SAMPLE MEP supports — tray / duct / pipe spans, members, anchors — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

MEP supports — tray / duct / pipe spans, members, anchors

Sample project — Tower A · Structure & architecture
Generated 28 Nov 2026 16:09
Load per metre of the service, support span from the deflection / stress limit of the sect…
Project code SAMPLE
Load per support
234.0 kg
Cross-member
ISA 65x65x6
Deflection
0.792 mm
Hanger rod
M10
Anchor
M8 × 1
Max spacing
2.709 m

1. Inputs

GroupInputValueUnit
ServiceServiceCable tray / ladder (loaded)
ServiceTrayladder 600 mm — 48 kg/m
ServiceTrays on the support (tiers)2
ServiceExtra allowance (person / future)90kg
SupportArrangementTrapeze on two hanger rods
SupportSupport spacing (along the run)1.5m
SupportCross-member length (between rods / cantilever)900mm
SupportCross-memberAuto — lightest that passes
SupportSteel design methodIS 800:2007 limit state — γm0 1.10, load factor 1.5 (NBCS Part C Sec 6A)
SupportLoad factor γf (dead + imposed)1.5
SupportSteel yield250MPa
SupportDeflection limit L/240
SupportHanger rodAuto
SupportAnchors per rod / bracket1
SupportConcrete gradeM25
SupportSafety factor on anchor loads1.5

2. Results

Loads

ItemValueUnitNote / basis
Service2 × ladder 600 loaded
Load per metre96kg/m
Support spacing1.5m
Point allowance90.0kg
Load on one support234.0kg= 96.0 × 1.5 + 90
Factored load Wu = γf·W3.44kNIS 800:2007 Table 4, DL + IL

Cross-member

ItemValueUnitNote / basis
Design methodIS 800:2007 limit state (γm0 1.10, γf 1.5)NBCS 2026 Part C Sec 1 cl. 6.3 → Part C Sec 6A (IS 800:2007)
Arrangementtrapeze (simply supported, load at mid-span)
Bending moment (service)0.5165kN·m
Design moment Mu = γf·M0.7747kN·m
Design bending strength fy/γm0227.27MPaMd = Ze·fy/γm0, IS 800:2007 cl. 8.2.1.2 (elastic Z, laterally supported)
Z required3.41cm³
SectionISA 65x65x6 — Z 5.1 cm³, I 22.0 cm⁴, 5.8 kg/m
Deflection (service load)0.7924mmlimit L/240 = 3.8 mm
Maximum support spacing with ISA 65x65x62.71mbending 350 kg / deflection 1,107 kg per support

Rods and anchors

ItemValueUnitNote / basis
Load per rod / bracket1.26kNservice, incl. 10 % self-weight
RodM10 — Tdb 16.7 kN (IS 800:2007 cl. 10.3.5, class 4.6)≥ γf × 1.26 = 1.89 kN
Anchor tension / shear (service)1.26 / 0.00kN
AnchorM8: 2.4 kN tension, 3.6 kN shear (M25)recommended (service) loads, ETAG / ETA — not IS 800
Utilisation with SF0.7891N/Nrd + V/Vrd ≤ 1

Section check (first OK is selected)

SectionKindkg/mZ cm³Z reqδ mmδ limitCheck
ISA 40x40x5angle3.01.553.45.83.8—
ISA 50x50x6angle4.53.03.41.93.8—
ISA 65x65x6angle5.85.13.40.83.8OK
ISA 75x75x6angle6.87.03.40.53.8OK
ISA 100x100x8angle12.117.03.40.23.8OK
Strut 41x21x2.5strut1.30.93.417.43.8—
Strut 41x41x2.5strut2.33.03.42.83.8—
Strut 41x82x2.5 (back-to-back)strut4.68.53.40.53.8OK
ISMC 75channel7.120.03.40.23.8OK
ISMC 100channel9.637.03.40.13.8OK
ISMC 125channel13.167.03.40.03.8OK
ISMC 150channel16.8105.03.40.03.8OK
ISMC 200channel22.3181.03.40.03.8OK
ISMB 100beam11.551.03.40.13.8OK
ISMB 150beam15.096.03.40.03.8OK
ISMB 200beam25.4223.03.40.03.8OK
Trapeze on hanger rods — ISA 65x65x6, L = 900 mmrod 1.26 kN(service, +10 %)Wu = 1.5 × 2.30 = 3.44 kNL = 900 mmMu = Wu·L/4 = 0.775 kN·mBMDSupport spacing vs load — ISA 65x65x60200400600800100000.511.522.533.5support spacing s, mload per support, kgbending limit 350 kgdeflection limit 1,107 kgW = 96.0·s + 90s max 2.71 mdesign 1.5 m → 234 kg

3. Checks

CheckResultNote
Bending: Z 5.1 ≥ 3.4 cm³ (LSM)PASS
Deflection 0.8 ≤ L/240PASS
Rod M10: 16.7 ≥ 1.89 kNPASS
Anchor M8 utilisation 0.79 ≤ 1PASS

4. Worked example

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Support at 1.5 m spacing — 2 × ladder 600 loaded, trapeze
this project's own inputs; IS 800:2007 limit state
Given: Load w = 96.0 kg/m, s = 1.5 m, P = 90 kg · Member L = 900 mm, fy = 250 MPa, E = 200 GPa, L/240
1. Load on one support: W = w·s + P = 96.0 × 1.5 + 90 = 234 kg × 9.81/1000 = 2.296 kN
2. Factored load: Wu = γf·W = 1.5 × 2.296 = 3.44 kN (IS 800:2007 Table 4)
3. Design moment: Mu = Wu·L/4 = 3.443 × 0.9 / 4 = 0.775 kN·m
4. Z required: Z = Mu·γm0/fy = 0.775×10⁶ / 227.3 / 10³ = 3.4 cm³ (cl. 8.2.1.2, elastic Z)
5. Section: Z ≥ Zreq → ISA 65x65x6: 5.1 ≥ 3.4 cm³ PASS
6. Deflection (service): δ = W·L³/(48·E·I) = 2,296 × 900³ / (48 × 200 000 × 22.0×10⁴) = 0.8 mm
7. Deflection: δ ≤ L/240 → 0.8 ≤ 3.8 mm PASS
8. Rod design tension: Tdb = 0.9·fub·An/γmb = 0.9 × 400 × 58 / 1.25 / 1000 = 16.7 kN (cl. 10.3.5)
9. Rod: Tdb ≥ γf·W/2·1.1 → 16.7 ≥ 1.89 kN PASS
10. Anchor (service, SF 1.5): (N/Nrec + V/Vrec)·SF ≤ 1 → (1.26/2.4 + 0.00/3.6) × 1.5 = 0.79 PASS
11. Max spacing: smax = (Wcap − P)/w = (350 − 90) / 96.0 = 2.71 m (ISA 65x65x6, governed by bending)

5. Notes

6. Standards and references

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.