workstation with 2 × 24" monitors2
Core network switch (L3, managed)1
Network-level controller (NLC / supervisory)1BACnet/IP backbone
RTU / PLC panel enclosure IP545
DDC controller5≤ 256 points each
DI module, 16 channels6
DO module, 8 channels2
AI module, 8 channels2
Third-party integration (gateway / driver licence)4HT breaker (33 kV / 11 kV), LT main ACB / bus coupler / capacitor source, DG set with synchronising panel, Multi-function meter — LT panel feeder

7. Worked examples — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

System 3 — LT main ACB / bus coupler / capacitor source (LT-ACB)
the system with the most hardwired points in this schedule
Given: Quantity 6 units · Substation · GF · LT room · Spare 15 % per point type, rounded up per system
1. DI points: DI = Σ per-unit × qty + Σ per-system = (1 + 1 + 1 + 1) × 6 = 24
2. DO points: DO = Σ per-unit × qty + Σ per-system = (2) × 6 = 12
3. Hardwired total: AI + DI + AO + DO = 0 + 24 + 0 + 12 = 36
4. DI with spare: DI + ⌈DI × 15 %⌉ = 24 + ⌈3.60⌉ = 24 + 4 = 28
5. DO with spare: DO + ⌈DO × 15 %⌉ = 12 + ⌈1.80⌉ = 12 + 2 = 14
6. Total incl. spare: Σ (type + spare) + SI = 0 + 28 + 0 + 14 + 120 SI = 162 (soft points carry no spare)
Project totals with spare
spare applied once on the project total per type (rounded up)
1. AI: AI + ⌈AI × 15 %⌉ = 10 + ⌈1.50⌉ = 12
2. DI: DI + ⌈DI × 15 %⌉ = 56 + ⌈8.40⌉ = 65
3. DO: DO + ⌈DO × 15 %⌉ = 12 + ⌈1.80⌉ = 14
4. Hardwired incl. spare: Σ = 12 + 65 + 14 = 91 (78 without spare)
Panel RTU-GF-03 — Substation · floor GF · LT room
the most loaded controller panel of the architecture
Given: Equipment LT-ACB-01, LT-ACB-02, LT-ACB-03, LT-ACB-04, LT-ACB-05, LT-ACB-06 · Controller 256 points, 1 per panel
1. Raw points per panel (room for spare): Nmax = ⌊points/controller × controllers/panel / (1 + spare)⌋ = ⌊256 × 1 / 1.15⌋ = 222
2. Panel loading: N ≤ Nmax → 36 ≤ 222 PASS
3. DI modules: ⌈DI × (1 + spare) / 16 ch⌉ = ⌈24 × 1.15 / 16⌉ = ⌈1.72⌉ = 2 (32 channels, 8 spare = 33 %)
4. DO modules: ⌈DO × (1 + spare) / 8 ch⌉ = ⌈12 × 1.15 / 8⌉ = ⌈1.72⌉ = 2 (16 channels, 4 spare = 33 %)
5. Controllers: ⌈Σ channels / points per controller⌉ = ⌈48 / 256⌉ = 1
6. Spare channels: spare ≥ 15 % per type → DI 8/24, DO 4/12 PASS

8. Codes and standards

Indian code edition: NBCS 2026 (SP 7:2026) — National Building Construction Standards (replaced NBC 2016 on 30 Apr 2026).

NBCS 2026 clausePDF pageGoverns
Part D Sec 2 cl. 4.21671–Substation and switch rooms — HV, transformer and LV switchgear monitored by the SCADA
Part D Sec 2 cl. 4.2.1 (jj)1674–1675Fire and life-safety loads on normal + standby supply with changeover
Part D Sec 2 cl. 4.3–4.51680–1681DG sets; battery storage with gas monitoring; multiple sources — synchronisation and priority
Part D Sec 2 cl. 4.81682Substation safety
Part D Sec 2 cl. 10.4.21748Integration of substation, renewable and standby generation with the BMS
StandardTitleUsed for
ISO 16484 (Parts 1–6)Building automation and control systemsSystem design, hardware, functions, data communication (BACnet) for the BMS
ASHRAE Standard 135 / ISO 16484-5 (BACnet)Data communication protocol for building automation and control networksBackbone and controller network protocol
ASHRAE Guideline 36High-performance sequences of operation for HVAC systemsControl narratives for AHUs, plants and zones
ASHRAE Guideline 13Specifying building automation systemsPoint classification, spare capacity, graphics and alarm philosophy
Modbus Application Protocol V1.1b3 / Serial Line V1.02Modbus protocol specificationsThird-party integration of drives, meters, chillers, UPS and plant PLCs
IEC 61131-2 / -3Programmable controllers — equipment requirements and programming languagesPLC panels for tunnel / car-park ventilation, lighting and electrical SCADA
IEC 61439-1/2:2020 / IS/IEC 61439Low-voltage switchgear and controlgear assembliesPanel construction (TTA/PTTA), busbar short-time withstand (Icw 1 s), temperature rise, IP rating
IEC 62443 (series)Security for industrial automation and control systemsZones and conduits, user management, hardening of the automation network
IEC 61850Communication networks and systems for power utility automationSubstation SCADA — relays, IEDs, GOOSE / MMS
IEC 60870-5-104Telecontrol equipment and systems — network accessElectrical SCADA telecontrol over TCP/IP
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
NBCS 2026 (SP 7:2026) Part D Sec 3National Building Construction Standards — Air conditioning, heating and mechanical ventilationDesign conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation
NBCS 2026 (SP 7:2026) Part D Sec 5National Building Construction Standards — Lifts, escalators, moving walks and power-driven parkingLift traffic, fire-fighting lifts, controls
NBCS 2026 (SP 7:2026) Part D Sec 6National Building Construction Standards — Information and communication enabled installationsStructured cabling, Wi-Fi (IEEE 802.11ax/be), ICT spaces
NBCS 2026 (SP 7:2026) Part FNational Building Construction Standards — Fire and life safetyMeans of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
CEA (Measures relating to Safety and Electric Supply) Regulations, 2023Central Electricity Authority safety regulationsStatutory safety requirements for installations
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IS 3043:2018Code of practice for earthingEarth bus, strip sizing, earthing of panels (future earthing tool)
CPWD General Specifications for Electrical Works Part VI (BMS)Building management system specificationPanels, cabling, controllers and head end for CPWD works
Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.