SAMPLESprinkler hydraulic calc sheet — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
Sprinkler hydraulic calculation
Sample project — Tower A · Indian regime · India · Ordinary hazard (OH) — was OH-II in IS 15105:2002
Generated 28 Nov 2026 16:09 Node-to-node calculation of the remote area of operation Project code SAMPLE
Sprinkler demand
2723 L/min
At connection
5.47 bar
Total incl. hose
2723 L/min
Required (+margin)
6.02 bar
Supply available
7.01 bar
Heads in area
30
1. Design criteria
Item
Value
Basis
Standard
India
India — NBCS 2026 (SP 7:2026) Part F · IS 15105:2021 · IS 3844:1989 · IS 13039:2014 · TAC
Hazard classification
Ordinary hazard (OH) — was OH-II in IS 15105:2002
IS 15105:2021 cl. 8.1.2 (5 L/min/m² over 360 m² — one OH class), 9.17 (12 m²/head, 4.5 m), 10.5.7 (≥ 0.5 bar), Table 1 (K80/115), Table 30 (60 min)
Design density
5.0 mm/min
code table
Area of operation
360 m²
code table / project
Sprinkler K-factor
K 80 (L/min/√bar)
project
Minimum head pressure
0.5 bar
code
Coverage per head
12.0 m² (3.46 m spacing)
≤ max area per head
Heads in the area of operation
30 (5 branch lines × up to 7)
area ÷ coverage
Required flow at the remote head
60.0 L/min
greater of density × coverage and K√Pmin
Pipe material / C
MS · C = 120
Hazen–Williams
Fittings
equivalent length table
IS 15105 / TAC
Velocity limit
6.0 m/s
project
Hose allowance
inside 0 + outside 0 L/min
code table
Duration
60 min
code table
Safety margin on pressure
10 %
project
Maximum system pressure
8.24 bar at no flow (limit 12 bar)
NBCS 2026 Part F cl. 5.1.3 (f) — above 12 bar high-pressure sprinklers
2. Water supply
Supply
Available at the total demand
Result
Fire pump 2850 L/min @ 70 m (listed shape: 120 % shut-off, 65 % at 150 %)
7.01 bar at 2723 L/min
PASS surplus 1 bar
3. Design-area schematic
★ = hydraulically most remote head. Flows and pressures from the balanced solution — every head discharges K√P.
4. Hydraulic calculation sheet (node to node)
Node 1
Node 2
Elev 1 m
Elev 2 m
K
q added L/min
Q total L/min
Nom. mm
ID mm
Fittings
Eq. len m
Pipe m
Total m
C
Pf/m bar
Pf bar
Pe bar
Pt node 1
Pt node 2
H1-7
H1-6
14.0
14.0
80.0
64.2
64.2
25
25.0
—
0.0
3.46
3.46
120.0
0.0294
0.102
0.0
0.644
0.747
H1-6
H1-5
14.0
14.0
80.0
69.1
133.3
25
25.0
—
0.0
3.46
3.46
120.0
0.114
0.395
0.0
0.747
1.142
H1-5
H1-4
14.0
14.0
80.0
85.5
218.8
32
32.0
—
0.0
3.46
3.46
120.0
0.0857
0.297
0.0
1.142
1.439
H1-4
H1-3
14.0
14.0
80.0
96.0
314.8
40
40.0
—
0.0
3.46
3.46
120.0
0.0569
0.197
0.0
1.439
1.636
H1-3
H1-2
14.0
14.0
80.0
102.3
417.2
40
40.0
—
0.0
3.46
3.46
120.0
0.0956
0.331
0.0
1.636
1.967
H1-2
H1-1
14.0
14.0
80.0
112.2
529.4
50
50.0
—
0.0
3.46
3.46
120.0
0.0502
0.174
0.0
1.967
2.141
H1-1
CM1
14.0
14.0
80.0
117.1
646.4
50
50.0
1×tee
3.1
1.73
4.83
120.0
0.0726
0.351
0.0
2.141
2.492
CM1
RT
14.0
14.0
2722.6
100
100.0
1×tee
6.1
1.73
7.83
120.0
0.0356
0.279
0.0
2.492
2.771
RT
CONN
14.0
0.0
2722.6
100.0
100.0
