Sprinkler placement & piping

Sample project — Tower A · Indian regime · India
Generated 28 Nov 2026 16:09
Automatic head placement per room, range / cross / main piping, zones, remote-area check
Project code SAMPLE
Floors
1
Rooms
5
Heads
42
Zones
1
Pipe
144.0 m
Governing demand
3608.8 L/min @ 3.11 bar

1. Design basis

ItemValueBasis
StandardIndiaIndia — NBCS 2026 (SP 7:2026) Part F · IS 15105:2021 · IS 3844:1989 · IS 13039:2014 · TAC
Default hazardOrdinary hazard (OH) — was OH-II in IS 15105:2002per room where different
Head typeuprightproject
Placementgrid aligned to the room's long axis at ≤ maximum spacing, equal end bays, coverage ≤ code maximum, heads inside the room, concave strips filled, beam bays respectedIS 15105 cl. 8 (spacing and coverage tables)
Minimum spacing1.8 mcode
Pipingrange pipes per row, cross main at the row ends nearest the tap, corridor spine → riser, shortest-path tree; sizes by the pipe schedule for the heads served, hydraulically checkedcode pipe schedule + calculation
ZoningNBCS 2026 Part F cl. 5.1.3 (g) — max 4 500 m² on any one floor per sprinkler riser / installation control valve (industrial / hazardous: Authority; 4 000 m² EH per IS 15105 kept)code
MaterialMSproject
JointsThreaded (screwed) throughout — malleable iron fittings, sockets at every pipe lengthproject
Drawingsingle line, size on every pipeproject
Hangersby pipe size: one per 3.7 m up to 32 mm, one per 4.6 m from 40 mm (steel pipe)code
Heads usedupright — temperature rating, K-factor and response per room (see the room table)project / room use
SupportsRigid hangers (threaded rod + clevis / band hanger) · RCC slab — anchor fasteners in the soffitproject

2. Checks

CheckResult
Every room: coverage per head ≤ code maximumPASS
Every room: spacing between heads ≤ code maximumPASS
Every room: heads ≥ 1.8 m apartPASS
Every room: no point of the ceiling farther than half the spacing from a head (walls, concave corners)PASS
Zones within the code area limit (NBCS 2026 Part F cl. 5.1.3 (g) — max 4 500 m² on any one floor per sprinkler riser / installation control valve (industrial / hazardous: Authority; 4 000 m² EH per IS 15105 kept))PASS
Remote area of every zone: required flow at the remote head met and velocity within limitPASS
IS 15105:2021 cl. 10.4.4 (b) — friction design point → control valve ≤ 0.50 bar at 1000 L/minPASS
IS 15105:2021 cl. 10.1 (h) — ≤ 6 sprinklers per range pipe (9 on a 50 mm range); up-down pairs count 2PASS
IS 15105:2021 cl. 10.5.6 (g) — uprights not on pipes > 65 mm, pendents not directly on pipes > 80 mm (else arm pipe)PASS
IS 15105:2021 cl. 10.1 (g) — range pipes ≤ 50 mmPASS
IS 15105:2021 cl. 10.5.3 — velocity ≤ 6 m/s through the installation valves (feed) and ≤ 10 m/s in the pipesPASS
IS 15105:2021 cl. 10.3.3 — installation pressure ≤ 7 barPASS

