Sewer network — hydraulic design report

Sample project — Tower A · India — CPHEEO Manual on Sewerage & Sewage Treatment (2013)
Generated 28 Nov 2026 16:09
Manning partial-flow method · gravity network
Project code SAMPLE
Manholes
23
Pipes
22
Total length
520.5 m
Population
2,500
Peak flow at outfall
9.38 L/s
Max depth
3.11 m
Checks failing
0

1. Design criteria

CriterionValueReference
Code regimeIndia
StandardIndia — CPHEEO Manual on Sewerage & Sewage Treatment (2013)
Design modeDesign & Build — sections, slopes and inverts chosen by the engine
Profile controlUpstream (shallowest network from the head manholes; outfall level free)
Population (dwellings)by bedrooms: 1/2/3/4+ BHK = 3/4/5/6 persons (EWS 4, studio 2; 3 BHK = 5 when not given) or persons per unit enteredNBCS 2026 Part E Sec 1 cl. 4.1 (population: 1/2/3/4+ BHK = 3/4/5/6 persons), cl. 4.1.1 (135 lpcd), Table 1 (other occupancies); CPHEEO 2013 Table 3.1
Per-capita water supply135 lpcd (buildings may override)
Sewage return80 %
Peak factorcpheeo_tableCPHEEO 2013 Part A cl. 3.5.2, Table 3.3
Infiltration0 m³/ha/d + 0 m³/km/dCPHEEO 2013 cl. 3.4
Minimum velocity0.6 m/s (ultimate ≥ 0.8 m/s)CPHEEO 2013 cl. 3.9 (0.6 m/s at design peak; 0.8 m/s preferred at ultimate)
Maximum velocity3.0 m/s (pipes; linings per table)CPHEEO 2013 cl. 3.9
Fill limit (pipes)≤ 0.5 up to 400 mm, ≤ 0.66 up to 900 mm, ≤ 0.75 up to 10000 mmCPHEEO 2013 Table 3.4 (ultimate peak flow)
Minimum diameter150 mmCPHEEO 2013 cl. 3.8
Minimum cover1.0 m (road) / 0.9 m (other)CPHEEO 2013 cl. 3.12 / IS 4111
Manhole spacing30 m up to 300 mm, 45 m up to 600 mm, 75 m up to 900 mm, 90 m up to 1500 mm, 120 m up to 10000 mmCPHEEO 2013 cl. 3.14
Drop manholeincoming invert > 0.6 m above outgoingCPHEEO 2013 cl. 3.14.3 / IS 4111 Pt 1
Soffit matching at size changecrownCPHEEO 2013 cl. 3.15 (match soffits at change of size)
Pipe material / nRCC NP3 (IS 458) · n = 0.013CPHEEO 2013 Table 3.5 (Manning n)
Design horizon30 years · ultimate = entered × 1.0 · initial = 100.0 % of ultimateCPHEEO 2013 cl. 2.3

2. Contributing loads

BuildingTypeUnits / beds / seatsPopulationLPCDReturn %Connected to (share)
TOWER Aresidential10013580B-1 (100 %)
TOWER Bresidential10013580B-1 (100 %)
CLUB HOUSEresidential10013580B-1 (100 %)
TOWER Cresidential10013580B-1 (100 %)
TOWER Dresidential10013580B-1 (100 %)

Population and per-capita values from the occupancy table unless entered; loads are split between manholes by the shares shown. Point loads are listed in the Excel schedule.

3. Manhole schedule

MHTypeGL (m)IL in (m)IL out (m)Depth (m)Drop (m)Population at MHQ avg (L/s)Remarks
A-1MH243.398—242.2231.18—00.000—
A-2MH243.570242.102242.1021.47—00.000—
A-3MH243.743241.981241.9811.76—00.000—
A-4MH243.856241.859241.8592.00—00.000—
A-5DROP243.969242.794, 241.738241.7382.231.0600.000—
A-6MH244.055241.629241.6292.43—00.000—
A-7MH244.141241.520241.5202.62—00.000—
A-8MH244.257241.418241.4182.84—00.000—
A-9DROP244.374243.108, 241.317241.2673.111.8400.000—
A-10MH244.273241.166241.1663.11—00.000—
A-11MH244.172241.065241.0653.11—00.000—
A-12MH244.065240.958240.9583.11—00.000—
A-13MH243.957240.850240.8503.11—00.000—
A-14MH243.867240.760240.7603.11—00.000—
A-15OUTFALL243.777240.670240.6703.11—00.000—
B-1MH244.947—243.7171.23—25003.125—
B-2MH244.791243.561243.5611.23—00.000—
B-3MH244.635243.405243.4051.23—00.000—
B-4MH244.513243.283243.2831.23—00.000—
B-5MH244.391243.161243.1611.23—00.000—
C-1MH244.320—243.1451.18—00.000—
C-2MH244.203243.028243.0281.18—00.000—
C-3MH244.086242.911242.9111.18—00.000—

