SAMPLEAuto sprinkler placement & piping — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
Sprinkler placement & piping
Sample project — Tower A · Indian regime · India
Generated 28 Nov 2026 16:09 Automatic head placement per room, range / cross / main piping, zones, remote-area check Project code SAMPLE
Floors
1
Rooms
5
Heads
42
Zones
1
Pipe
144.0 m
Governing demand
3608.8 L/min @ 3.11 bar
1. Design basis
Item
Value
Basis
Standard
India
India — NBCS 2026 (SP 7:2026) Part F · IS 15105:2021 · IS 3844:1989 · IS 13039:2014 · TAC
Default hazard
Ordinary hazard (OH) — was OH-II in IS 15105:2002
per room where different
Head type
upright
project
Placement
grid aligned to the room's long axis at ≤ maximum spacing, equal end bays, coverage ≤ code maximum, heads inside the room, concave strips filled, beam bays respected
IS 15105 cl. 8 (spacing and coverage tables)
Minimum spacing
1.8 m
code
Piping
range pipes per row, cross main at the row ends nearest the tap, corridor spine → riser, shortest-path tree; sizes by the pipe schedule for the heads served, hydraulically checked
code pipe schedule + calculation
Zoning
NBCS 2026 Part F cl. 5.1.3 (g) — max 4 500 m² on any one floor per sprinkler riser / installation control valve (industrial / hazardous: Authority; 4 000 m² EH per IS 15105 kept)
code
Material
MS
project
Joints
Threaded (screwed) throughout — malleable iron fittings, sockets at every pipe length
project
Drawing
single line, size on every pipe
project
Hangers
by pipe size: one per 3.7 m up to 32 mm, one per 4.6 m from 40 mm (steel pipe)
code
Heads used
upright — temperature rating, K-factor and response per room (see the room table)
project / room use
Supports
Rigid hangers (threaded rod + clevis / band hanger) · RCC slab — anchor fasteners in the soffit
project
2. Checks
Check
Result
Every room: coverage per head ≤ code maximum
PASS
Every room: spacing between heads ≤ code maximum
PASS
Every room: heads ≥ 1.8 m apart
PASS
Every room: no point of the ceiling farther than half the spacing from a head (walls, concave corners)
PASS
Zones within the code area limit (NBCS 2026 Part F cl. 5.1.3 (g) — max 4 500 m² on any one floor per sprinkler riser / installation control valve (industrial / hazardous: Authority; 4 000 m² EH per IS 15105 kept))
PASS
Remote area of every zone: required flow at the remote head met and velocity within limit
PASS
IS 15105:2021 cl. 10.4.4 (b) — friction design point → control valve ≤ 0.50 bar at 1000 L/min
PASS
IS 15105:2021 cl. 10.1 (h) — ≤ 6 sprinklers per range pipe (9 on a 50 mm range); up-down pairs count 2
PASS
IS 15105:2021 cl. 10.5.6 (g) — uprights not on pipes > 65 mm, pendents not directly on pipes > 80 mm (else arm pipe)
PASS
IS 15105:2021 cl. 10.1 (g) — range pipes ≤ 50 mm
PASS
IS 15105:2021 cl. 10.5.3 — velocity ≤ 6 m/s through the installation valves (feed) and ≤ 10 m/s in the pipes
PASS
IS 15105:2021 cl. 10.3.3 — installation pressure ≤ 7 bar
PASS
3. Ground — level 0.0 m, ceiling 3.2 m — 42 heads
Zone
Room
Kind
Hazard
Type
Area m²
Heads
Coverage m² (max)
Spacing (max)
Mode
Checks
Notes
Z1
Office 1
room
Ordinary hazard (OH) — was OH-II in IS 15105:2002
upright
96.0
8
12.0 (12.0)
3.0 × 4.0 (4.5)
standard
PASS
Z1
