UPS rating with growth, redundancy and load power factor; VRLA / Li-ion battery bank (bloc…
Project code SAMPLE
UPS
3 × 80 kVA
Design load
96.0 kW
Battery
4 × 32 × 100 Ah blocks
Bank capacity
400 Ah C10
Input current
168.3 A
Heat to room
3.249 TR

1. Inputs

GroupInputValueUnit
LoadCritical load80kW
LoadLoad power factor0.9
LoadFuture growth20%
LoadUPS output rated power factor0.9
LoadMax loading of UPS80%
LoadRedundancyN+1 (parallel)
LoadModules in parallel for N (N+1 adds one)2
BatteryBackup time30min
BatteryBattery typeVRLA (lead-acid, 12 V blocks)
BatteryDC bus nominal voltage384V
BatteryEnd-of-discharge voltage per cell1.75V
BatteryInverter efficiency0.95
BatteryAgeing factor1.25
BatteryTemperature factor1.0
BatteryDesign margin1.1
BatteryPeukert exponent (blank = by type)
BatteryBlock capacity (0 = auto)0Ah
InstallationUPS overall efficiency0.94
InstallationInput power factor0.99
InstallationInput voltage (3-phase)415V
InstallationRecharge to 90 % within10h
InstallationUPS outputThree-phase (4-pole CB, NBCS 10.3.2 e)
NBCS 2026 D2 10.3.2 / 10.3.4 provisionsIsolation transformer on the UPS output (10.3.2 a, optional)False
NBCS 2026 D2 10.3.2 / 10.3.4 provisionsDedicated UPS neutral earth pits, interconnected below soil (10.3.2 b)True
NBCS 2026 D2 10.3.2 / 10.3.4 provisionsUPS room ventilated / air-conditioned (10.3.2 d)True
NBCS 2026 D2 10.3.2 / 10.3.4 provisionsBattery space well ventilated (10.3.4 d)True
NBCS 2026 D2 10.3.2 / 10.3.4 provisionsAcid / alkali-resistant battery-room floor (10.3.4 e)True
NBCS 2026 D2 10.3.2 / 10.3.4 provisionsUPS-fed circuits marked at the DBs (10.3.4 a)True

2. Results

UPS rating

ItemValueUnitNote / basis
Load with growth96.0kW
Load kVA at pf 0.90106.67kVA
Required rating (kW / UPS pf, ÷ max loading)133.33kVA
Per module66.67kVA
Selected module80kVA
ConfigurationN+1 — 3 modules
Installed capacity240kVA

Battery bank (per UPS system)

ItemValueUnitNote / basis
DC bus / cells / blocks384 V · 192 cells · 32 × 12 V blocks
End voltage of bank336.0V
Battery power (kW ÷ inverter η)101.05kW
Average discharge current280.7A
C10 capacity for 30 min (Peukert k = 1.30)280.19Ah
Design capacity × ageing × temperature × margin385.26Ah
Block / strings100 Ah × 4 string(s)
Blocks total128nos
Approx. weight3840.0kg
Recharge current (0.1 C)40.0A

Input & room

ItemValueUnitNote / basis
Input power (load ÷ η + charger)119.79kW
Input kVA121.0kVA
Input current per system168.34A
Heat rejected11.43kW≈ 3.25 TR
Battery room ventilation (hydrogen) — VRLA27,648 m³/hIEC 62485 basis: Q = 0.05 · n · I_gas · 5 (approx.)