4. Pipe design

PipeL mPop.Q avg L/sPFQ peak init L/sQ peak ult L/sSectionSlopeGroundQ full L/sV full m/sFill (limit)V m/sV init m/sIL upIL dnCover up / dn mStatus
A-1 → A-225.000.0002.000.0000.000Ø1501 in 206-0.69 %10.600.600.00 / 0.500.000.00242.223242.1021.00 / 1.29PASS
A-2 → A-325.000.0002.000.0000.000Ø1501 in 206-0.69 %10.600.600.00 / 0.500.000.00242.102241.9811.29 / 1.59PASS
A-3 → A-425.000.0002.000.0000.000Ø1501 in 206-0.45 %10.600.600.00 / 0.500.000.00241.981241.8591.59 / 1.82PASS
A-4 → A-525.000.0002.000.0000.000Ø1501 in 206-0.45 %10.600.600.00 / 0.500.000.00241.859241.7381.82 / 2.06PASS
C-1 → C-221.200.0002.000.0000.000Ø1501 in 1810.55 %11.320.640.00 / 0.500.000.00243.145243.0281.00 / 1.00PASS
C-2 → C-321.200.0002.000.0000.000Ø1501 in 1810.55 %11.320.640.00 / 0.500.000.00243.028242.9111.00 / 1.00PASS
C-3 → A-521.200.0002.000.0000.000Ø1501 in 1810.55 %11.320.640.00 / 0.500.000.00242.911242.7941.00 / 1.00PASS
A-5 → A-622.500.0002.000.0000.000Ø1501 in 206-0.38 %10.600.600.00 / 0.500.000.00241.738241.6292.06 / 2.25PASS
A-6 → A-722.500.0002.000.0000.000Ø1501 in 206-0.38 %10.600.600.00 / 0.500.000.00241.629241.5202.25 / 2.45PASS
A-7 → A-821.000.0002.000.0000.000Ø1501 in 206-0.55 %10.600.600.00 / 0.500.000.00241.520241.4182.45 / 2.66PASS
A-8 → A-921.000.0002.000.0000.000Ø1501 in 206-0.56 %10.600.600.00 / 0.500.000.00241.418241.3172.66 / 2.88PASS
B-1 → B-230.025003.1253.009.3759.375Ø2001 in 1920.52 %23.650.750.44 / 0.500.710.71243.717243.5611.00 / 1.00PASS
V below preferred ultimate velocity (warning)
B-2 → B-330.025003.1253.009.3759.375Ø2001 in 1920.52 %23.650.750.44 / 0.500.710.71243.561243.4051.00 / 1.00PASS
V below preferred ultimate velocity (warning)
B-3 → B-430.025003.1253.009.3759.375Ø2001 in 2460.41 %20.920.670.47 / 0.500.650.65243.405243.2831.00 / 1.00PASS
V below preferred ultimate velocity (warning)
B-4 → B-530.025003.1253.009.3759.375Ø2001 in 2460.41 %20.920.670.47 / 0.500.650.65243.283243.1611.00 / 1.00PASS
V below preferred ultimate velocity (warning)
B-5 → A-916.025003.1253.009.3759.375Ø2001 in 3020.11 %18.880.600.50 / 0.500.600.60243.161243.1081.00 / 1.04PASS
V below preferred ultimate velocity (warning)
A-9 → A-1022.025003.1253.009.3759.375Ø2001 in 2180.46 %22.220.710.45 / 0.500.680.68241.267241.1662.88 / 2.88PASS
V below preferred ultimate velocity (warning)
A-10 → A-1122.025003.1253.009.3759.375Ø2001 in 2180.46 %22.220.710.45 / 0.500.680.68241.166241.0652.88 / 2.88PASS
V below preferred ultimate velocity (warning)
A-11 → A-1225.025003.1253.009.3759.375Ø2001 in 2340.43 %21.460.680.46 / 0.500.660.66241.065240.9582.88 / 2.88PASS
V below preferred ultimate velocity (warning)
A-12 → A-1325.025003.1253.009.3759.375Ø2001 in 2310.43 %21.560.690.46 / 0.500.660.66240.958240.8502.88 / 2.88PASS
V below preferred ultimate velocity (warning)
A-13 → A-1420.025003.1253.009.3759.375Ø2001 in 2220.45 %22.000.700.46 / 0.500.670.67240.850240.7602.88 / 2.88PASS
V below preferred ultimate velocity (warning)
A-14 → A-1520.025003.1253.009.3759.375Ø2001 in 2220.45 %22.000.700.46 / 0.500.670.67240.760240.6702.88 / 2.88PASS
V below preferred ultimate velocity (warning)
Partial-flow diagram — circular pipe (Manning): q/Q_full and v/V_full vs d/D, with the design point of every pipe0.00.10.20.30.40.50.60.70.80.91.01.11.20.00.10.20.30.40.50.60.70.80.91.0ratio to full-bore value (q/Q_full, v/V_full)↑ d/D (depth of flow / diameter)fill limit 0.5B-1 → B-2: q/Q 0.396, d/D 0.44B-2 → B-3: q/Q 0.396, d/D 0.44B-3 → B-4: q/Q 0.448, d/D 0.47B-4 → B-5: q/Q 0.448, d/D 0.47B-5 → A-9: q/Q 0.497, d/D 0.50A-9 → A-10: q/Q 0.422, d/D 0.45A-10 → A-11: q/Q 0.422, d/D 0.45A-11 → A-12: q/Q 0.437, d/D 0.46A-12 → A-13: q/Q 0.435, d/D 0.46A-13 → A-14: q/Q 0.426, d/D 0.46A-14 → A-15: q/Q 0.426, d/D 0.46A-14 → A-15: q/Q 0.426 → d/D 0.46q/Q_full (discharge)v/V_full (velocity)design point of each pipe (11)its velocity ratio at that depthpipe of the worked examplefill limit by diameterPeak discharge ≈ 1.08 Q_full at d/D ≈ 0.94;velocity ≈ V_full at half depth, max ≈ 1.14 V_fullat d/D ≈ 0.81 — hence V ≥ V_min is checked atthe actual partial depth, not at full bore.