2×ell90, 1×gate, 1×check
13.3
24.0
37.3
120.0
0.0356
1.328
1.373
2.771
5.47
H4-7
H4-6
14.0
14.0
80.0
60.0
60.0
25
25.0
—
0.0
3.46
3.46
120.0
0.026
0.09
0.0
0.562
0.652
H4-6
H4-5
14.0
14.0
80.0
64.6
124.6
25
25.0
—
0.0
3.46
3.46
120.0
0.1007
0.349
0.0
0.652
1.001
H3-7
H3-6
14.0
14.0
80.0
61.6
61.6
25
25.0
—
0.0
3.46
3.46
120.0
0.0274
0.095
0.0
0.593
0.688
H4-5
H4-4
14.0
14.0
80.0
80.1
204.7
32
32.0
—
0.0
3.46
3.46
120.0
0.0759
0.263
0.0
1.001
1.264
H3-6
H3-5
14.0
14.0
80.0
66.3
127.9
25
25.0
—
0.0
3.46
3.46
120.0
0.1057
0.366
0.0
0.688
1.054
H2-7
H2-6
14.0
14.0
80.0
63.2
63.2
25
25.0
—
0.0
3.46
3.46
120.0
0.0286
0.099
0.0
0.622
0.721
H4-4
H4-3
14.0
14.0
80.0
89.9
294.6
40
40.0
—
0.0
3.46
3.46
120.0
0.0502
0.174
0.0
1.264
1.438
H3-5
H3-4
14.0
14.0
80.0
82.1
210.0
32
32.0
—
0.0
3.46
3.46
120.0
0.0794
0.275
0.0
1.054
1.329
H2-6
H2-5
14.0
14.0
80.0
68.0
131.2
25
25.0
—
0.0
3.46
3.46
120.0
0.1109
0.384
0.0
0.721
1.105
H5-2
H5-1
14.0
14.0
80.0
102.9
102.9
25
25.0
—
0.0
3.46
3.46
120.0
0.0707
0.245
0.0
1.653
1.898
H4-3
H4-2
14.0
14.0
80.0
95.9
390.6
40
40.0
—
0.0
3.46
3.46
120.0
0.0846
0.293
0.0
1.438
1.731
H3-4
H3-3
14.0
14.0
80.0
92.2
302.2
40
40.0
—
0.0
3.46
3.46
120.0
0.0525
0.182
0.0
1.329
1.511
H2-5
H2-4
14.0
14.0
80.0
84.2
215.3
32
32.0
—
0.0
3.46
3.46
120.0
0.0834
0.289
0.0
1.105
1.394
H5-1
CM5
14.0
14.0
80.0
110.2
213.1
32
32.0
1×tee
1.8
1.73
3.53
120.0
0.0818
0.289
0.0
1.898
2.187
H4-2
H4-1
14.0
14.0
80.0
105.3
495.8
50
50.0
—
0.0
3.46
3.46
120.0
0.0445
0.154
0.0
1.731
1.885
H3-3
H3-2
14.0
14.0
80.0
98.3
400.5
40
40.0
—
0.0
3.46
3.46
120.0
0.0886
0.307
0.0
1.511
1.818
H2-4
H2-3
14.0
14.0
80.0
94.5
309.8
40
40.0
—
0.0
3.46
3.46
120.0
0.0551
0.191
0.0
1.394
1.585
CM5
CM4
14.0
14.0
213.1
65
65.0
—
0.0
3.46
3.46
120.0
0.0026
0.009
0.0
2.187
2.196
H4-1
CM4
14.0
14.0
80.0
109.8
605.7
50
50.0
1×tee
3.1
1.73
4.83
120.0
0.0644
0.311
0.0
1.885
2.196
H3-2
H3-1
14.0
14.0
80.0
107.9
508.4
50
50.0
—
0.0
3.46
3.46
120.0
0.0465
0.161
0.0
1.818
1.979
H2-3
H2-2
14.0
14.0
80.0
100.8
410.6
40
40.0
—
0.0
3.46
3.46
120.0
0.093
0.322
0.0
1.585
1.907
CM4
CM3
14.0
14.0
818.8
65
65.0
—
0.0
3.46
3.46
120.0
0.0315
0.109
0.0
2.196
2.305
H3-1
CM3
14.0
14.0
80.0
112.6
621.0
50
50.0
1×tee
3.1
1.73
4.83
120.0
0.0675
0.326
0.0
1.979
2.305
H2-2
H2-1
14.0
14.0
80.0
110.5
521.1
50
50.0
—
0.0
3.46
3.46
120.0
0.0488
0.169
0.0
1.907
2.076
CM3
CM2
14.0
14.0
1439.8
80
80.0
—
0.0
3.46
3.46
120.0
0.0323
0.112
0.0
2.305
2.417
H2-1
CM2
14.0
14.0
80.0
115.3
636.4
50
50.0
1×tee
3.1
1.73
4.83
120.0
0.0706
0.341
0.0
2.076
2.417
CM2
CM1
14.0
14.0
2076.2
100
100.0
—
0.0
3.46
3.46
120.0
0.0217
0.075
0.0
2.417
2.492
Rows in bold trace the path from the remote head to the connection; the remaining rows are the other branch lines balanced at their junctions. Pf = Hazen–Williams loss over the total (pipe + equivalent) length; Pe = elevation between the nodes; Pt = total pressure at the node. Velocity pressure neglected (conservative).