Office 2
room
Ordinary hazard (OH) — was OH-II in IS 15105:2002
upright
96.0
8
12.0 (12.0)
3.0 × 4.0 (4.5)
standard
PASS
Z1
Corridor
corridor
Ordinary hazard (OH) — was OH-II in IS 15105:2002
upright
65.0
6
10.83 (12.0)
4.33 × 2.5 (4.5)
standard
PASS
Z1
Open office
room
Ordinary hazard (OH) — was OH-II in IS 15105:2002
upright
130.0
14
9.29 (12.0)
3.2 × 2.88 (4.5)
standard
PASS
Z1
Store
room
Ordinary hazard (OH) — was OH-III in IS 15105:2002
upright
55.0
6
9.17 (12.0)
3.33 × 2.75 (4.5)
standard
PASS
Z1 — 42 heads · 442.0 m² (limit 4500) · Ordinary hazard (OH) — was OH-II in IS 15105:2002
Remote area
Heads
Required at remote head
Achieved
Density
Flow at floor tap
Pressure at tap
Feed
Max velocity
Result
H4-14 …
40
56.6 L/min
56.6 L/min @ 0.5 bar
6.29 mm/min
3608.8 L/min
3.11 bar
150 mm
5.78 m/s
PASS
Pipe levels (centre line above the floor): ranges +3.00 m, cross / mains +2.90 m (slab soffit +3.2 m); no false-ceiling void given — drops not counted
Design area: 360 m² area of operation
Hydraulic calculation — node by node (most remote head → floor tap)
Node
Elev m
K
Head q L/min
Pipe q L/min
Pt bar
Pipe
NB
ID mm
L m
Fittings
Eq. L m
Total L m
C
v m/s
Pf bar/m
Pf bar
Pe bar
H4-14
3.2
80.0
56.6
56.6
0.5
P50
25.0
25.0
3.2
—
0.0
3.2
120.0
1.92
0.0233
0.075
0.0
H4-13
3.2
80.0
60.6
117.2
0.575
P56
25.0
25.0
0.6
1×tee
1.5
2.1
120.0
3.98
0.0899
0.189
0.029
CM4-4
2.9
117.2
0.793
P57
32.0
32.0
2.87
—
0.0
2.87
120.0
2.43
0.027
0.078
0.0
CM4-3
2.9
240.4
0.871
P60
40.0
40.0
2.88
1×tee
2.4
5.28
120.0
3.19
0.0345
0.182
0.0
N57
2.9
390.3
1.052
P58
50.0
50.0
2.6
—
0.0
2.6
120.0
3.31
0.0285
0.074
-0.029
H4-8
3.2
80.0
83.8
474.1
1.097
P46
50.0
50.0
3.2
—
0.0
3.2
120.0
4.02
0.0409
0.131
0.0
H4-7
3.2
80.0
88.6
562.7
1.228
P45
50.0
50.0
3.2
—
0.0
3.2
120.0
4.78
0.0562
0.18
0.0
H4-6
3.2
80.0
94.9
657.7
1.408
P52
50.0
50.0
0.6
1×tee
3.1
3.7
120.0
5.58
0.075
0.277
0.029
CM4-2
2.9
657.7
1.714
P53
65
65.0
2.87
—
0.0
2.87
120.0
3.3
0.0209
0.06
0.0
CM4-1
2.9
1058.2
1.774
P54
65.0
65.0
1.44
1×ell90
1.8
3.24
120.0
5.32
0.0504
0.163
0.0
T4
2.9
1058.2
1.938
P75
65.0
65.0
1.25
1×tee
3.7
4.95
120.0
5.32
0.0504
0.25
0.0
M9
2.9
1680.7
2.187
P70
80
80.0
1.27
—
0.0
1.27
120.0
5.57
0.0432
0.055
0.0
M3
2.9
1796.0
2.242
P26
100
100.0
4.33
—
0.0
4.33
120.0
3.81
0.0165
0.071
0.0
M4
2.9
1913.2
2.314
P29
100
100.0
4.33
—
0.0
4.33
120.0
4.06
0.0185
0.08
0.0
M5
2.9
2032.4
2.394
P72
100
100.0
4.07
—
0.0
4.07
120.0
4.31
0.0207
0.084
0.0
M10
2.9
2721.5
2.478
P73
100
100.0
0.27
—
0.0
0.27
120.0
5.78
0.0356
0.009
0.0
M6
2.9
2843.1
2.488
P76
150
150.0
1.93
—
0.0
1.93
120.0
2.68
0.0054
0.01
0.0
M11
2.9
3361.0
2.498
P77
150
150.0
2.4
—
0.0
2.4
120.0
3.17
0.0073
0.018
0.0
M7
2.9
3483.3
2.515
P38
150
150.0
4.33
—
0.0
4.33
120.0
3.29
0.0078
0.034
0.0
M8
2.9
3608.8
2.549
P39
150
150.0
2.17
—
0.0
2.17
120.0
3.4
0.0083
0.018
0.0
M2
2.9
3608.8
2.567
P2
150
150.0
0.25
1×ell90
4.3
4.55
120.0
3.4
0.0083
0.038
0.0
RISER
2.9
3608.8
2.605
FEED
150
150.0
3.7
2×ell90, 1×gate, 1×check
22.3
26.0
120.0
3.4
0.0083
0.217
0.284
CONN
0.0
3608.8
3.106
—
Pt at the next node = Pt + Pf + Pe. Pf = 6.05×10⁵·L·Q1.85 / (C1.85·d4.87) bar (Q L/min, d internal mm); fittings as equivalent length; Pe = 0.0981 bar per m of rise. Head q = K·√Pt.
