SAMPLEStorm-water network auto-design — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A3 landscape).
calc.designlink.in
Storm-water drainage — network design calculation
Sample project — Tower A (synthetic 4.5 ha layout) · auto-design from the layout drawing and the road profiles · rational method · Manning
Generated 28 Nov 2026 16:09 Project code SAMPLE
Catchment
4.5 ha
Peak at outfall
0.99 m³/s
Main drain
4 reaches · 295.0 m · 1 in 250
Sub-drains
16 reaches · 498.0 m
HDPE / box
12 / 4
Formation raise
2 reaches · 60.0 m
Checks
13 / 13
1. Design basis
Item
Basis adopted
Design regime
India — runoff coefficients per NBCS 2026 (SP 7:2026) Part E Sec 2 · runoff C: NBCS 2026 (SP 7:2026) Part E Sec 2 cl. 4.5.11.2 (PDF p. 2640): paved = 40 % concrete roof area (0.9) + 60 % paved podium areas and asphalted roads (0.8) → C 0.84; unpaved = unpaved ground → C 0.3
Rainfall intensity
120.0 mm/hr (rational method Q = C·i·A)
Runoff
paved C 0.84 on 3.0 ha · unpaved C 0.3 on 1.5 ha
Catchment allocation
nearest-node partition of the site inside the convex hull of the nodes (2.52 ha), scaled to the totals
Levels
synthetic finished-level model FL = 12.000 -0.004·x +0.001·y (m) less a 1.3 m depression at E 85, N 150 — sample only; a project reads them from the road plan-and-profile PDF
Manning n
main drain 0.015 · RCC box 0.013 · HDPE 0.01
Main drain
trapezoid z 1.0:1, freeboard 0.3 m, top of bank ≥ 0.15 m below finished level, v ≥ 0.9 m/s, utilisation ≤ 95.0 %, uniform gradient by sweep 1 in 250–2000 (least_depth)
Sub-drains
HDPE (1–3 barrels) where 0.6 m cover fits, else RCC box (freeboard 0.1/0.15 m above the box top, wall ≥ 0.05 m below FL); v 0.75–3.0 m/s; utilisation ≤ 90.0 %; outlet 0.15 m above the main drain invert
Outfall
fixed invert +9.300 m
Reference standard
NBCS 2026 (SP 7:2026) Part E Sec 2 cl. 4.5.11.2 (runoff, Q = 10·C·i·A); CPHEEO Manual on Storm Water Drainage Systems; BS EN 752; FHWA HEC-22 / HEC-15
2. Peak flow at the site outfall
Paved 3.0 ha × C 0.84 + unpaved 1.5 ha × C 0.3 at i = 120.0 mm/hr → 0.99 m³/s (0.840 paved + 0.150 unpaved).
Time of concentration along the longest flow path (from D15 via outlet D10): inlet 10 min + travel 5.2 min (Σ L / v reach by reach, sub-drain then main drain) = 15.2 min. The IDF table gives i = 115.3 mm/hr at tc — the design intensity is on the safe side.
Fig. 1 — rainfall intensity used and the IDF table supplied (synthetic sample IDF, 5-year return period); tc from this network’s own reach velocities.
3. What was read from the drawings
Item
Result
Node labels / leaders
20 labels, 20 leaders, median node → manhole 0.00 m
0 reaches carry an arrow — rule: negative xscale flips the arrow; 0 against the tree
Road georeference
scale 0.0000 m/px;
Fig. 2 — site / network plan: node catchments (nearest-node partition used for the flows, shade ∝ area), sub-drains by form with flow arrows, main open drain and site outfall.
4. Main trapezoidal drain — RCC lined, 1 in 250 uniform, side slope 1.0:1
Designed upward from the fixed outfall invert of +9.300 m. Head invert +10.48, total fall 1.18 m over 295.0 m; velocity 1.58–1.64 m/s; utilisation 26.0–88.4 %; minimum clearance of top of bank below finished level 0.9 m; maximum depth to invert 1.5 m; feasible gradients 1 in 250 – 2000.
Fig. 3 — main open drain longitudinal section: finished road level, top of bank, design water surface and invert at 1 in 250; circles = sub-drain outlet inverts at their junction chainage.
