SAMPLESTP design — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
2.00 × 12.00 × 4.25 m (required 102 m³) · SOR 35 m³/m²·d → 45.7 m² total, media 34.3 m³
CWT — Clear water tank
133
m³
2.47 × 12.00 × 4.50 m (required 133 m³) · HRT 2 h
FWT — Flushing / treated water tank
444
m³
8.23 × 12.00 × 4.50 m (required 444 m³) · 1 day of flushing demand (NBCS cl. 4.4.10 (3))
SWT — Soft water tank
240
m³
4.44 × 12.00 × 4.50 m (required 240 m³) · one day of soft-water demand
Levels (GL = 0)
Item
Value
Unit
Note / basis
Incoming sewer
DN 300 at IL -1.000
m
Screen channel floor
-1.1
m
O&G top water level
-0.95
m
EQT top water level / floor
-1.275 / -5.775
m
Tank T.O.S. / walkway
-0.0
m
Soffit / walkway grating
-0.25
m
Common top water level
-0.75
m
Common tank floor
-5.25
m
Bottom of raft
-6.89
m
Plant room F.F.L.
-6.24
m
Plant room sump I.L.
-7.44
m
Raw sewage transfer pumps
dry, flooded suction
Layout
Item
Value
Unit
Note / basis
Space (largest rectangle)
26.0 × 60.0
m
at 90.0°
Arrangement
central plant room, tanks both sides
Footprint used
25.94 × 35.9
m
Tank block / plant room width
12.0 / 11.0
m
Plant room
25.34 × 11.0
m
FFL -6.243
Rows
SHT,OG,SC (4.05 m) | EQT (12.35 m) | ANX-A,MBBR-1-A (3.51 m) | MBBR-2-A (2.24 m) | TS-A (2.0 m) | ANX-B,MBBR-1-B (3.51 m) | MBBR-2-B (2.24 m) | TS-B (2.0 m) | CWT (2.47 m) | FWT (8.23 m) | SWT (4.44 m)
Air, sludge, power
Item
Value
Unit
Note / basis
Oxygen demand
784.0
kg/day
Aeration air
941.62
m³/h
Mixing air (EQT + SHT)
632.08
m³/h
Sludge
313 kg/d = 30.9
m³/day
Connected / running load
184 / 124
kW
Plant room ventilation
15,400
CFM
15 ACH, louvers ≈ 2.9 m² each
Quantities (indicative)
Item
Value
Unit
Note / basis
Footprint
919.9
m²
RCC walls / raft / top
560.3 / 322.0 / 230.0
m³
RCC total
1112.3
m³
Excavation
6862.0
m³
Wall sleeves / puddle flanges
52
nos
41 with puddle flange
3. Flow schematic
4. Layout
5. Schedules
Schedule of RCC tanks
Mark
Description
m³ provided
m³ required
L × W × WD (m)
TWL (m)
Floor (m)
SHT
Sludge holding tank (air mixed)
123.4
123.4
4.05 × 6.77 × 4.50
-0.750
-5.250
OG
Oil & grease chamber (baffle wall, belt oil skimmer)
16.7
16.7
4.05 × 3.43 × 1.20
-0.950
-2.150
SC
Screen chamber (SS bar screen, manual + mechanical)
1.5
2.4
4.05 × 1.20 × 0.30
-0.800
-1.100
EQT
Equalisation cum collection tank (air mixed)
666.7
666.7
12.35 × 12.00 × 4.50
-1.275
-5.775
ANX-A
Anoxic tank
66.7
66.7
3.51 × 4.22 × 4.50
-0.750
-5.250
MBBR-1-A
MBBR stage 1 (media 15 %, fine-bubble diffusers)
116.7
116.7
3.51 × 7.47 × 4.45
-0.800
-5.250
MBBR-2-A
MBBR stage 2 (media 15 %, fine-bubble diffusers)
116.7
116.7
2.24 × 12.00 × 4.35
-0.900
-5.250
TS-A
Tube settler (hopper bottom, launder, tube media)
102.0
102.0
2.00 × 12.00 × 4.25
-1.000
-5.250
ANX-B
Anoxic tank
66.7
66.7
3.51 × 4.22 × 4.50
-0.750
-5.250
MBBR-1-B
MBBR stage 1 (media 15 %, fine-bubble diffusers)
116.7
116.7
3.51 × 7.47 × 4.45
-0.800
-5.250
MBBR-2-B
MBBR stage 2 (media 15 %, fine-bubble diffusers)
116.7
116.7
2.24 × 12.00 × 4.35
-0.900
-5.250
TS-B
Tube settler (hopper bottom, launder, tube media)
102.0
102.0
2.00 × 12.00 × 4.25
-1.000
-5.250
CWT
Clear water tank
133.3
133.3
2.47 × 12.00 × 4.50
-1.443
-5.943
FWT
Flushing / treated water tank
444.4
444.4
8.23 × 12.00 × 4.50
-0.750
-5.250
SWT
Soft water tank
240.0
240.0
4.44 × 12.00 × 4.50
-0.750
-5.250
List of electromechanical units
Mark
Description
Nos
Duty
Head m
kW (est.)