3. Ground — level 0.0 m, ceiling 3.2 m — 42 heads

Office 1OH2 · 8 heads · 12.0 m² · Z1Office 2OH2 · 8 heads · 12.0 m² · Z1CorridorOH2 · 6 heads · 10.83 m² · Z1Open officeOH2 · 14 heads · 9.29 m² · Z1StoreOH3 · 6 heads · 9.17 m² · Z1P2 main 150 mm · 0.25 m · 42 headsP3 range 32 mm · 3.0 m · 3 heads32ØP4 range 25 mm · 3.0 m · 2 heads25ØP5 range 25 mm · 3.0 m · 1 heads25ØP6 range 32 mm · 3.0 m · 3 heads32ØP7 range 25 mm · 3.0 m · 2 heads25ØP8 range 25 mm · 3.0 m · 1 heads25ØP9 range 40 mm · 0.6 m · 4 headsP10 range 40 mm · 0.6 m · 4 headsP11 cross 40 mm · 4.0 m · 4 heads40ØP12 cross 50 mm · 2.0 m · 8 heads50ØP13 range 32 mm · 3.0 m · 3 heads32ØP14 range 25 mm · 3.0 m · 2 heads25ØP15 range 25 mm · 3.0 m · 1 heads25ØP16 range 32 mm · 3.0 m · 3 heads32ØP17 range 25 mm · 3.0 m · 2 heads25ØP18 range 25 mm · 3.0 m · 1 heads25ØP19 range 40 mm · 0.6 m · 4 headsP20 range 40 mm · 0.6 m · 4 headsP21 cross 40 mm · 4.0 m · 4 heads40ØP22 cross 65 mm · 2.0 m · 8 heads65ØP25 range 25 mm · 0.05 m · 1 headsP26 main 100 mm · 4.33 m · 23 heads100ØP28 range 25 mm · 0.05 m · 1 headsP29 main 100 mm · 4.33 m · 24 heads100ØP31 range 25 mm · 0.05 m · 1 headsP34 range 25 mm · 0.05 m · 1 headsP37 range 25 mm · 0.05 m · 1 headsP38 main 150 mm · 4.33 m · 41 heads150ØP39 main 150 mm · 2.17 m · 42 heads150ØP40 range 32 mm · 0.05 m · 1 headsP41 range 40 mm · 3.2 m · 4 heads40ØP42 range 32 mm · 3.2 m · 3 heads32ØP43 range 25 mm · 3.2 m · 2 heads25ØP44 range 25 mm · 3.2 m · 1 heads25ØP45 range 50 mm · 3.2 m · 8 heads50ØP46 range 50 mm · 3.2 m · 7 heads50ØP48 range 25 mm · 3.2 m · 1 heads25ØP49 range 25 mm · 3.2 m · 1 heads25ØP50 range 25 mm · 3.2 m · 1 heads25ØP51 range 40 mm · 0.6 m · 5 headsP52 range 50 mm · 0.6 m · 9 headsP53 cross 65 mm · 2.87 m · 9 heads65ØP54 cross 65 mm · 1.44 m · 14 heads65ØP55 range 25 mm · 0.6 m · 2 headsP56 range 25 mm · 0.6 m · 2 headsP57 cross 32 mm · 2.87 m · 2 heads32ØP58 range 50 mm · 2.6 m · 6 heads50ØP59 range 25 mm · 0.6 m · 2 headsP60 cross 40 mm · 2.88 m · 4 heads40ØP61 range 32 mm · 3.33 m · 2 heads32ØP62 range 25 mm · 3.33 m · 1 heads25ØP63 range 25 mm · 3.33 m · 2 heads25ØP64 range 25 mm · 3.33 m · 1 heads25ØP65 range 40 mm · 0.57 m · 3 headsP66 range 32 mm · 0.57 m · 3 headsP67 cross 32 mm · 2.75 m · 3 heads32ØP68 cross 50 mm · 1.38 m · 6 heads50ØP70 main 80 mm · 1.27 m · 22 heads80ØP71 main 50 mm · 1.25 m · 8 heads50ØP72 main 100 mm · 4.07 m · 25 heads100ØP73 main 100 mm · 0.27 m · 33 headsP74 main 65 mm · 1.25 m · 8 heads65ØP75 main 65 mm · 1.25 m · 14 heads65ØP76 main 150 mm · 1.93 m · 34 heads150ØP77 main 150 mm · 2.4 m · 40 heads150ØP78 main 50 mm · 1.25 m · 6 heads50ØH1-1 K80H1-2 K80H1-3 K80H1-4 K80H1-5 K80H1-6 K80H1-7 K80H1-8 K80H2-1 K80H2-2 K80H2-3 K80H2-4 K80H2-5 K80H2-6 K80H2-7 K80H2-8 K80H3-1 K80H3-2 K80H3-3 K80H3-4 K80H3-5 K80H3-6 K80H4-1 K80H4-2 K80H4-3 K80H4-4 K80H4-5 K80H4-6 K80H4-7 K80H4-8 K80H4-9 K80H4-10 K80H4-11 K80H4-12 K80H4-13 K80H4-14 K80H5-1 K80H5-2 K80H5-3 K80H5-4 K80H5-5 K80H5-6 K80Z1: 42 heads · 442.0 m² · remote area 40 heads → 3608.8 L/min @ 3.11 barRISER
ZoneRoomKindHazardTypeArea m²HeadsCoverage m² (max)Spacing (max)ModeChecksNotes
Z1Office 1roomOrdinary hazard (OH) — was OH-II in IS 15105:2002upright96.0812.0 (12.0)3.0 × 4.0 (4.5)standardPASS
Z1Office 2roomOrdinary hazard (OH) — was OH-II in IS 15105:2002upright96.0812.0 (12.0)3.0 × 4.0 (4.5)standardPASS
Z1CorridorcorridorOrdinary hazard (OH) — was OH-II in IS 15105:2002upright65.0610.83 (12.0)4.33 × 2.5 (4.5)standardPASS
Z1Open officeroomOrdinary hazard (OH) — was OH-II in IS 15105:2002upright130.0149.29 (12.0)3.2 × 2.88 (4.5)standardPASS
Z1StoreroomOrdinary hazard (OH) — was OH-III in IS 15105:2002upright55.069.17 (12.0)3.33 × 2.75 (4.5)standardPASS