5. Longitudinal sections

Longitudinal section — branch A (A-1 → A-15) · vertical exaggeration 10ר150 RCC · 1 in 206 · 25.0 mØ150 RCC · 1 in 206 · 25.0 mØ150 RCC · 1 in 206 · 25.0 mØ150 RCC · 1 in 206 · 25.0 mØ150 RCC · 1 in 206 · 22.5 mØ150 RCC · 1 in 206 · 22.5 mØ150 RCC · 1 in 206 · 21.0 mØ150 RCC · 1 in 206 · 21.0 mØ200 RCC · 1 in 218 · 22.0 mØ200 RCC · 1 in 218 · 22.0 mØ200 RCC · 1 in 234 · 25.0 mØ200 RCC · 1 in 231 · 25.0 mØ200 RCC · 1 in 222 · 20.0 mØ200 RCC · 1 in 222 · 20.0 mA-1A-2A-3A-4A-5 (DROP)A-6A-7A-8A-9 (DROP)A-10A-11A-12A-13A-14A-15Chainage (m)0.025.050.075.0100.0122.5145.0166.0187.0209.0231.0256.0281.0301.0321.0Ground level243.40243.57243.74243.86243.97244.06244.14244.26244.37244.27244.17244.06243.96243.87243.78Invert level242.22242.10241.98241.86241.74241.63241.52241.42241.27241.17241.06240.96240.85240.76240.67Depth (m)1.171.471.762.002.232.432.622.843.113.113.113.113.113.113.11ManholeA-1A-2A-3A-4A-5A-6A-7A-8A-9A-10A-11A-12A-13A-14A-15PipeØ150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø150 · 1 in 206 · V 0.00 m/s · fill 0.00Ø200 · 1 in 218 · V 0.68 m/s · fill 0.45Ø200 · 1 in 218 · V 0.68 m/s · fill 0.45Ø200 · 1 in 234 · V 0.66 m/s · fill 0.46Ø200 · 1 in 231 · V 0.66 m/s · fill 0.46Ø200 · 1 in 222 · V 0.67 m/s · fill 0.46Ø200 · 1 in 222 · V 0.67 m/s · fill 0.46Datum 239.67 m
Longitudinal section — branch B (B-1 → A-9) · vertical exaggeration 10ר200 RCC · 1 in 192 · 30.0 mØ200 RCC · 1 in 192 · 30.0 mØ200 RCC · 1 in 246 · 30.0 mØ200 RCC · 1 in 246 · 30.0 mØ200 RCC · 1 in 302 · 16.0 mB-1B-2B-3B-4B-5A-9 (DROP)Chainage (m)0.030.060.090.0120.0136.0Ground level244.95244.79244.63244.51244.39244.37Invert level243.72243.56243.41243.28243.16243.11Depth (m)1.231.231.231.231.231.27ManholeB-1B-2B-3B-4B-5A-9PipeØ200 · 1 in 192 · V 0.71 m/s · fill 0.44Ø200 · 1 in 192 · V 0.71 m/s · fill 0.44Ø200 · 1 in 246 · V 0.65 m/s · fill 0.47Ø200 · 1 in 246 · V 0.65 m/s · fill 0.47Ø200 · 1 in 302 · V 0.60 m/s · fill 0.50Datum 242.11 m
Longitudinal section — branch C (C-1 → A-5) · vertical exaggeration 10ר150 RCC · 1 in 181 · 21.2 mØ150 RCC · 1 in 181 · 21.2 mØ150 RCC · 1 in 181 · 21.2 mC-1C-2C-3A-5 (DROP)Chainage (m)0.021.242.463.5Ground level244.32244.20244.09243.97Invert level243.15243.03242.91242.79Depth (m)1.171.181.181.17ManholeC-1C-2C-3A-5PipeØ150 · 1 in 181 · V 0.00 m/s · fill 0.00Ø150 · 1 in 181 · V 0.00 m/s · fill 0.00Ø150 · 1 in 181 · V 0.00 m/s · fill 0.00Datum 241.79 m

