SAMPLE Storm-water network auto-design — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A3 landscape).
Design Linkcalc.designlink.in

Storm-water drainage — network design calculation

Sample project — Tower A (synthetic 4.5 ha layout) · auto-design from the layout drawing and the road profiles · rational method · Manning
Generated 28 Nov 2026 16:09
Project code SAMPLE
Catchment
4.5 ha
Peak at outfall
0.99 m³/s
Main drain
4 reaches · 295.0 m · 1 in 250
Sub-drains
16 reaches · 498.0 m
HDPE / box
12 / 4
Formation raise
2 reaches · 60.0 m
Checks
13 / 13

1. Design basis

ItemBasis adopted
Design regimeIndia — runoff coefficients per NBCS 2026 (SP 7:2026) Part E Sec 2 · runoff C: NBCS 2026 (SP 7:2026) Part E Sec 2 cl. 4.5.11.2 (PDF p. 2640): paved = 40 % concrete roof area (0.9) + 60 % paved podium areas and asphalted roads (0.8) → C 0.84; unpaved = unpaved ground → C 0.3
Rainfall intensity120.0 mm/hr (rational method Q = C·i·A)
Runoffpaved C 0.84 on 3.0 ha · unpaved C 0.3 on 1.5 ha
Catchment allocationnearest-node partition of the site inside the convex hull of the nodes (2.52 ha), scaled to the totals
Levelssynthetic finished-level model FL = 12.000 -0.004·x +0.001·y (m) less a 1.3 m depression at E 85, N 150 — sample only; a project reads them from the road plan-and-profile PDF
Manning nmain drain 0.015 · RCC box 0.013 · HDPE 0.01
Main draintrapezoid z 1.0:1, freeboard 0.3 m, top of bank ≥ 0.15 m below finished level, v ≥ 0.9 m/s, utilisation ≤ 95.0 %, uniform gradient by sweep 1 in 250–2000 (least_depth)
Sub-drainsHDPE (1–3 barrels) where 0.6 m cover fits, else RCC box (freeboard 0.1/0.15 m above the box top, wall ≥ 0.05 m below FL); v 0.75–3.0 m/s; utilisation ≤ 90.0 %; outlet 0.15 m above the main drain invert
Outfallfixed invert +9.300 m
Reference standardNBCS 2026 (SP 7:2026) Part E Sec 2 cl. 4.5.11.2 (runoff, Q = 10·C·i·A); CPHEEO Manual on Storm Water Drainage Systems; BS EN 752; FHWA HEC-22 / HEC-15

2. Peak flow at the site outfall

Paved 3.0 ha × C 0.84 + unpaved 1.5 ha × C 0.3 at i = 120.0 mm/hr → 0.99 m³/s (0.840 paved + 0.150 unpaved).

Time of concentration along the longest flow path (from D15 via outlet D10): inlet 10 min + travel 5.2 min (Σ L / v reach by reach, sub-drain then main drain) = 15.2 min. The IDF table gives i = 115.3 mm/hr at tc — the design intensity is on the safe side.

020406080100120050100150Storm duration (min)Rainfall intensity i (mm/hr)synthetic sample IDF, 5-year return perioddesign i = 120 mm/hr (used for every reach)tc = 15.2 min (inlet 10 + travel 5.2)i(tc) = 115.3
Fig. 1 — rainfall intensity used and the IDF table supplied (synthetic sample IDF, 5-year return period); tc from this network’s own reach velocities.