Heads in the remote area
Head
q L/min
P bar
H4-14
56.6
0.5
H4-12
59.5
0.552
H4-13
60.6
0.575
H4-5
62.7
0.613
H1-4
62.7
0.614
H4-11
63.7
0.634
H1-3
66.9
0.698
H4-4
67.1
0.704
H1-8
67.3
0.709
H1-7
71.8
0.805
H4-10
72.4
0.82
H4-9
77.5
0.938
H2-8
79.8
0.996
H1-2
80.9
1.023
H4-3
82.0
1.051
H4-8
83.8
1.097
H2-7
85.0
1.128
H1-6
86.7
1.176
H4-7
88.6
1.228
H1-1
89.9
1.262
H4-2
91.5
1.309
H4-6
94.9
1.408
H1-5
96.3
1.449
H2-3
96.7
1.46
H4-1
97.3
1.479
H5-3
97.7
1.492
H5-5
98.6
1.518
H2-6
102.3
1.635
H2-2
102.7
1.649
H5-2
104.5
1.706
H5-4
105.4
1.735
H2-1
109.3
1.866
H5-1
111.8
1.953
H2-5
113.3
2.007
H3-1
115.3
2.078
H3-2
117.2
2.145
H3-3
119.2
2.221
H3-4
121.6
2.309
H3-5
122.3
2.335
H3-6
125.6
2.463
Pipe
From
To
Kind
Size mm
Length m
Heads
Hangers
P2
RISER
M2
main
150 ↑
0.25
42
1
P11
CM1-1
CM1-2
cross
40
4.0
4
1
P12
T1
CM1-2
cross
50
2.0
8
1
P21
CM2-1
CM2-2
cross
40
4.0
4
1
P22
T2
CM2-2
cross
65 ↑
2.0
8
1
P26
M3
M4
main
100 ↑
4.33
23
1
P29
M4
M5
main
100 ↑
4.33
24
1
P38
M7
M8
main
150 ↑
4.33
41
1
P39
M8
M2
main
150 ↑
2.17
42
1
P53
CM4-1
CM4-2
cross
65 ↑
2.87
9
1
P54
T4
CM4-1
cross
65
1.44
14
1
P57
CM4-3
CM4-4
cross
32
2.87
2
1
P60
N57
CM4-3
cross
40
2.88
4
1
P67
CM5-1
CM5-2
cross
32
2.75
3
1
P68
T5
CM5-1
cross
50 ↑
1.38
6
1
P70
M9
M3
main
80 ↑
1.27
22
1
P71
M9
T1
main
50
1.25
8
1
P72
M5
M10
main
100 ↑
4.07
25
1
P73
M10
M6
main
100 ↑
0.27
33
1
P74
M10
T2
main
65 ↑
1.25
8
1
P75
M9
T4
main
65
1.25
14
1
P76
M6
M11
main
150 ↑
1.93
34
1
P77
M11
M7
main
150 ↑
2.4
40
1
P78
M11
T5
main
50 ↑
1.25
6
1
43 range-pipe sections not listed (see the Excel); ↑ = upsized for velocity.
