SAMPLESeptic tank · soak pit · grease trap (IS 2470) — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
Septic tank · soak pit · grease trap (IS 2470)
Sample project — Tower A · Plumbing / PHE
Generated 28 Nov 2026 16:09 Septic tank liquid and sludge volume with dimensions per IS 2470-1 and the NBCS 2026 Part … Project code SAMPLE
Septic tank
7.5 m³
Size
3.9×1.3×1.8 m
Soak area
180.0 m²
Grease trap
1500 L
Users ≤ 300
yes
1. Inputs
Group
Input
Value
Unit
Septic tank
Number of users (contributory population)
50
Septic tank
Sewage flow per user (WC only 40 L; all wastes 90–120 L)
90
L/day
Septic tank
Detention time
24
h
Septic tank
Desludging interval
2
years
Septic tank
Liquid depth
1.5
m
Septic tank
Operating (coldest-month sewage) temperature
20
°C
Soak pit / trench
Percolation rate (time for 25 mm drop)
15
min
Soak pit / trench
Disposal
Soak pit
Soak pit / trench
Soak pit diameter
1.5
m
Grease trap
Meals per peak hour (0 = use fixtures)
150
Grease trap
Kitchen sinks / dishwashers connected
4
Grease trap
Retention time
30
min
2. Results
IS 2470 design
Item
Value
Unit
Note / basis
Sewage flow
4.5
m³/day
Liquid volume (24 h detention)
4.5
m³
Sludge + scum storage (30 L/person/yr × 2 yr)
3.0
m³
Temperature factor (operation at 20 °C)
1.0
NBCS E2 4.5.14.5.2: × 2 at 10 °C vs 20 °C
Tank capacity
7.5
m³
Dimensions (L : B ≈ 3 : 1)
3.87 × 1.29 m, liquid depth 1.5 m, overall depth 1.8 m
Compartments
two (2:1) with baffles; inlet/outlet tees; vent pipe
Contributory population
50.0
users
NBCS E2 4.5.14.5.2: ≤ 300 for septic tanks
Percolation rate
15.0
min/25 mm
allowable loading 25 L/m²/day
Effluent to dispose
4.5
m³/day
Disposal
soak pit Ø1.5 m × 38.2 m deep (side-wall area 180.0 m²)
Grease trap flow
40.0
L/min
Grease trap capacity (30 min retention)
1500
L
IS 2470-1 Table 1 (guide)
Users
L × B × depth m
m³
5
1.5 × 0.75 × 1.0
1.1
10
2.0 × 0.9 × 1.0
1.8
15
2.0 × 0.9 × 1.3
2.3
20
2.3 × 1.1 × 1.3
3.3
50
4.0 × 1.4 × 1.3
7.3
100
5.0 × 2.0 × 1.4
14.0
3. Checks
Check
Result
Note
Contributory population 50 ≤ 300 for a septic tank
PASS
NBCS 2026 Part E Sec 2 4.5.14.5.2
Percolation suitable for soak pit (≤ 30 min)
PASS
IS 2470-2
4. Worked example
Worked from this project’s own inputs and results — each value can be traced to the schedules above.
Septic tank for 50 users
IS 2470-1 volumes with the NBCS 2026 Part E Sec 2 limits
Given: Inputs 90 L/user/day, detention 24 h, desludging every 2 yr, liquid depth 1.5 m, 20 °C
IS 2470-1: minimum liquid depth 1 m, free board 0.3 m, length 2–4 × breadth; desludge every 2–3 years. NBCS 2026 Part E Sec 2 4.4.3.7 refers septic-tank design to IS 2470 [E-2(10)].
Septic tanks only for contributory population ≤ 300 (NBCS 2026 Part E Sec 2 4.5.14.5.2); above that a packaged STP (PSTP, IS 18797:2024 — 4.13.3 (j)) or an STP.
Alternatives / products named by NBCS 2026 Part E Sec 2 4.13.3: biodigester IS 18150:2023 (k), precast concrete septic tank IS 9872:1981 and rotationally moulded polyethylene septic tank IS 18666:2024 (m).
Cold regions (4.5.14.5.2): capacity + 100 % at 10 °C vs 20 °C, tank below the frost line, manholes marked and fenced; seepage pits discharge below the frost line (4.5.14.5.3).
6. Standards and references
CPHEEO Manual on Sewerage and Sewage Treatment Systems (2013), Part A — Engineering — design of sewers (flows, peak factors, Manning, velocities, d/D, cover, manholes): Sewer network design rules (India)
IS 2470 (Parts 1 & 2):1985 — Code of practice for installation of septic tanks: Septic tank capacity, soak pit and dispersion trench
NBCS 2026 (SP 7:2026) Part E Sec 2 — National Building Construction Standards — Drainage and sanitation: Sanitary fixtures by occupancy (Tables 1–17), DFU, stacks, vents, building drains, rainwater pipes (Table 25)
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.