Basis
RSTP
Raw sewage transfer pumps (EQT → anoxic / reactor), non-clog, dry-installed with flooded suction
5
40 m³/h
8.0
1.59
1600/20 h = 80 m³/h in 2 streams, 2 W + 1 S
AB
Air blowers for aeration (twin-lobe / tri-lobe), fine-bubble diffusers
6
235.4 m³/h
5.0
5.35
942 m³/h total, 2 set(s) of 2 W + 1 S at 5 m WC
AB-M
Air blower for EQT & SHT mixing (coarse bubble)
2
632.08 m³/h
5.0
14.35
0.8 × (667 + 123) m³ = 632 m³/h, 1 W + 1 S
DIFF
Fine-bubble disc diffusers (EPDM)
157
6 m³/h each
MEDIA
MBBR media (PP / PVA gel)
1
70 m³
400 m²/m³
TSM
Tube settler media (PVC chevron)
1
34.29 m³
SM
Submersible mixers in EQT
3
2.5 kW each
7.5
1 per 250 m³
SKM
Belt-type oil skimmer (O&G chamber)
1
0.37 kW
0.37
BS
Bar screen — SS304 manual (coarse 20 mm) + fine 6 mm
1
0.05 m² opening
FFP
Filter feed pumps (CWT → MGF / ACF)
2
80 m³/h
30
11.89
1 W + 1 S at 3 kg/cm² (1.5 filtration + 0.5 loss + margin)
MGF
Multigrade sand filter, 2525 mm dia, FRP / MSEP
1
80 m³/h
rate 16 m/h → 5.00 m²
ACF
Activated carbon filter, 2525 mm dia
1
80 m³/h
rate 16 m/h
UF
Ultrafiltration plant (1333 m² at 60 LMH) with UFFP feed pumps 1 W + 1 S
9. Blower duty: per working blower (from the set split in the schedule) = 942 m³/h total, 2 set(s) of 2 W + 1 S at 5 m WC = 235.4 m³/h(6 nos at 5 m WC)
Screen chamber: area of opening = Q_peak / v = 166.7/3600/0.9 = 0.051 m² (CPHEEO 0.6–1.2 m/s); channel 1.0 × 2.0 m at ≤ 0.3 m/s approach, water depth 1.2 m + 0.5 free board
O&G chamber: V = Q_peak × t = 2.78 m³/min × 6 min = 16.7 m³ (KSPCB 5–10 min); depth 1.2 m → 6.9 × 2 m
Flushing water (NBCS 2026 Part E Sec 1 cl. 4.4.10 (3), 4.1.1.1): population 14815 (= 1600 kL/d ÷ (0.8 × 135 lpcd)) × 30 lpcd = 444.4 kL/day → treated-water tank 1 day = 444 m³; flushing OHT ½ day = 222 m³ (in the buildings)
Raw sewage transfer pumps: 1600 / 20 h = 80 m³/h → 2 × 40 m³/h (2 W + 1 S); head = tank height 5.3 × 1.2 = 6.4 → 8 m
Chlorine dosing: 80000 L/h × 5 mg/L / 10000 ppm = 40.0 L/h; tank 1000 L (1 day)
Largest rectangle inside the space: 60.0 × 26.0 m at 0° (area 1560 m² of 1560 m²)
Hydraulic profile: incoming sewer DN 300 at invert -1.000 → screen channel floor -1.100, water -0.800 (flow depth 0.30 m); screen loss 0.15 → O&G water -0.950, floor -2.150; outlet DN 300 invert -1.175, free fall 0.10 → EQT top water -1.275, 0.53 m below the common top water level -0.750, floor -5.775
Raw sewage transfer pumps: dry-installed in the plant room with flooded suction from the EQT
Clear water tank lowered to top water -1.443 so the settler launders drain to it by gravity at ≥ 1:300 through the plant room
Layout: central plant room with tanks on both sides; tank block 12.00 m wide, plant room 11.00 × 25.34 m; footprint 25.94 × 35.90 m
Quantities: footprint 920 m²; RCC walls 81.3 m² × 6.89 m = 560 m³; slabs 552 m³; excavation 6862 m³
9. Notes
Effluent standard: BOD < 5, SS < 5, COD < 50 mg/L (reuse).