4. Bill of quantities
Item
Qty
Unit
Sprinkler head — upright K80 68 °C SR
42
nos
Pipe MS 25 mm
51.9
m
Pipe MS 32 mm
24.9
m
Pipe MS 40 mm
17.7
m
Pipe MS 50 mm
15.4
m
Pipe MS 65 mm
8.8
m
Pipe MS 80 mm
1.3
m
Pipe MS 100 mm
13.0
m
Pipe MS 150 mm
11.0
m
Rigid hanger 150 mm — M12 rod, clevis / band hanger, anchor fastener in the RCC slab
5
nos
Rigid hanger 32 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab
10
nos
Rigid hanger 25 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab
24
nos
Rigid hanger 40 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab
10
nos
Rigid hanger 50 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab
8
nos
Rigid hanger 65 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab
5
nos
Rigid hanger 100 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab
4
nos
Rigid hanger 80 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab
1
nos
Floor control valve assembly
1
sets
Fitting — Elbow 90° 150 (threaded MI)
1
nos
Fitting — Elbow 90° 32 (threaded MI)
2
nos
Fitting — Elbow 90° 40 (threaded MI)
2
nos
Fitting — Elbow 90° 65 (threaded MI)
1
nos
Fitting — Floor control valve set 150 (isolation + flow switch + test & drain)
Fitting — Head outlet — Reducing tee 25 × 15 (threaded MI)
9
nos
Fitting — Head outlet — Reducing tee 32 × 15 (threaded MI)
7
nos
Fitting — Head outlet — Reducing tee 40 × 15 (threaded MI)
7
nos
Fitting — Head outlet — Reducing tee 50 × 15 (threaded MI)
3
nos
Fitting — Reducer 100 × 80 (threaded MI)
1
nos
Fitting — Reducer 150 × 100 (threaded MI)
1
nos
Fitting — Reducer 32 × 25 (threaded MI)
8
nos
Fitting — Reducer 40 × 32 (threaded MI)
7
nos
Fitting — Reducer 50 × 40 (threaded MI)
3
nos
Fitting — Reducer 65 × 40 (threaded MI)
1
nos
Fitting — Reducer 65 × 50 (threaded MI)
1
nos
Fitting — Reducer 80 × 65 (threaded MI)
1
nos
Fitting — Socket 100 (threaded)
4
nos
Fitting — Socket 150 (threaded)
5
nos
Fitting — Socket 25 (threaded)
24
nos
Fitting — Socket 32 (threaded)
10
nos
Fitting — Socket 40 (threaded)
10
nos
Fitting — Socket 50 (threaded)
8
nos
Fitting — Socket 65 (threaded)
5
nos
Fitting — Socket 80 (threaded)
1
nos
Fitting — Tee 100 × 25 (threaded MI)
3
nos
Fitting — Tee 100 × 65 (threaded MI)
1
nos
Fitting — Tee 150 × 25 (threaded MI)
2
nos
Fitting — Tee 150 × 32 (threaded MI)
1
nos
Fitting — Tee 150 × 50 (threaded MI)
1
nos
Fitting — Tee 40 × 25 (threaded MI)
1
nos
Fitting — Tee 50 × 25 (threaded MI)
1
nos
Fitting — Tee 50 × 32 (threaded MI)
1
nos
Fitting — Tee 50 × 40 (threaded MI)
1
nos
Fitting — Tee 65 × 40 (threaded MI)
2
nos
Fitting — Tee 80 × 50 (threaded MI)
1
nos
5. Typical details and legend
Installation details for the head types used, the jointing details of the project scheme (Threaded (screwed) throughout — malleable iron fittings, sockets at every pipe length), the pipe support system (Rigid hangers (threaded rod + clevis / band hanger); RCC slab — anchor fasteners in the soffit) and the legend with the quantities of this project. Not to scale.
6. Worked examples — from this project
Worked from this project’s own inputs and results — each value can be traced to the schedules above.