Z1 — 42 heads · 442.0 m² (limit 4500) · Ordinary hazard (OH) — was OH-II in IS 15105:2002

Remote areaHeadsRequired at remote headAchievedDensityFlow at floor tapPressure at tapFeedMax velocityResult
H4-14 …4056.6 L/min56.6 L/min @ 0.5 bar6.29 mm/min3608.8 L/min3.11 bar150 mm5.78 m/sPASS

Pipe levels (centre line above the floor): ranges +3.00 m, cross / mains +2.90 m (slab soffit +3.2 m); no false-ceiling void given — drops not counted

Design area: 360 m² area of operation

Hydraulic calculation — node by node (most remote head → floor tap)

NodeElev mKHead q L/minPipe q L/minPt barPipeNBID mmL mFittingsEq. L mTotal L mCv m/sPf bar/mPf barPe bar
H4-143.280.056.656.60.5P5025.025.03.2—0.03.2120.01.920.02330.0750.0
H4-133.280.060.6117.20.575P5625.025.00.61×tee1.52.1120.03.980.08990.1890.029
CM4-42.9117.20.793P5732.032.02.87—0.02.87120.02.430.0270.0780.0
CM4-32.9240.40.871P6040.040.02.881×tee2.45.28120.03.190.03450.1820.0
N572.9390.31.052P5850.050.02.6—0.02.6120.03.310.02850.074-0.029
H4-83.280.083.8474.11.097P4650.050.03.2—0.03.2120.04.020.04090.1310.0
H4-73.280.088.6562.71.228P4550.050.03.2—0.03.2120.04.780.05620.180.0
H4-63.280.094.9657.71.408P5250.050.00.61×tee3.13.7120.05.580.0750.2770.029
CM4-22.9657.71.714P536565.02.87—0.02.87120.03.30.02090.060.0
CM4-12.91058.21.774P5465.065.01.441×ell901.83.24120.05.320.05040.1630.0
T42.91058.21.938P7565.065.01.251×tee3.74.95120.05.320.05040.250.0
M92.91680.72.187P708080.01.27—0.01.27120.05.570.04320.0550.0
M32.91796.02.242P26100100.04.33—0.04.33120.03.810.01650.0710.0
M42.91913.22.314P29100100.04.33—0.04.33120.04.060.01850.080.0
M52.92032.42.394P72100100.04.07—0.04.07120.04.310.02070.0840.0
M102.92721.52.478P73100100.00.27—0.00.27120.05.780.03560.0090.0
M62.92843.12.488P76150150.01.93—0.01.93120.02.680.00540.010.0
M112.93361.02.498P77150150.02.4—0.02.4120.03.170.00730.0180.0
M72.93483.32.515P38150150.04.33—0.04.33120.03.290.00780.0340.0
M82.93608.82.549P39150150.02.17—0.02.17120.03.40.00830.0180.0
M22.93608.82.567P2150150.00.251×ell904.34.55120.03.40.00830.0380.0
RISER2.93608.82.605FEED150150.03.72×ell90, 1×gate, 1×check22.326.0120.03.40.00830.2170.284
CONN0.03608.83.106—