3. What was read from the drawings

ItemResult
Node labels / leaders20 labels, 20 leaders, median node → manhole 0.00 m
Co-located labels moved to a free manholenone
Topology16 nodes, 13 reaches (expected 13), 3 outfalls, unreached 0, doubled-back no
Flow arrows0 reaches carry an arrow — rule: negative xscale flips the arrow; 0 against the tree
Road georeferencescale 0.0000 m/px;
D01 catchment 574 m²D02 catchment 2,059 m²D03 catchment 2,968 m²D04 catchment 2,968 m²D05 catchment 1,516 m²D06 catchment 2,011 m²D07 catchment 5,617 m²D08 catchment 6,239 m²D09 catchment 4,867 m²D10 catchment 2,394 m²D11 catchment 1,564 m²D12 catchment 3,447 m²D13 catchment 3,670 m²D14 catchment 1,995 m²D15 catchment 1,660 m²D16 catchment 1,452 m²SITE OUTFALL IL +9.300D05 → DRAIN: HDPE DN400 1 in 100, Q 0.222 m³/sD04 → D05: HDPE DN400 1 in 150, Q 0.189 m³/sD03 → D04: HDPE DN400 1 in 350, Q 0.123 m³/sD02 → D03: HDPE DN300 1 in 350, Q 0.058 m³/sD01 → D02: RCC box 0.60 x 0.60 m 1 in 1200, Q 0.013 m³/sD10 → DRAIN: HDPE DN600 1 in 175, Q 0.533 m³/sD09 → D10: HDPE DN600 1 in 200, Q 0.481 m³/sD08 → D09: HDPE DN400 ×2 1 in 150, Q 0.374 m³/sD07 → D08: RCC box 0.60 x 0.75 m 1 in 1200, Q 0.236 m³/sD06 → D07: HDPE DN300 ×2 1 in 400, Q 0.113 m³/sD16 → D06: RCC box 2.10 x 0.30 m 1 in 1500, Q 0.068 m³/sD15 → D16: RCC box 2.10 x 0.30 m 1 in 1500, Q 0.037 m³/sD14 → DRAIN: HDPE DN400 1 in 100, Q 0.235 m³/sD13 → D14: HDPE DN400 1 in 150, Q 0.191 m³/sD12 → D13: HDPE DN300 ×2 1 in 400, Q 0.11 m³/sD11 → D12: HDPE DN300 1 in 500, Q 0.034 m³/sD01 · FL 11.939D01D02 · FL 11.948D02D03 · FL 11.92D03D04 · FL 11.885D04D05 · FL 11.85D05D06 · FL 11.579D06D07 · FL 11.587D07D08 · FL 11.554D08D09 · FL 11.516D09D10 · FL 11.49D10D11 · FL 11.27D11D12 · FL 11.225D12D13 · FL 11.18D13D14 · FL 11.13D14D15 · FL 10.963D15D16 · FL 10.843D16A01 · FL 11.98A01A02 · FL 11.68A02A03 · FL 11.36A03A04 · FL 11.04A04HDPE pipeRCC box drainformation raise neededmain open drainoutfall to main drainnode catchment (shade ∝ area)N100 m
Fig. 2 — site / network plan: node catchments (nearest-node partition used for the flows, shade ∝ area), sub-drains by form with flow arrows, main open drain and site outfall.

4. Main trapezoidal drain — RCC lined, 1 in 250 uniform, side slope 1.0:1

Designed upward from the fixed outfall invert of +9.300 m. Head invert +10.48, total fall 1.18 m over 295.0 m; velocity 1.58–1.64 m/s; utilisation 26.0–88.4 %; minimum clearance of top of bank below finished level 0.9 m; maximum depth to invert 1.5 m; feasible gradients 1 in 250 – 2000.

2550751001251501752002252502753009101112Chainage along the main drain (m) — head → site outfallLevel (m)A01A02A03A04OFD05 outlet IL 10.49 (WS 10.64)D10 outlet IL 10.13 (WS 10.28)D14 outlet IL 9.77 (WS 9.92)outfall IL +9.300head IL +10.480 · 1 in 250finished (road) leveltop of bank (freeboard 0.3 m)design water surfaceinvertsub-drain outlet IL (filled = below WS at peak)
Fig. 3 — main open drain longitudinal section: finished road level, top of bank, design water surface and invert at 1 in 250; circles = sub-drain outlet inverts at their junction chainage.
ReachToCh (m)L mQ m³/sb × d (m)Top wv m/sCapUtil %IL startIL endFL startFL endBank below FL
A01A025.0–80.075.00.2221.5 × 0.3 (+0.3)2.71.5820.85526.010.4810.1811.9811.680.9 / 0.9
A02A0380.0–160.080.00.7551.5 × 0.3 (+0.3)2.71.5820.85588.410.189.8611.6811.360.9 / 0.9
A03A04160.0–240.080.00.992.0 × 0.3 (+0.3)3.21.6381.13187.69.869.5411.3611.040.9 / 0.9
A04OF240.0–300.060.00.992.0 × 0.3 (+0.3)3.21.6381.13187.69.549.311.0410.80.9 / 0.9