Technology per NBCS 2026 Part E Sec 2 cl. 4.13.3; a packaged STP (PSTP) shall comply with IS 18797:2024 (cl. 4.13.3 (j)).
Peak factor and unit HRTs as the reference sheet (CPHEEO / NCRPB / KSPCB); confirm with the pollution control board consent conditions.
Reactor sizing is process-level (BOD loading / F/M); the vendor's process guarantee governs media, diffuser and membrane quantities.
Structural design of the RCC tanks to IS 3370 by the structural engineer; thicknesses here are for layout and quantities.
Plant room widened from 8 m to 11 m to take the equipment with 1 m aisles.
Plant-room ventilation: 1740 m³ × 15 ACH = 15,365 CFM — fresh-air and exhaust louvers ≈ 2.9 m² each at 2.5 m/s.
Sleeve levels are centre-lines (CL) and inverts (IL) relative to GL ±0; puddle flanges wherever the sleeve is below or within 300 mm of the top water level.
10. Standards and references
NBCS 2026 (SP 7:2026) Part E Sec 2 — National Building Construction Standards — Drainage and sanitation: Sanitary fixtures by occupancy (Tables 1–17), DFU, stacks, vents, building drains, rainwater pipes (Table 25)
NBCS 2026 (SP 7:2026) Part E Sec 1 — National Building Construction Standards — Water supply: Per-capita demand, storage, fixture units and probable flow, pressures and zoning
CPHEEO Manual on Sewerage and Sewage Treatment (2013) Part A ch. 5 — Screens, grit, settling and biological treatment design parameters: Screen velocity 0.6–1.2 m/s, anoxic detention, secondary settling SOR (Table 5.8), F/M and MLSS ranges
NBCS 2026 (SP 7:2026) Part E Sec 2 — National Building Construction Standards — Drainage and sanitation: Sanitary fixtures by occupancy (Tables 1–17), DFU, stacks, vents, building drains, rainwater pipes (Table 25)
NCRPB Functional Plan — Water & Sewerage — National Capital Region Planning Board — sewerage norms: Peak factor 2.5 (para 3.2.5)
KSPCB STP design guidelines — Karnataka State Pollution Control Board — STP design and O&M: O&G chamber retention 5–10 min
CPCB / NGT 2019 (as amended) — Standards for sewage treatment plant effluent: Treated effluent BOD / SS / COD limits for reuse and discharge
H. H. Bengtson, MBBR Wastewater Treatment Process — Moving-bed biofilm reactor design: Surface area loading rate (BLR) for media sizing
IS 3370:2021 (Parts 1–4) — Concrete structures for retaining aqueous liquids: RCC water tank walls / slabs, minimum thickness and crack control (quantities are indicative)
IS 18797:2024 — Packaged sewage treatment plants — specification: Packaged / prefabricated STP where a septic tank is not permitted (NBCS 2026 Part E Sec 2)
IS 18797:2024 — Packaged sewage treatment plants: design, structural integrity, installation, O&M (NBCS 2026 Part E Sec 2 cl. 4.13.3 (j))
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.