Room Office 1 — head grid (Ordinary hazard (OH) — was OH-II in IS 15105:2002)
largest regular room on Ground; spacing and coverage limits from the hazard table
Given: Room 96 m², long axis 12.00 m × 8.00 m · Limits max spacing S = 4.5 m · max coverage 12 m² per head · min spacing 1.8 m
1. Bays along each axis: nx = ⌈L / S⌉, ny = ⌈W / S⌉ = ⌈12.00 / 4.5⌉, ⌈8.00 / 4.5⌉ = 3 × 2 (bay 4.00 × 4.00 m = 16.00 m²)
2. Coverage too large → add a row along the larger bay: until sx · sy ≤ 12 m² = 4 × 2
3. Spacing: sx = L / nx, sy = W / ny = 12.00 / 4, 8.00 / 2 = 3.00 × 4.00 m(engine 3.0 × 4.0 m)
4. Heads: n = nx · ny = 4 × 2 = 8 (engine 8 heads (heads ½ bay from the walls))
5. Coverage per head: A / n ≤ 12 m² → 96 / 8 = 12.0 m² PASS
6. Spacing: max(sx, sy) ≤ 4.5 m → 4 m PASS
7. Distance to the walls: ½ bay ≤ S / 2 = 2.25 m → 1.50 / 2.00 m PASS
Pipe sizes — Z1, IS 15105:2021 cl. 10 (ordinary hazard)
range / distribution pipes of the same room and the zone's main next to the riser; an up-down pair counts 2 sprinklers (cl. 10.2.2 b)
Given: Method Pre-calculated pipework (cl. 10.3.1 a, 10.4) — LH/OH, sprinklered area 442 m² ≤ 5 000 m² · Method Rooms of a divided occupancy are fed by 32 mm pipes (cl. 10.1 d) · Method Pipes upstream of the design points: friction ≤ 0.5 bar at 1000 L/min (+ 0.00 bar static allowance) — worst path 0.489 bar · Table 20 — range pipes last range: 25 mm ≤ 2, 32 mm ≤ 3, 40 mm ≤ 4, 50 mm ≤ 9 · other ranges: 25 mm ≤ 3, 32 mm ≤ 4, 40 mm ≤ 6, 50 mm ≤ 9 · Table 21 — distribution pipes 32 mm ≤ 3, 40 mm ≤ 6, 50 mm ≤ 9, 65 mm ≤ 18; more sprinklers → calculated (10.4.4 b) · Limits min 25 mm (10.1 f) · range ≤ 50 mm, ≤ 6 sprinklers (9 on 50 mm) (10.1 g, h) · 32 mm feeds to rooms of divided occupancies (10.1 d) · sizes never grow in the flow direction (10.4.1 a)
1. Range P9 (0.6 m) serving n = 4 sprinklers: Table 20 (range) / Table 21 (distribution) → friction rule upstream of the design point = 40 mm
2. Cross P12 (2 m) serving n = 8 sprinklers: Table 20 (range) / Table 21 (distribution) → friction rule upstream of the design point = 50 mm
3. Main P2 (0.25 m) serving n = 42 sprinklers: Table 20 (range) / Table 21 (distribution) → friction rule upstream of the design point = 150 mm(upsized for velocity)
Remote area — Ground · Z1 (Ordinary hazard (OH) — was OH-II in IS 15105:2002)
the governing zone: highest pressure needed at the floor tap
Given: Design 5 mm/min over 360 m², K 80, Pmin 0.5 bar · Most remote head H4-14 in Open office
1. Heads in the remote area: N = ⌈A / (sx · sy)⌉ = ⌈360 / (3.2 × 2.88)⌉ = ⌈39.06⌉ = 40 heads(engine 40)
2. Heads along the range pipe: ⌈1.2 · √A / sx⌉ = ⌈1.2 × √360 / 3.2⌉ = 8 (then the adjacent rows)
3. Required flow at the remote head: qreq = max(D · A / N, K · √Pmin) = max(5 × 360 / 40, 80 × √0.5) = max(45.0, 56.6) = 56.6 L/min(engine 56.6)
4. Remote head discharge: q = K · √P = 80 × √0.5 = 56.6 L/min(engine 56.6 L/min)
5. Flow at the floor tap: Q = Σ K · √Pi over the N heads (head-to-head balance, Hazen–Williams) = 3608.8 L/min(at 3.11 bar, feed 150 mm)
6. Remote area: q ≥ qreq, v ≤ None m/s → 56.6 ≥ 56.6 L/min, vmax 5.78 m/s PASS
7. Standards applied
Reference
IS 15105:2021 Design and installation of fixed automatic sprinkler fire extinguishing systems
IS 3844:1989 Code of practice for installation and maintenance of internal fire hydrants and hose reels
IS 13039:2014 External hydrant systems — provision and maintenance
NBCS 2026 (SP 7:2026) Part F Fire and Life Safety — cl. 5.1.1 (a, f), 5.1.3 (f, g), Tables 7A–7J, 7K, 7M, Table 8, Annex D-6
IS 908:1975 Fire hydrant, stand post type
IS 5290:1993 Landing valves
IS 9668 / IS 12469 Pumps for fire fighting
TAC Fire Protection Manual (sprinkler / hydrant rules)
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.