Reach
To
Ch (m)
L m
Q m³/s
b × d (m)
Top w
v m/s
Cap
Util %
IL start
IL end
FL start
FL end
Bank below FL
A01
A02
5.0–80.0
75.0
0.222
1.5 × 0.3 (+0.3)
2.7
1.582
0.855
26.0
10.48
10.18
11.98
11.68
0.9 / 0.9
A02
A03
80.0–160.0
80.0
0.755
1.5 × 0.3 (+0.3)
2.7
1.582
0.855
88.4
10.18
9.86
11.68
11.36
0.9 / 0.9
A03
A04
160.0–240.0
80.0
0.99
2.0 × 0.3 (+0.3)
3.2
1.638
1.131
87.6
9.86
9.54
11.36
11.04
0.9 / 0.9
A04
OF
240.0–300.0
60.0
0.99
2.0 × 0.3 (+0.3)
3.2
1.638
1.131
87.6
9.54
9.3
11.04
10.8
0.9 / 0.9
Section schedule
From
To
Chainage
Length m
Bed width
Liquid depth
Total depth
Top width
Q at end
Capacity
A01
A03
5.0 – 160.0
155.0
1.5
0.3
0.6
2.7
0.755
0.855
A03
OF
160.0 – 300.0
140.0
2.0
0.3
0.6
3.2
0.99
1.131
5. Sub-drain network — 16 reaches on the route as drawn
HDPE structured-wall pipe wherever the available depth allows 0.6 m cover; RCC box drain elsewhere (12 HDPE reaches / 365.0 m, 4 box reaches / 133.0 m). Shaded rows need the formation level raised — see section 7.
Reach
To
L m
Q m³/s
Form
Size
No.
1 in
v m/s
Cap
Util %
IL start
IL end
Top start
Top end
FL start
FL end
Raise m
D01
D02
35.0
0.013
RCC box
0.60 x 0.60 m
1
1200
0.759
0.273
4.623
11.013
10.983
11.612
11.583
11.939
11.948
D02
D03
35.0
0.058
HDPE
DN300
1
350
0.951
0.067
86.205
10.983
10.883
11.283
11.183
11.948
11.92
D03
D04
35.0
0.123
HDPE
DN400
1
350
1.152
0.145
85.15
10.883
10.783
11.283
11.183
11.92
11.885
D04
D05
35.0
0.189
HDPE
DN400
1
150
1.759
0.221
85.283
10.783
10.55
11.183
10.95
11.885
11.85
D05
DRAIN
6.0
0.222
HDPE
DN400
1
100
2.154
0.271
81.952
10.55
10.49
10.95
10.89
11.85
11.84
D06
D07
38.0
0.113
HDPE
DN300
2
400
0.889
0.126
89.643
10.674
10.579
10.974
10.879
11.579
11.587
D07
D08
38.0
0.236
RCC box
0.60 x 0.75 m
1
1200
0.795
0.358
66.028
10.579
10.548
11.329
11.298
11.587
11.554
D08
D09
38.0
0.374
HDPE
DN400
2
150
1.759
0.442
84.489
10.548
10.294
10.948
10.694
11.554
11.516
D09
D10
26.0
0.481
HDPE
DN600
1
200
1.996
0.564
85.15
10.294
10.164
10.894
10.764
11.516
11.49
D10
DRAIN
6.0
0.533
HDPE
DN600
1
175
2.134
0.603
88.378
10.164
10.13
10.764
10.73
11.49
11.48
D11
D12
45.0
0.034
HDPE
DN300
1
500
0.795
0.056
61.196
10.366
10.276
10.666
10.576
11.27
11.225
D12
D13
45.0
0.11
HDPE
DN300
2
400
0.889
0.126
87.688
10.276
10.163
10.576
10.463
11.225
11.18
D13
D14
50.0
0.191
HDPE
DN400
1
150
1.759
0.221
86.395
10.163
9.83
10.563
10.23
11.18
11.13
D14
DRAIN
6.0
0.235
HDPE
DN400
1
100
2.154
0.271
86.75
9.83
9.77
10.23
10.17
11.13
11.12
D15
D16
30.0
0.037
RCC box
2.10 x 0.30 m
1
1500
0.753
0.474
7.699
10.714
10.694
11.014
10.994
10.963
10.843
0.301
D16
D06
30.0
0.068
RCC box
2.10 x 0.30 m
1
1500
0.753
0.474
14.435
10.694
10.674
10.994
10.974
10.843
11.579
0.301
6. Discharge points into the main drain
Every outlet invert is 0.15 m above the main drain invert at its junction chainage; "submerged at peak" means the outlet invert is below the main drain water surface at the design flow — the sub-drain then discharges against a head and its last reach should be checked for backwater.