Protection and NBCS 2026 D2 cl. 10.3.2 / 10.3.4

ItemValueUnitNote / basis
UPS output (N capacity, one system)160kVA
Output current222.59A415 V three-phase
Input circuit breaker250 A 4P≥ 1.25 × 168 A input current
Output circuit breaker315 A 4P10.3.2 (e): 4-pole for 3-phase UPS, double-pole for single-phase
Isolation transformer (10.3.2 a)not provided (optional)
Runtime at 100 % design load — new / end of life48 / 36minrequired 30 min
Output protection (10.3.4 c)shut-down on overload / short circuit; warning label where auto-restoration is enabled

Battery block alternatives

Block AhStringsBank AhBlocksWeight kg
6563901923744
7564501924320
10044001283840
12044801284608
1503450964320
2002400643840
Runtime vs load — installed bank, design load 96 kW = 100 %04080120160200load (% of design kW)runtime (min)020406080100required 30 min36 minend of life (÷ ageing)new battery

3. Checks

CheckResultNote
UPS 3 × 80 kVA for 106.7 kVA / 96.0 kW at ≤ 80 % loadingPASSN modules carry the load with the redundant module out
Battery 4 string(s) × 32 blocks × 100 Ah → 400 Ah ≥ 385 AhPASS30 min at 101.1 kW DC, Peukert k = 1.3
Dedicated UPS neutral earth pits (IT), interconnected below soil with the other earth pitsPASSNBCS 2026 D2 cl. 10.3.2 (b); IS 3043
UPS room ventilated / air-conditioned against thermal runawayPASSNBCS 2026 D2 cl. 10.3.2 (d); heat to remove ≈ 11.4 kW
Battery space well ventilated (H₂ / O₂ evolution)PASSNBCS 2026 D2 cl. 10.3.4 (d); IEC 62485-2 airflow in the Input & room section
Acid-resistant tiles / coating on the battery-room floorPASSNBCS 2026 D2 cl. 10.3.4 (e)
UPS-fed circuits marked so that mains isolation is not taken as deadPASSNBCS 2026 D2 cl. 10.3.4 (a)
Circuit breakers: input 4P 250 A ≥ 1.25 × 168 A, output 4P 315 A ≥ 1.25 × 223 APASSNBCS 2026 D2 cl. 10.3.2 (c) protective devices both sides; (e) 4-pole for 3-phase UPS, double-pole for single-phase

4. Worked example

Worked from this calculation's own inputs — each value matches the results table above.

UPS 3 × 80 kVA (N+1) for 80 kW critical load
the inputs of this calculation
Given: Load 80 kW, pf 0.9, growth 20 % · UPS output pf 0.9, loading ≤ 80 %, 2 module(s) for N · Battery VRLA, 384 V DC, 30 min, Peukert k 1.3
1. Design load: Pd = P · (1 + g) = 80 · 1.2 = 96 kW
2. Load kVA: S = Pd / pf = 96 / 0.9 = 106.7 kVA
3. Required UPS rating: Sreq = max(S, Pd / pfUPS) / loading = max(106.7, 106.7) / 0.8 = 133.3 kVA
4. Module: next standard ≥ Sreq / N = 133.3 / 2 = 66.7 = 80 kVA (3 modules installed)
5. Battery power: Pdc = Pd / ηinv = 96 / 0.95 = 101.05 kW
6. Average discharge current: I = Pdc / ((Vdc + Vend) / 2) = 101,053 / ((384 + 336) / 2) = 280.7 A (192 cells)
7. C10 capacity for the backup: C10 = I · 10 · (t / 10)1/k = 280.7 · 10 · (0.500 / 10)1/1.3 = 280 Ah
8. Design capacity: Cd = C10 · ageing · temperature · margin = 280 · 1.25 · 1 · 1.1 = 385 Ah
9. Bank: strings · block ≥ Cd → 4 × 100 = 400 ≥ 385 Ah PASS
10. Runtime at end of life: t = 10 · (C / (ageing · temp) / (10 · I))k ≥ treq → 10 · (400 / 1.25 / 2807)1.3 h = 36 min ≥ 30 min PASS
11. Circuit breakers (NBCS 10.3.2 c, e): ICB ≥ 1.25 · I, poles by phases → in 250 A 4P ≥ 210 A, out 315 A 4P ≥ 278 A PASS