Pt at the next node = Pt + Pf + Pe. Pf = 6.05×10⁵·L·Q1.85 / (C1.85·d4.87) bar (Q L/min, d internal mm); fittings as equivalent length; Pe = 0.0981 bar per m of rise. Head q = K·√Pt.

Heads in the remote area

Headq L/minP bar
H4-1456.60.5
H4-1259.50.552
H4-1360.60.575
H4-562.70.613
H1-462.70.614
H4-1163.70.634
H1-366.90.698
H4-467.10.704
H1-867.30.709
H1-771.80.805
H4-1072.40.82
H4-977.50.938
H2-879.80.996
H1-280.91.023
H4-382.01.051
H4-883.81.097
H2-785.01.128
H1-686.71.176
H4-788.61.228
H1-189.91.262
H4-291.51.309
H4-694.91.408
H1-596.31.449
H2-396.71.46
H4-197.31.479
H5-397.71.492
H5-598.61.518
H2-6102.31.635
H2-2102.71.649
H5-2104.51.706
H5-4105.41.735
H2-1109.31.866
H5-1111.81.953
H2-5113.32.007
H3-1115.32.078
H3-2117.22.145
H3-3119.22.221
H3-4121.62.309
H3-5122.32.335
H3-6125.62.463
PipeFromToKindSize mmLength mHeadsHangers
P2RISERM2main150 ↑0.25421
P11CM1-1CM1-2cross404.041
P12T1CM1-2cross502.081
P21CM2-1CM2-2cross404.041
P22T2CM2-2cross65 ↑2.081
P26M3M4main100 ↑4.33231
P29M4M5main100 ↑4.33241
P38M7M8main150 ↑4.33411
P39M8M2main150 ↑2.17421
P53CM4-1CM4-2cross65 ↑2.8791
P54T4CM4-1cross651.44141
P57CM4-3CM4-4cross322.8721
P60N57CM4-3cross402.8841
P67CM5-1CM5-2cross322.7531
P68T5CM5-1cross50 ↑1.3861
P70M9M3main80 ↑1.27221
P71M9T1main501.2581
P72M5M10main100 ↑4.07251
P73M10M6main100 ↑0.27331
P74M10T2main65 ↑1.2581
P75M9T4main651.25141
P76M6M11main150 ↑1.93341
P77M11M7main150 ↑2.4401
P78M11T5main50 ↑1.2561

43 range-pipe sections not listed (see the Excel); ↑ = upsized for velocity.

