SAMPLEUPS & battery sizing — this is what your report looks like, generated from demo inputs.Generate yours →2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
calc.designlink.in
UPS & battery sizing
Sample project — Tower A · Electrical
Generated 28 Nov 2026 16:09 UPS rating with growth, redundancy and load power factor; VRLA / Li-ion battery bank (bloc… Project code SAMPLE
UPS
3 × 80 kVA
Design load
96.0 kW
Battery
4 × 32 × 100 Ah blocks
Bank capacity
400 Ah C10
Input current
168.3 A
Heat to room
3.249 TR
1. Inputs
Group
Input
Value
Unit
Load
Critical load
80
kW
Load
Load power factor
0.9
Load
Future growth
20
%
Load
UPS output rated power factor
0.9
Load
Max loading of UPS
80
%
Load
Redundancy
N+1 (parallel)
Load
Modules in parallel for N (N+1 adds one)
2
Battery
Backup time
30
min
Battery
Battery type
VRLA (lead-acid, 12 V blocks)
Battery
DC bus nominal voltage
384
V
Battery
End-of-discharge voltage per cell
1.75
V
Battery
Inverter efficiency
0.95
Battery
Ageing factor
1.25
Battery
Temperature factor
1.0
Battery
Design margin
1.1
Battery
Peukert exponent (blank = by type)
Battery
Block capacity (0 = auto)
0
Ah
Installation
UPS overall efficiency
0.94
Installation
Input power factor
0.99
Installation
Input voltage (3-phase)
415
V
Installation
Recharge to 90 % within
10
h
Installation
UPS output
Three-phase (4-pole CB, NBCS 10.3.2 e)
NBCS 2026 D2 10.3.2 / 10.3.4 provisions
Isolation transformer on the UPS output (10.3.2 a, optional)
False
NBCS 2026 D2 10.3.2 / 10.3.4 provisions
Dedicated UPS neutral earth pits, interconnected below soil (10.3.2 b)
10. Runtime at end of life: t = 10 · (C / (ageing · temp) / (10 · I))k ≥ treq → 10 · (400 / 1.25 / 2807)1.3 h = 36 min ≥ 30 min PASS
11. Circuit breakers (NBCS 10.3.2 c, e): ICB ≥ 1.25 · I, poles by phases → in 250 A 4P ≥ 210 A, out 315 A 4P ≥ 278 A PASS
5. Notes
NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 10.3.2 / 10.3.4: dedicated, interconnected UPS neutral earth pits; protective devices on both sides; 4-pole CB for 3-phase UPS (DP for 1-phase); ventilated / air-conditioned UPS room; batteries in well-ventilated space with acid-resistant flooring; mark UPS-fed circuits; output shut-down on overload / short circuit.
Constant-power discharge with the Peukert relation approximates manufacturer discharge tables; confirm the final block with the vendor's constant-power (W/cell) table at the chosen end voltage.
IEEE 485 ageing 1.25 and temperature correction; keep battery rooms at 20–25 °C for design life.
6. Standards and references
IEEE Std 485-2020 — Sizing lead-acid batteries for stationary applications: Battery capacity, ageing and temperature factors
IEC 62040-3 — UPS — performance and test requirements: UPS classification and rating
IS 16242 / IEC 62040 — Uninterruptible power systems: UPS requirements (India)
IEEE Std 1184 — Guide for batteries for UPS: Battery selection for UPS
NBCS 2026 (SP 7:2026) Part D Sec 2 — National Building Construction Standards — Electrical and allied installations: Load assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
Prepared by
Checked by
Approved by
Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.