SAMPLEUGT / WTP & pump room — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
UGT / WTP & pump room
Sample project — Tower A · Storage, fire tank & pumps (NBCS 2026), treatment, layout
2. Shaft power: P = 9.81 · Q · H / η = 9.81 × 900 / 60000 × 75 / 0.6 = 18.39 kW(engine 18.39 kW)
3. Main fire pump: Q = NBCS 2026 Table 7K pump for CL-3 or entered = pump = total × 1.2 (overflow) ÷ 1.4 (140 % operating point), next Indian Standard size = 1892 LPM(at 110 m (≥ 3.5 bar at the remote hydrant))
4. Fire pump shaft power: P = 9.81 · Q · H / η = 9.81 × 1892 / 60000 × 110 / 0.65 = 52.35 kW(engine 52.35 kW)
Storage = 345.6 × 2 day = 691.2 kL; UG sump 2 d → 691.2 kL, overhead 0 d → 0.0 kL (NBCS 2026 Part E Sec 1 cl. 4.4.10 (p. 2527–2528): UGT 2 days (200 %), no OHT — hydro-pneumatic / pressurised supply from the UGT, cl. 4.4.10 Note 3)
Raw water tank = 691.2 × 0.50 = 345.6 kL; treated domestic tank = 345.6 kL
NBCS 2026 Part F Table 7E (PDF p. 2804): Business — human occupied (E), height 45 m, floor area 2000 m² → level of protection CL-3
Table 7K (p. 2820) CL-3 (Low hazard): sprinkler 6.1 mm/min × 230 m² = 1403 L/min + hose 285 L/min × 3 = 855 L/min → total 2258 L/min; pump 1892 L/min × 1 (pump = total × 1.2 (overflow) ÷ 1.4 (140 % operating point), next Indian Standard size)
Fire water = 2258 L/min × 30 min = 67.7 kL (range 30–60 min → 67.7–135.5 kL; Table 7K Notes 2–3)
Fire static tank (given) = 600 kL; NBCS 2026 CL-3 asks ≥ 68 kL
Fire compartments = ceil(600 / 200) = 3 (min 2) × 200.0 kL, interconnected with fire-brigade inlet and draw-out
Plan area of each tank = volume / water depth 3.5 m: T-RAW 98.7 m², T-DOM 98.7 m², T-F1 57.1 m², T-F2 57.1 m², T-F3 57.1 m²
Filter feed pumps: 345.6 kL/day ÷ 8 h = 720 LPM (1 W + 1 S) at 35 m
MGF / ACF diameter: A = Q/v = 43.2 m³/h ÷ 16 m/h = 2.70 m² → d = √(4A/π) = 1900 mm (rounded up to 100)
Hydro-pneumatic pumps: 345.6 kL ÷ 16 h × peak 2.5 = 900 LPM (1 W + 1 S) at 75 m
Fire pumps (NBCS 2026 CL-3): main 1892 LPM at 110 m — electric + diesel standby per system, jockey 180 LPM; 3 system(s)
Largest rectangle inside the space: 83.5 × 13.7 m at 0° (area 1139 m² of 1176 m²)
Strip along 83.5 m: domestic bank 15.5 m + pump room 29.0 m + fire bank 13.8 m + 4 walls = 59.5 m → slack 24.0 m to the pump room
Quantities: footprint 930 m²; walls 69.4 m² × 4.35 m = 302 m³; slabs 512 m³; excavation 6334 m³ (0.6 m working space)
10. Notes
NBCS 2026: the duration (30–60 min for CL-3) is decided by hazard, fire preparedness and local conditions — 30 min used; confirm with the fire authority. Fire water = demand × duration from Table 7K / 7M (Note 3).
NBCS 2026 Table 7K CL-3: the tabulated pump 1892 L/min × 1 is below the table's own rule (pump = total × 1.2 (overflow) ÷ 1.4 (140 % operating point), next Indian Standard size) = 1935 L/min — consider the next Indian Standard size.
NBCS 2026 (SP 7:2026) Part F: level of protection from the occupancy table, demand and pump from Table 7K / 7M; check the local bye-laws for the edition in force.
Overhead tanks: domestic 0 kL (0 day) — sized here for reference only.
RCC thicknesses are for layout / quantity purposes; the structural engineer designs the tank to IS 3370.
Puddle-flange levels are bottom-of-pipe (B.O.P.) relative to GL = 0; adjust the inlet levels to the incoming main.
11. Standards and references
NBCS 2026 (SP 7:2026) Part F — National Building Construction Standards — Fire and life safety: Means of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
NBCS 2026 (SP 7:2026) Part E Sec 1 — National Building Construction Standards — Water supply: Per-capita demand, storage, fixture units and probable flow, pressures and zoning
NBC 2016 Part 4 — National Building Code — Fire and life safety: Occupant load (Table 5), exit width (Table 22), travel distance (Table 21), stair widths
CPHEEO Manual on Water Supply & Treatment (1999 / 2024) — Manual on Water Supply and Treatment: Per-capita demand, peak factors, distribution velocity and residual pressure
CPHEEO Manual on Water Supply and Treatment — Rapid gravity / pressure filter rates, chlorination doses: MGF / ACF filtration rate 10–20 m/h, chlorine dose 2–3 mg/L, ozone 1–3 g/m³
IS 1172:1993 — Basic requirements for water supply, drainage and sanitation: Per-capita water requirement for storage sizing
IS 2065:1983 — Code of practice for water supply in buildings: Building water supply, risers, storage
IS 12469:1988 — Pumps for fire fighting systems: Fire pump performance envelope
IS 3844:1989 — Code of practice for installation and maintenance of internal fire hydrants and hose reels: Wet riser flow / pressure, landing valves, orifice plates
IS 15105:2002 — Design and installation of fixed automatic sprinkler fire extinguishing systems: Sprinkler hazard classes, density / area, K factors, durations
IS 3370:2021 (Parts 1–4) — Concrete structures for retaining aqueous liquids: RCC water tank walls / slabs, minimum thickness and crack control (quantities are indicative)
IS 6392:2003 — Steel pipe flanges: Puddle-flange / slip-on flange dimensions in the pipe-insert schedule
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.