Section schedule

FromToChainageLength mBed widthLiquid depthTotal depthTop widthQ at endCapacity
A01A035.0 – 160.0155.01.50.30.62.70.7550.855
A03OF160.0 – 300.0140.02.00.30.63.20.991.131

5. Sub-drain network — 16 reaches on the route as drawn

HDPE structured-wall pipe wherever the available depth allows 0.6 m cover; RCC box drain elsewhere (12 HDPE reaches / 365.0 m, 4 box reaches / 133.0 m). Shaded rows need the formation level raised — see section 7.

ReachToL mQ m³/sFormSizeNo.1 inv m/sCapUtil %IL startIL endTop startTop endFL startFL endRaise m
D01D0235.00.013RCC box0.60 x 0.60 m112000.7590.2734.62311.01310.98311.61211.58311.93911.948
D02D0335.00.058HDPEDN30013500.9510.06786.20510.98310.88311.28311.18311.94811.92
D03D0435.00.123HDPEDN40013501.1520.14585.1510.88310.78311.28311.18311.9211.885
D04D0535.00.189HDPEDN40011501.7590.22185.28310.78310.5511.18310.9511.88511.85
D05DRAIN6.00.222HDPEDN40011002.1540.27181.95210.5510.4910.9510.8911.8511.84
D06D0738.00.113HDPEDN30024000.8890.12689.64310.67410.57910.97410.87911.57911.587
D07D0838.00.236RCC box0.60 x 0.75 m112000.7950.35866.02810.57910.54811.32911.29811.58711.554
D08D0938.00.374HDPEDN40021501.7590.44284.48910.54810.29410.94810.69411.55411.516
D09D1026.00.481HDPEDN60012001.9960.56485.1510.29410.16410.89410.76411.51611.49
D10DRAIN6.00.533HDPEDN60011752.1340.60388.37810.16410.1310.76410.7311.4911.48
D11D1245.00.034HDPEDN30015000.7950.05661.19610.36610.27610.66610.57611.2711.225
D12D1345.00.11HDPEDN30024000.8890.12687.68810.27610.16310.57610.46311.22511.18
D13D1450.00.191HDPEDN40011501.7590.22186.39510.1639.8310.56310.2311.1811.13
D14DRAIN6.00.235HDPEDN40011002.1540.27186.759.839.7710.2310.1711.1311.12
D15D1630.00.037RCC box2.10 x 0.30 m115000.7530.4747.69910.71410.69411.01410.99410.96310.8430.301
D16D0630.00.068RCC box2.10 x 0.30 m115000.7530.47414.43510.69410.67410.99410.97410.84311.5790.301

6. Discharge points into the main drain

Every outlet invert is 0.15 m above the main drain invert at its junction chainage; "submerged at peak" means the outlet invert is below the main drain water surface at the design flow — the sub-drain then discharges against a head and its last reach should be checked for backwater.

OutletCh on mainQFormSize1 invUtil %Outlet ILMain ILMain WSSubmerged at peak
D0540.00.222HDPEDN4001002.15482.010.4910.3410.64yes
D10130.00.533HDPEDN6001752.13488.410.139.9810.28yes
D14220.00.235HDPEDN4001002.15486.79.779.629.92yes

7. Site formation level — raise required

Reaches where the drain cannot be contained below the finished road level; the formation level must be raised by the amount listed, or the reach re-routed.