6. Worked example

Worked from this network’s own inputs and results — the values can be traced to the pipe schedule (section 4).

Pipe A-14 → A-15 — design sewage flow
largest-flow pipe of the network (outfall reach); population is the ultimate population draining through it
Given: population P 2,500 · water supply 135 lpcd · sewage return 80 % · peak factor CPHEEO population table (CPHEEO 2013 Part A cl. 3.5.2, Table 3.3)
1. Average flow: Qavg = P × LPCD × return / 86 400 = 2,500 × 135 × 0.8 / 86 400 = 3.125 L/s
2. Peak factor: PF from the population table = P = 2,500 (P ≤ 20,000) = 3.00
3. Peak design flow: Qpeak = PF·Qavg + Qinf + Qpoint = 3.00 × 3.125 + 0.000 + 0.000 = 9.375 L/s
Pipe A-14 → A-15 — Manning at the adopted size and slope
partial-flow depth and velocity for the peak flow, then the self-cleansing and fill checks
Given: section Ø200 RCC · n 0.013 · S 1 in 222 (0.00450) · Q 9.375 L/s
1. Full-bore velocity: Vf = (1/n)·(D/4)2/3·S1/2 = (1/0.013) × (0.2/4)2/3 × 0.004500.5 = 0.7 m/s
2. Full-bore capacity: Qf = (π·D²/4)·Vf = 0.03142 × 0.700 × 1000 = 22 L/s
3. Flow ratio: q/Qf = 9.375 / 22.00 = 0.426 (read on the partial-flow diagram above)
4. Normal depth (θ solved): Q = A(θ)·(1/n)·R(θ)2/3·S1/2, d/D = (1 − cos θ/2)/2 = θ = 2.965 rad = 0.456 (d = 91 mm, A = 0.01394 m², R = 0.0470 m)
5. Velocity at that depth: V = Q / A(θ) = 0.00937 / 0.01394 = 0.672 m/s
6. Self-cleansing gradient: S ≥ Smin = (Vmin·n / (D/4)2/3)² → 1 in 222 vs 1 in 303 PASS
7. Fill at peak flow: d/D ≤ limit → 0.46 ≤ 0.5 PASS
8. Self-cleansing velocity at peak: V ≥ Vmin → 0.67 ≥ 0.6 m/s PASS (CPHEEO 2013 cl. 3.9 (0.6 m/s at design peak; 0.8 m/s preferred at ultimate))
9. Preferred ultimate velocity: V ≥ Vmin,ult → 0.67 ≥ 0.8 m/s CHECK (warning only — flush the line or steepen where possible)
10. At the initial flow: Vinit ≥ Vmin → 0.67 ≥ 0.6 m/s PASS
11. Scour: V, Vf ≤ Vmax → 0.67, 0.70 ≤ 3.0 m/s PASS
Pipe A-14 → A-15 — inverts, depth and cover
upstream invert from the cover rule and the incoming inverts, downstream invert by the adopted slope
Given: L 20.0 m · H (section) 0.200 m · wall t 30 mm
1. Upstream invert: ILup = min(GL − cover − H − t, incoming inverts matched) = min(243.867 − 1.0 − 0.200 − 0.030, incoming) = 240.760 m (deeper than the cover rule: incoming invert / drop)
2. Downstream invert: ILdn = ILup − S·L = 240.760 − 0.00450 × 20.0 = 240.670 m
3. Cover: cover ≥ minimum → 2.88 / 2.88 m ≥ 1.0 m PASS (CPHEEO 2013 cl. 3.12 / IS 4111)
4. Depth: depth ≤ maximum → 3.11 / 3.11 m ≤ 6.0 m PASS