Outlet
Ch on main
Q
Form
Size
1 in
v
Util %
Outlet IL
Main IL
Main WS
Submerged at peak
D05
40.0
0.222
HDPE
DN400
100
2.154
82.0
10.49
10.34
10.64
yes
D10
130.0
0.533
HDPE
DN600
175
2.134
88.4
10.13
9.98
10.28
yes
D14
220.0
0.235
HDPE
DN400
100
2.154
86.7
9.77
9.62
9.92
yes
7. Site formation level — raise required
Reaches where the drain cannot be contained below the finished road level; the formation level must be raised by the amount listed, or the reach re-routed.
Reach
To
L m
Q
Form
Size
FL start
FL end
Top start
Top end
Raise m
D15
D16
30.0
0.037
RCC box
2.10 x 0.30 m
10.963
10.843
11.014
10.994
0.301
D16
D06
30.0
0.068
RCC box
2.10 x 0.30 m
10.843
11.579
10.994
10.974
0.301
8. The engineering point — depth is the binding constraint
Between finished level and the outlet invert set by the main drain there is typically 0.8–1.5 m. Taking 0.6 m of cover off that, the largest pipe that fits carries about 0.6 m³/s; at 120.0 mm/hr each node contributes 0.2–0.5 m³/s, so flow passes 0.6 m³/s within three or four reaches of any head of system. That is why most of this network is box drain and not HDPE, regardless of preference. The cover requirement is the single lever that moves the HDPE / box split:
Cover to crown
HDPE reaches
RCC box reaches
Fill reaches
0.3 m
13
3
2
0.45 m
14
2
2
0.6 m
12
4
2
0.75 m
13
3
2
0.9 m
8
8
0
9. Validation
Check
Result
Detail
Outfall invert equals the input
PASS
9.300 vs 9.300
No invert below the outfall invert
PASS
lowest 9.300
Main drain invert falls monotonically downstream
PASS
Capacity ≥ Q on every reach
PASS
0 reach(es) without a section
Velocity within limits on every reach
PASS
0.75–2.15 m/s
Every sub-drain invert falls toward its outlet
PASS
Invert continuity at every junction
PASS
Flow continuity at every node
PASS
Main drain outfall Q == Σ outfall discharges
PASS
0.990 vs 0.990
Allocated catchment == site total
PASS
45,000 m²
Rational-method cross-check of total Q
PASS
0.990 m³/s
Main drain top of bank ≥ 0.15 m below finished level
PASS
min 0.900 m
Cover ≥ 0.60 m on every buried pipe except outfall links
PASS
10. Worked examples — from this design
Worked from this project’s own inputs and results — each value can be traced to the schedules above.
Rational method — catchment of node D08 (largest allocated area)
nearest-node share of the site, paved / unpaved split in the site proportion
Given: Area paved 0.4160 ha + unpaved 0.2080 ha = 0.6239 ha · Runoff C paved 0.84 · unpaved 0.3 (NBCS 2026 Part E Sec 2 cl. 4.5.11.2) · Intensity i = 120 mm/hr
4. Agrees with the fill schedule: raise (hand) = raise (engine) → 0.301 vs 0.301 PASS
11. Standards and references
NBCS 2026 (SP 7:2026) Part E Sec 2 — National Building Construction Standards — Drainage and sanitation
cl. 4.5.11.2 (PDF p. 2640) Q = 10·C·i·A and runoff coefficients 0.9 / 0.8 / 0.3 / 0.15; cl. 4.5.11.2.3–4.5.11.2.5 intensity, design frequency, inlet time 5–30 min (PDF p. 2641)
CPHEEO Manual on Storm Water Drainage Systems (2019) — Rational method, IDF and time of concentration, drain sections (pipe / box / open channel), freeboard, outfalls
rational method, IDF and time of concentration, pipe / box / open-channel sections, freeboard, outfalls (India)
IRC SP:50-2013 — Guidelines on urban drainage
road-side drains and hourly maximum rainfall (referred by NBCS cl. 4.5.11.2.3)
Kothyari & Garde (1992), IMD data — Generalised rainfall intensity–duration–frequency relationship for India
generalised IDF relationship for India where no local IDF table is available
BS EN 752:2017 — Drain and sewer systems outside buildings — sewer system management
hydraulic design of drains and sewers outside buildings; design storm and surcharge criteria
rational method Q = C·i·A, IDF, time of concentration, storm drains and outfalls
FHWA HEC-15 Design of Roadside Channels with Flexible Linings — Channel linings — Manning n, permissible shear and velocity, freeboard
channel lining, Manning n, permissible velocity and freeboard of the open drain
ASCE MOP 77 / WEF MOP FD-20 — Design and Construction of Urban Stormwater Management Systems
storm drain, box culvert and open channel sizing
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) from the drawings supplied; levels marked "extrapolated" lie beyond the ends of the road profiles — verify before issue.