ReachToL mQFormSizeFL startFL endTop startTop endRaise m
D15D1630.00.037RCC box2.10 x 0.30 m10.96310.84311.01410.9940.301
D16D0630.00.068RCC box2.10 x 0.30 m10.84311.57910.99410.9740.301

8. The engineering point — depth is the binding constraint

Between finished level and the outlet invert set by the main drain there is typically 0.8–1.5 m. Taking 0.6 m of cover off that, the largest pipe that fits carries about 0.6 m³/s; at 120.0 mm/hr each node contributes 0.2–0.5 m³/s, so flow passes 0.6 m³/s within three or four reaches of any head of system. That is why most of this network is box drain and not HDPE, regardless of preference. The cover requirement is the single lever that moves the HDPE / box split:

Cover to crownHDPE reachesRCC box reachesFill reaches
0.3 m1332
0.45 m1422
0.6 m1242
0.75 m1332
0.9 m880

9. Validation

CheckResultDetail
Outfall invert equals the inputPASS9.300 vs 9.300
No invert below the outfall invertPASSlowest 9.300
Main drain invert falls monotonically downstreamPASS
Capacity ≥ Q on every reachPASS0 reach(es) without a section
Velocity within limits on every reachPASS0.75–2.15 m/s
Every sub-drain invert falls toward its outletPASS
Invert continuity at every junctionPASS
Flow continuity at every nodePASS
Main drain outfall Q == Σ outfall dischargesPASS0.990 vs 0.990
Allocated catchment == site totalPASS45,000 m²
Rational-method cross-check of total QPASS0.990 m³/s
Main drain top of bank ≥ 0.15 m below finished levelPASSmin 0.900 m
Cover ≥ 0.60 m on every buried pipe except outfall linksPASS