5. Sprinkler discharge
Head
Flow L/min
Pressure bar
Density mm/min
H1-1
117.1
2.141
9.76
H1-2
112.2
1.967
9.35
H1-3
102.3
1.636
8.53
H1-4
96.0
1.439
8.0
H1-5
85.5
1.142
7.12
H1-6
69.1
0.747
5.76
H1-7 ★
64.2
0.644
5.35
H2-1
115.3
2.077
9.61
H2-2
110.5
1.908
9.21
H2-3
100.8
1.586
8.4
H2-4
94.5
1.395
7.88
H2-5
84.2
1.106
7.02
H2-6
68.0
0.723
5.67
H2-7
63.2
0.624
5.27
H3-1
112.6
1.979
9.38
H3-2
107.9
1.818
8.99
H3-3
98.3
1.511
8.19
H3-4
92.2
1.329
7.68
H3-5
82.1
1.053
6.84
H3-6
66.3
0.687
5.52
H3-7
61.6
0.593
5.13
H4-1
109.8
1.885
9.15
H4-2
105.3
1.732
8.78
H4-3
95.9
1.438
7.99
H4-4
89.9
1.264
7.49
H4-5
80.1
1.001
6.67
H4-6
64.6
0.653
5.38
H4-7
60.0
0.563
5.0
H5-1
110.2
1.899
9.18
H5-2
102.9
1.654
8.58
6. Supply vs demand
Pressure profile along the remote path (remote head → connection), from the balanced solution.
7. Demand summary
Item
Value
Sprinkler flow at the connection
2723 L/min
Pressure at the connection
5.47 bar
Hose allowance
0 L/min
Total system demand
2723 L/min @ 6.02 bar (incl. 10 % margin)
Water storage for the duration
163.4 kL (60 min)
Maximum velocity
5.78 m/s
8. Pipe quantities (design area)
Size mm
Length m
25
31.5
32
15.7
40
28.0
50
20.8
65
7.0
80
3.5
100.0
29.2
9. Checks
Check
Result
Remote head ≥ 60.0 L/min (5.0 mm/min × 12.0 m² or K√Pmin)
PASS
Remote head pressure ≥ 0.5 bar
PASS
Velocity ≤ 6.0 m/s in every pipe
PASS
Supply 7.01 bar ≥ demand 6.02 bar (incl. 10 % margin) at 2723 L/min
PASS
System pressure 8.24 bar (no flow, at the connection) ≤ 12 bar — NBCS 2026 Part F cl. 5.1.3 (f); above it use high-pressure sprinklers
PASS
10. Worked examples — from this project
Worked from this project’s own inputs and results — each value can be traced to the schedules above.
Area of operation — Ordinary hazard (OH) — was OH-II in IS 15105:2002
the hydraulically most remote area of this system; criteria from the hazard table
Given: Design density 5 mm/min over 360 m² · Sprinkler K 80 L/min/√bar, Pmin 0.5 bar · Clause IS 15105:2021 cl. 8.1.2 (5 L/min/m² over 360 m² — one OH class), 9.17 (12 m²/head, 4.5 m), 10.5.7 (≥ 0.5 bar), Table 1 (K80/115), Table 30 (60 min)
1. Coverage per head: As = s² = 3.46² = 12 m²(spacing limited by the maximum area per head)
2. Heads in the area: n = ⌈A / As⌉ = ⌈360 / 12⌉ = 30 heads(engine 30)
3. Heads per branch line: nb = ⌈1.2 · √A / s⌉ = ⌈1.2 · √360 / 3.46⌉ = 7 (5 branch lines (rectangular area along the branch lines))
4. Required flow at the remote head: qreq = max(D · As, K · √Pmin) = max(5 × 12, 80 × √0.5) = max(60.0, 56.6) = 60 L/min(engine 60.0 L/min)
6. Water storage: V = Q · t = 2723 L/min × 60 min / 1000 = 163.4 kL
11. Standards applied
Reference
IS 15105:2021 Design and installation of fixed automatic sprinkler fire extinguishing systems
IS 3844:1989 Code of practice for installation and maintenance of internal fire hydrants and hose reels
IS 13039:2014 External hydrant systems — provision and maintenance
NBCS 2026 (SP 7:2026) Part F Fire and Life Safety — cl. 5.1.1 (a, f), 5.1.3 (f, g), Tables 7A–7J, 7K, 7M, Table 8, Annex D-6
IS 908:1975 Fire hydrant, stand post type
IS 5290:1993 Landing valves
IS 9668 / IS 12469 Pumps for fire fighting
TAC Fire Protection Manual (sprinkler / hydrant rules)
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.