4. Bill of quantities

ItemQtyUnit
Sprinkler head — upright K80 68 °C SR42nos
Pipe MS 25 mm51.9m
Pipe MS 32 mm24.9m
Pipe MS 40 mm17.7m
Pipe MS 50 mm15.4m
Pipe MS 65 mm8.8m
Pipe MS 80 mm1.3m
Pipe MS 100 mm13.0m
Pipe MS 150 mm11.0m
Rigid hanger 150 mm — M12 rod, clevis / band hanger, anchor fastener in the RCC slab5nos
Rigid hanger 32 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab10nos
Rigid hanger 25 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab24nos
Rigid hanger 40 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab10nos
Rigid hanger 50 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab8nos
Rigid hanger 65 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab5nos
Rigid hanger 100 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab4nos
Rigid hanger 80 mm — M10 rod, clevis / band hanger, anchor fastener in the RCC slab1nos
Floor control valve assembly1sets
Fitting — Elbow 90° 150 (threaded MI)1nos
Fitting — Elbow 90° 32 (threaded MI)2nos
Fitting — Elbow 90° 40 (threaded MI)2nos
Fitting — Elbow 90° 65 (threaded MI)1nos
Fitting — Floor control valve set 150 (isolation + flow switch + test & drain)1nos
Fitting — Head outlet — Reducing elbow 25 × 15 (threaded MI)15nos
Fitting — Head outlet — Reducing elbow 32 × 15 (threaded MI)1nos
Fitting — Head outlet — Reducing tee 25 × 15 (threaded MI)9nos
Fitting — Head outlet — Reducing tee 32 × 15 (threaded MI)7nos
Fitting — Head outlet — Reducing tee 40 × 15 (threaded MI)7nos
Fitting — Head outlet — Reducing tee 50 × 15 (threaded MI)3nos
Fitting — Reducer 100 × 80 (threaded MI)1nos
Fitting — Reducer 150 × 100 (threaded MI)1nos
Fitting — Reducer 32 × 25 (threaded MI)8nos
Fitting — Reducer 40 × 32 (threaded MI)7nos
Fitting — Reducer 50 × 40 (threaded MI)3nos
Fitting — Reducer 65 × 40 (threaded MI)1nos
Fitting — Reducer 65 × 50 (threaded MI)1nos
Fitting — Reducer 80 × 65 (threaded MI)1nos
Fitting — Socket 100 (threaded)4nos
Fitting — Socket 150 (threaded)5nos
Fitting — Socket 25 (threaded)24nos
Fitting — Socket 32 (threaded)10nos
Fitting — Socket 40 (threaded)10nos
Fitting — Socket 50 (threaded)8nos
Fitting — Socket 65 (threaded)5nos
Fitting — Socket 80 (threaded)1nos
Fitting — Tee 100 × 25 (threaded MI)3nos
Fitting — Tee 100 × 65 (threaded MI)1nos
Fitting — Tee 150 × 25 (threaded MI)2nos
Fitting — Tee 150 × 32 (threaded MI)1nos
Fitting — Tee 150 × 50 (threaded MI)1nos
Fitting — Tee 40 × 25 (threaded MI)1nos
Fitting — Tee 50 × 25 (threaded MI)1nos
Fitting — Tee 50 × 32 (threaded MI)1nos
Fitting — Tee 50 × 40 (threaded MI)1nos
Fitting — Tee 65 × 40 (threaded MI)2nos
Fitting — Tee 80 × 50 (threaded MI)1nos

5. Typical details and legend

Installation details for the head types used, the jointing details of the project scheme (Threaded (screwed) throughout — malleable iron fittings, sockets at every pipe length), the pipe support system (Rigid hangers (threaded rod + clevis / band hanger); RCC slab — anchor fasteners in the soffit) and the legend with the quantities of this project. Not to scale.