7. Bill of quantities (indicative)

SectionMaterialDepth bandLength (m)
Ø150RCC0–1.5 m88.5
Ø150RCC1.5–3.0 m162.0
Ø200RCC0–1.5 m136.0
Ø200RCC3.0–4.5 m134.0
Manhole typeDepth bandNos.
drop1.5–3.0 m1
drop3.0–4.5 m1
mh0–1.5 m10
mh1.5–3.0 m5
mh3.0–4.5 m5
outfall3.0–4.5 m1

Excavation ≈ 824.4 m³ (trench width D + 0.6 m × average depth). Add bedding, backfill, road reinstatement, house connections and STP/pumping as per the project BOQ.

8. Formulae applied (with clauses)

QuantityFormulaReference
Average dry-weather flowQ_avg = P · LPCD · (return %) / 86 400 [L/s]CPHEEO 2013 cl. 3.2–3.4
Peak flowQ_peak = PF · Q_avg + Q_infiltration + Q_pointCPHEEO Table 3.3 (PF by population)
Manning (full pipe)V = (1/n) · R^(2/3) · S^(1/2) ; Q_full = A · V, R = D/4CPHEEO 2013 cl. 3.7 (Manning)
Partial flow (hydraulic elements)A = D²/8·(θ − sin θ), P = D·θ/2, R = A/P, d/D = (1 − cos(θ/2))/2 ; θ solved by bisection for QCPHEEO 2013 Fig. 3.1 / Appendix A
Box drain (rectangular)A = B·y, P = B + 2y, R = A/P ; normal depth y for Q by bisection ; design depth = D − freeboardCPHEEO SWD 2019 cl. 6.3–6.4
Trapezoidal channelA = (b + z·y)·y, P = b + 2y√(1+z²), T = b + 2zy ; normal depth for Q ; V ≤ permissible velocity of the liningIS 10430; CPHEEO SWD 2019 Table 6.2
Minimum slopeS_min = (V_min · n / R^(2/3))² at design fill ; S = max(S_min, ground slope) ≤ S(V_max)CPHEEO 2013 cl. 3.9–3.10 (self-cleansing)
Invert & coverIL_up = GL_up − cover − H − t_wall (max) ; IL_dn = IL_up − S·L ; cover = GL − IL − H − t_wallCPHEEO 2013 cl. 3.12; IS 4111 Pt 1
Junction & size changeIL_out = min(IL_in) ; at increase in size: soffit_out = soffit_in ; drop MH when IL_in − IL_out > 0.6 mCPHEEO 2013 cl. 3.14–3.15
Fixed outfall leveloutfall control: IL_dn(outfall reach) = IL_fixed ; upstream inverts raised with soffit matching until cover governs ; natural IL above IL_fixed → drop at outfallCPHEEO 2013 cl. 3.15 / SWD 2019 cl. 6.6 (outfall)
Storm inflow (storm mode)Q = C · i · A / 360 [m³/s, A ha, i mm/h] ; i = a / (Tc + b)^n ; Tc = t_inlet + Σ L/VCPHEEO SWD 2019 cl. 4–5
IDF from annual maximaGumbel: P24_T = P̄ + K_T·σ, K_T = −(√6/π)(0.5772 + ln ln(T/(T−1))) ; P_t = P24 (t/24)^(1/3) ; i = P_t/t ; a, b, n by least squaresCPHEEO SWD 2019 cl. 5.3 (frequency analysis); IMD short-duration reduction (t/24)^(1/3)

9. Standards and references

Prepared by
Checked by
Approved by