10. Worked examples — from this design

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Rational method — catchment of node D08 (largest allocated area)
nearest-node share of the site, paved / unpaved split in the site proportion
Given: Area paved 0.4160 ha + unpaved 0.2080 ha = 0.6239 ha · Runoff C paved 0.84 · unpaved 0.3 (NBCS 2026 Part E Sec 2 cl. 4.5.11.2) · Intensity i = 120 mm/hr
1. Weighted runoff coefficient: C = (Cp·Ap + Cu·Au) / A = (0.84 × 0.4160 + 0.3 × 0.2080) / 0.6239 = 0.66
2. Peak runoff: Q = C · i · A / 360 = 0.660 × 120 × 0.6239 / 360 = 0.1373 m³/s
3. Same in the NBCS form: Q = 10 · C · i · A (m³/h) = 10 × 0.660 × 120 × 0.6239 = 494.2 m³/h (÷ 3600 = 0.1373 m³/s)
4. Agrees with the catchment schedule: Q (hand) = Q (engine) → 0.1373 vs 0.1373 m³/s PASS
5. Whole site at the outfall: Q = (Cp·Ap + Cu·Au) · i / 360 = (0.84 × 3.0 + 0.3 × 1.5) × 120 / 360 = 0.99 m³/s (design peak 0.99 m³/s)
Manning — main open drain, last reach A04 → OF (largest flow)
RCC-lined trapezoid at the uniform design gradient
Given: Section bed b = 2.0 m, liquid depth d = 0.3 m, side slope z = 1.0:1, freeboard 0.3 m · Gradient 1 in 250 · n 0.015 · Design flow Q = 0.99 m³/s
1. Flow area: A = (b + z·d)·d = (2.0 + 1.0 × 0.3) × 0.3 = 0.69 m²
2. Wetted perimeter: P = b + 2d·√(1 + z²) = 2.0 + 2 × 0.3 × √(1 + 1.0²) = 2.849 m
3. Hydraulic radius: R = A / P = 0.690 / 2.849 = 0.2422 m
4. Velocity: v = (1/n)·R2/3·S1/2 = (1/0.015) × 0.24222/3 × (1/250)1/2 = 1.638 m/s
5. Capacity: Qcap = A·v = 0.690 × 1.638 = 1.131 m³/s
6. Capacity: Q ≤ Qcap and utilisation ≤ 95.0 % → 0.99 ≤ 1.131 (87.6 %) PASS
7. Velocity: 0.9 ≤ v ≤ 3.0 m/s → 1.638 m/s PASS
8. Top of bank below finished level: FL − (IL + d + FB) ≥ 0.15 m → 10.8 − (9.3 + 0.3 + 0.3) = 0.900; min on the reach 0.900 m PASS
9. Agrees with the main-drain schedule: A·v (hand) = capacity (engine) → 1.131 vs 1.131 PASS
Sub-drain D10 → DRAIN — HDPE DN600 (largest flow carried in HDPE)
the chooser takes the smallest diameter, then the flattest gradient, that keeps cover, velocity and utilisation
Given: Reach L = 6.0 m, Q = 0.533 m³/s, 1 in 175 · Levels FL 11.49 → 11.48, IL 10.164 → 10.13 · n 0.01
1. Full-bore velocity: v = (1/n)·(D/4)2/3·S1/2 = (1/0.01) × (0.6/4)2/3 × (1/175)1/2 = 2.134 m/s
2. Capacity: Qcap = N · (π D²/4) · v = 1 × 0.2827 × 2.134 = 0.603 m³/s
3. Utilisation: Q / Qcap ≤ 90.0 % → 88.3 % PASS
4. Velocity: 0.75 ≤ v ≤ 3.0 m/s → 2.134 PASS
5. Cover to crown: FL − (IL + D) ≥ 0.6 m (outfall link 0.15 m) → up 0.726 m · down 0.750 m (≥ 0.15) PASS
Sub-drain D01 → D02 — why RCC box 0.60 x 0.60 m and not HDPE (smallest flow that still needed a box)
HDPE is tried first (1–3 barrels); the box is the fallback when no pipe fits the depth available
Given: Reach L = 35.0 m, Q = 0.013 m³/s · Levels FL 11.939 → 11.948, downstream IL 10.983
1. Depth available for a pipe at the downstream end: h = FLdn − ILdn − cover = 11.948 − 10.983 − 0.6 = 0.365 m
2. HDPE option: some DN 300–1600 fits with cover and v ≥ 0.75 m/s → none in the size set (no pipe fits the depth → RCC box)
3. Box flowing full: A = w·d, R = A / (w + 2d), v = (1/n)·R2/3·S1/2 = 0.6 × 0.6, R = 0.2000, 1 in 1200, n 0.013 = 0.759 m/s
4. Capacity: Qcap = A·v = 0.360 × 0.759 = 0.273 m³/s (utilisation 4.8 %)
5. Box below finished level: FL − (IL + d) ≥ wall 0.05 + freeboard 0.15 = 0.20 m → up 0.326 · down 0.365 m PASS
Formation raise — D15 → D16 (largest raise, 0.301 m)
no HDPE or box fits below the finished level, so the box is sized on hydraulics alone (shallowest, flattest) and the formation is raised
Given: Box 2.10 x 0.30 m at 1 in 1500, L = 30.0 m · Clearance wall 0.05 m + freeboard 0.1 m (d ≤ 0.45 m) = 0.15 m
1. Needed at the upstream end: ILup + d + clearance − FLup = 10.714 + 0.3 + 0.15 − 10.963 = 0.201 m
2. Needed at the downstream end: ILdn + d + clearance − FLdn = 10.694 + 0.3 + 0.15 − 10.843 = 0.301 m
3. Formation raise: raise = max(up, down, 0) = max(0.201, 0.301, 0) = 0.301 m
4. Agrees with the fill schedule: raise (hand) = raise (engine) → 0.301 vs 0.301 PASS

11. Standards and references

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) from the drawings supplied; levels marked "extrapolated" lie beyond the ends of the road profiles — verify before issue.