1LEGEND AND QUANTITIESNOT TO SCALESymbolDescriptionQtyUnitSPRINKLER HEADSUpright K80 68 °CSR42nosPIPE — MS, threadedPipe 25 mm52mPipe 32 mm25mPipe 40 mm18mPipe 50 mm15mPipe 65 mm9mPipe 80 mm1mPipe 100 mm13mPipe 150 mm11mTotal pipe144mSymbolDescriptionQtyUnitSUPPORTS AND VALVESRigid hanger 150mm — M12 rod,clevis / bandhanger, anchorfastener in the RCCslab5nosRigid hanger 32 mm— M10 rod, clevis /band hanger,anchor fastener inthe RCC slab10nosRigid hanger 25 mm— M10 rod, clevis /band hanger,anchor fastener inthe RCC slab24nos
2LEGEND AND QUANTITIES (CONTD.)NOT TO SCALESymbolDescriptionQtyUnitRigid hanger 40 mm— M10 rod, clevis /band hanger,anchor fastener inthe RCC slab10nosRigid hanger 50 mm— M10 rod, clevis /band hanger,anchor fastener inthe RCC slab8nosRigid hanger 65 mm— M10 rod, clevis /band hanger,anchor fastener inthe RCC slab5nosSymbolDescriptionQtyUnitRigid hanger 100mm — M10 rod,clevis / bandhanger, anchorfastener in the RCCslab4nosRigid hanger 80 mm— M10 rod, clevis /band hanger,anchor fastener inthe RCC slab1nosFloor control valveset (isolation + flowswitch + test &drain)1setsFITTINGSElbow 90° 150(threaded MI)1nos
3LEGEND AND QUANTITIES (CONTD.)NOT TO SCALESymbolDescriptionQtyUnitElbow 90° 32(threaded MI)2nosElbow 90° 40(threaded MI)2nosElbow 90° 65(threaded MI)1nosFloor control valveset 150 (isolation +flow switch + test &drain)1nosHead outlet —Reducing elbow 25× 15 (threaded MI)15nosHead outlet —Reducing elbow 32× 15 (threaded MI)1nosSymbolDescriptionQtyUnitHead outlet —Reducing tee 25 ×15 (threaded MI)9nosHead outlet —Reducing tee 32 ×15 (threaded MI)7nosHead outlet —Reducing tee 40 ×15 (threaded MI)7nosHead outlet —Reducing tee 50 ×15 (threaded MI)3nosReducer 100 × 80(threaded MI)1nosReducer 150 × 100(threaded MI)1nosReducer 32 × 25(threaded MI)8nos
4LEGEND AND QUANTITIES (CONTD.)NOT TO SCALESymbolDescriptionQtyUnitReducer 40 × 32(threaded MI)7nosReducer 50 × 40(threaded MI)3nosReducer 65 × 40(threaded MI)1nosReducer 65 × 50(threaded MI)1nosReducer 80 × 65(threaded MI)1nosSocket 100(threaded)4nosSocket 150(threaded)5nosSocket 25(threaded)24nosSymbolDescriptionQtyUnitSocket 32(threaded)10nosSocket 40(threaded)10nosSocket 50(threaded)8nosSocket 65(threaded)5nosSocket 80(threaded)1nosTee 100 × 25(threaded MI)3nosTee 100 × 65(threaded MI)1nosTee 150 × 25(threaded MI)2nos
5LEGEND AND QUANTITIES (CONTD.)NOT TO SCALESymbolDescriptionQtyUnitTee 150 × 32(threaded MI)1nosTee 150 × 50(threaded MI)1nosTee 40 × 25(threaded MI)1nosTee 50 × 25(threaded MI)1nosTee 50 × 32(threaded MI)1nosTee 50 × 40(threaded MI)1nosTee 65 × 40(threaded MI)2nosTee 80 × 50(threaded MI)1nosSymbolDescriptionQtyUnitBULB TEMPERATURE COLOURS57 °C — orange68 °C — red79 °C — yellow93 °C — green141 °C — blue182 °C — mauveQuantities from the layout take-off (pipe tothe nearest metre); verify against the finaldrawings.
6UPRIGHT SPRINKLER BELOW SLABNOT TO SCALEFFLCeiling 3 mDeflector75–150 mmbelow soffit(typical)RCC slabSprig / risernippleReducing tee,outlet upHanger (seedetail)RangepipeOpen soffit — no false ceilingNOTES1.Deflector 75–150 mm (typical)below the slab soffit(unobstructed construction),parallel to it.2.Sprig from a reducing tee outlet;sprigs over 0.6 m restrained(typical).3.Hanger at least 75 mm from thecentreline of an upright head.4.Beams, ducts and lights in thespray pattern: apply theobstruction rules — add headsbelow wide obstructions.5.Head K-factor, response andtemperature rating per thelegend.Ref: IS 15105 / NBCS 2026 Part Fcl. 5.1.3; NFPA 13 where IS issilent
7THREADED JOINT — TAPER PIPE THREADNOT TO SCALEMake-up (engagement)≤ 1 vanishingthread exposedPTFE tape / sealanton male thread onlyFittingReamed boreThread: IS 554 / ISO 7-1 taper (BSP R / Rp)Thread engagement, mm (typical)DNmmInchTPIHand-tightMake-up151/2148.213203/4149.5142511110.416321-1/41112.718401-1/21112.7185021115.922NOTES1.Threaded joints up to 50 mm; pipeERW black steel, IS 1239 Part 1heavy (IS 3589 above 150 mm);fittings malleable iron, IS 1879.2.Cut square, ream to full bore,remove burrs and oil beforethreading.3.Threads cut to gauge; make uphand-tight plus 2–3 wrench turns(table).4.PTFE tape (2–3 wraps) oranaerobic sealant on the malethread only — none inside thefitting.5.No running threads; no threadexposed beyond the fitting otherthan the last vanishing thread;paint exposed threads.Ref: IS 15105 / NBCS 2026 Part Fcl. 5.1.3; NFPA 13 where IS is silent
8PIPE SUPPORT — RIGID HANGER, RCC SLABNOT TO SCALE≤ 50 mm≥ 65 mmThreaded rod(rod size table)Lock nut +washerBand / swivelring hangerClevishangerExpansion anchor(drop-in / wedge)NOTES1.Rod M10 up to 100 mm pipe,M12 125–200 mm, M16 250–300mm; lock nuts both sides.2.Band / swivel-ring hangers up to50 mm, clevis hangers from 65mm; listed components.3.Listed expansion anchors (drop-inor wedge) in sound concrete;never into blocks or plaster.4.Each hanger good for 5 × thewater-filled pipe weight + 114 kg(NFPA 13).5.Spacing, end-head distance androd sizes: hanger table.Ref: IS 15105 / NBCS 2026 Part Fcl. 5.1.3; NFPA 13 where IS issilent
9HANGER SPACING AND ROD SIZESNOT TO SCALEHanger spacing (table)End-head distanceRANGE PIPE — HANGERS, HEADS AND THE FREE ENDMax hanger spacing — IS15105 / NBC (typical)Pipe DN mmMax m25 – 323.740 – 2004.6End head to last hanger(typical)Pipe DN mmMax m250.9321.2≥ 401.5Hanger rod sizePipe DN mmRod≤ 100M10125 – 200M12250 – 300M161.At least one hanger per pipe length; hanger ≥ 75 mm from an upright head; oneon the cross main between branch lines.2.Risers held at the base and every floor; hang from the structure only — never fromducts, trays or the ceiling grid.Ref: IS 15105 / NBCS 2026 Part F cl. 5.1.3; NFPA 13 where IS is silent

6. Worked examples — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Room Office 1 — head grid (Ordinary hazard (OH) — was OH-II in IS 15105:2002)
largest regular room on Ground; spacing and coverage limits from the hazard table
Given: Room 96 m², long axis 12.00 m × 8.00 m · Limits max spacing S = 4.5 m · max coverage 12 m² per head · min spacing 1.8 m
1. Bays along each axis: nx = ⌈L / S⌉, ny = ⌈W / S⌉ = ⌈12.00 / 4.5⌉, ⌈8.00 / 4.5⌉ = 3 × 2 (bay 4.00 × 4.00 m = 16.00 m²)
2. Coverage too large → add a row along the larger bay: until sx · sy ≤ 12 m² = 4 × 2
3. Spacing: sx = L / nx, sy = W / ny = 12.00 / 4, 8.00 / 2 = 3.00 × 4.00 m (engine 3.0 × 4.0 m)
4. Heads: n = nx · ny = 4 × 2 = 8 (engine 8 heads (heads ½ bay from the walls))
5. Coverage per head: A / n ≤ 12 m² → 96 / 8 = 12.0 m² PASS
6. Spacing: max(sx, sy) ≤ 4.5 m → 4 m PASS
7. Distance to the walls: ½ bay ≤ S / 2 = 2.25 m → 1.50 / 2.00 m PASS
Pipe sizes — Z1, IS 15105:2021 cl. 10 (ordinary hazard)
range / distribution pipes of the same room and the zone's main next to the riser; an up-down pair counts 2 sprinklers (cl. 10.2.2 b)
Given: Method Pre-calculated pipework (cl. 10.3.1 a, 10.4) — LH/OH, sprinklered area 442 m² ≤ 5 000 m² · Method Rooms of a divided occupancy are fed by 32 mm pipes (cl. 10.1 d) · Method Pipes upstream of the design points: friction ≤ 0.5 bar at 1000 L/min (+ 0.00 bar static allowance) — worst path 0.489 bar · Table 20 — range pipes last range: 25 mm ≤ 2, 32 mm ≤ 3, 40 mm ≤ 4, 50 mm ≤ 9 · other ranges: 25 mm ≤ 3, 32 mm ≤ 4, 40 mm ≤ 6, 50 mm ≤ 9 · Table 21 — distribution pipes 32 mm ≤ 3, 40 mm ≤ 6, 50 mm ≤ 9, 65 mm ≤ 18; more sprinklers → calculated (10.4.4 b) · Limits min 25 mm (10.1 f) · range ≤ 50 mm, ≤ 6 sprinklers (9 on 50 mm) (10.1 g, h) · 32 mm feeds to rooms of divided occupancies (10.1 d) · sizes never grow in the flow direction (10.4.1 a)
1. Range P9 (0.6 m) serving n = 4 sprinklers: Table 20 (range) / Table 21 (distribution) → friction rule upstream of the design point = 40 mm
2. Cross P12 (2 m) serving n = 8 sprinklers: Table 20 (range) / Table 21 (distribution) → friction rule upstream of the design point = 50 mm
3. Main P2 (0.25 m) serving n = 42 sprinklers: Table 20 (range) / Table 21 (distribution) → friction rule upstream of the design point = 150 mm (upsized for velocity)
Remote area — Ground · Z1 (Ordinary hazard (OH) — was OH-II in IS 15105:2002)
the governing zone: highest pressure needed at the floor tap
Given: Design 5 mm/min over 360 m², K 80, Pmin 0.5 bar · Most remote head H4-14 in Open office
1. Heads in the remote area: N = ⌈A / (sx · sy)⌉ = ⌈360 / (3.2 × 2.88)⌉ = ⌈39.06⌉ = 40 heads (engine 40)
2. Heads along the range pipe: ⌈1.2 · √A / sx⌉ = ⌈1.2 × √360 / 3.2⌉ = 8 (then the adjacent rows)
3. Required flow at the remote head: qreq = max(D · A / N, K · √Pmin) = max(5 × 360 / 40, 80 × √0.5) = max(45.0, 56.6) = 56.6 L/min (engine 56.6)
4. Remote head discharge: q = K · √P = 80 × √0.5 = 56.6 L/min (engine 56.6 L/min)
5. Flow at the floor tap: Q = Σ K · √Pi over the N heads (head-to-head balance, Hazen–Williams) = 3608.8 L/min (at 3.11 bar, feed 150 mm)
6. Remote area: q ≥ qreq, v ≤ None m/s → 56.6 ≥ 56.6 L/min, vmax 5.78 m/s PASS

7. Standards applied

Reference
IS 15105:2021 Design and installation of fixed automatic sprinkler fire extinguishing systems
IS 3844:1989 Code of practice for installation and maintenance of internal fire hydrants and hose reels
IS 13039:2014 External hydrant systems — provision and maintenance
NBCS 2026 (SP 7:2026) Part F Fire and Life Safety — cl. 5.1.1 (a, f), 5.1.3 (f, g), Tables 7A–7J, 7K, 7M, Table 8, Annex D-6
IS 908:1975 Fire hydrant, stand post type
IS 5290:1993 Landing valves
IS 9668 / IS 12469 Pumps for fire fighting
TAC Fire Protection Manual (sprinkler / hydrant rules)
Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.