Voltage drop & cable sizing report

Sample project — Tower A · preset: CPWD (stricter: 4 % first hop / 5 % total)
Generated 28 Nov 2026 16:03
Impedance method · IS 732 / IS 1554 / IS 7098 · NBCS 2026 Part D Sec 2 · CPWD cascade limits · VD basis: split
Project code SAMPLE
Feeders
7
Final loads
5
Cascade failures
0
Ampacity failures
0
Design-check failures
0
Demand (diversified)
159.0 kW
Total cable
382 m

1. Basis and method

Design regime: Indian — code edition NBCS 2026 (SP 7:2026) Part D Sec 2 (replaces NBC 2016 Part 8 Sec 2): VD basis — Split — ≤ 6 % transformer → final DB plus ≤ 3 % final DB → last point (9 % at the last point) (NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a): voltage drop ≤ 6 % transformer → final DB and ≤ 3 % DB → last point (cl. 6.2, 5.6 Note a), four-core cables only and Cu up to 25 sq mm (cl. 5.3.7.1), full-size neutral (cl. 8.2.9.1), F&LS supplies (cl. 4.2.1 jj); IS 732:2019 (harmonised with IEC 60364), IS 1554 / IS 7098 cables, CPWD General Specifications cascade limits (stricter than NBCS), with the IEC standards they adopt.

Ib = kW / (√3·V·pf)  (1φ: kW / (Vph·pf))  ·  Iz2 = runs · Ir · kθ · kρ · kd · kgrp · klay — per feeder from IS 3961 Pt 2 / IEC 60364-5-52 Tables B.52.14–15 (temperature, θmax XLPE), B.52.16 (soil), depth (IS 3961 / IEC 60287-2-1), B.52.17–21 (grouping; parallel runs counted as circuits), A.52.3 (installation method). Project defaults: air 40 °C, ground 30 °C, 1.5 K·m/W, 0.9 m, 1 circuit(s) touching, 1 tray(s); catalogue reference 40 °C air / 30 °C ground / 1.5 K·m/W / 0.9 m / single circuit. Feeder-specific conditions are shown in the schedule k column.
Vd = √3 · Ib · L · (R·cosφ + X·sinφ) / (1000 · runs)  ·  Vd% = Vd / 415 × 100  ·  pf = 0.95
Cascade limits (split: 6 % to the final DB + 3 % final circuit; NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a): first hop from source panel ≤ 4.0 %, total ≤ 5.0 %, final circuit ≤ 3.0 % on the segment on top of the DB; bus duct allowance 2.0 % (calculated from R + jX). Panel load = Σ outgoing × diversity factor (default 1.0).
Auto-sizing: smallest cable meeting Iz2 ≥ Ib and the cumulative limit; Cu up to 35 sqmm then Al; max 300 sqmm, parallel runs only when the maximum size cannot pass. Breaker: next standard switchgear rating ≥ Ib, minimum 25 A (25/32/40/63/100/125/160/200/250/315/400/630/800/1000/1250/1600/2000/2500/3200/4000/5000/6300 A); MCB ≤ 63 A, MCCB ≤ 630 A, ACB above.

2. Panel loads (diversified)

PanelConnected kWDFDemand kWIb AIncomer breakerIncoming cable
MLP159.01.00159.0250.4315A MCCB4C X 185 Sq.mm, AL × 1
LP-139.01.0039.074.7100A MCCB4C X 35 Sq.mm, Cu × 1

3. Cable schedule

#FromToPhLoad kWL mLayingCable / bus ductRunsIb ABreakerk (derating)Iz2 AVD %Cum. %Limit %Status
1TR-1 (1000 kVA)MLP (panel)3φ159.0 Σ159.0×1.0040In air – perforated tray / ladder / clipped direct4C X 185 Sq.mm, AL1250.4315A MCCB 4P1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
3291.141.144.0PASS
2MLPLP-1 (panel)3φ39.0 Σ39.0×1.0060In air – perforated tray / ladder / clipped direct4C X 35 Sq.mm, Cu174.7100A MCCB 4P1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
1462.053.195.0PASS
3MLPPP-1 (Pumps)3φ75.080In air – perforated tray / ladder / clipped direct4C X 50 Sq.mm, AL1109.8125A MCCB 4P1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
1382.964.095.0PASS
4MLPAHU-13φ45.055In air – perforated tray / ladder / clipped direct4C X 25 Sq.mm, Cu165.9100A MCCB 4P1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
1221.342.475.0PASS
5LP-1Lighting — floor 11φ12.035In air – perforated tray / ladder / clipped direct3C X 25 Sq.mm, Cu152.763A MCB DP1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
1221.364.555.0PASS
6LP-1Lighting — floor 21φ12.042In air – perforated tray / ladder / clipped direct3C X 25 Sq.mm, Cu152.763A MCB DP1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
1221.634.825.0PASS
7LP-1Lift-13φ15.070In air – perforated tray / ladder / clipped direct4C X 10 Sq.mm, Cu122.025A MCB FP1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
741.404.595.0PASS

4. Voltage-drop cascade

TR-1 (1000 KVA)Demand 159.0 kW · DF 1.0 · connected 159.0 kW315A MCCB 4P · 4C X 185 Sq.mm, AL × 1 · 40 m · 1.14%MLPΣ 159.0 kW · DF 1.01.14% / 4.0%100A MCCB 4P · 4C X 35 Sq.mm, Cu × 1 · 60 m · 2.05%LP-1Σ 39.0 kW · DF 1.03.19% / 5.0%63A MCB DP · 3C X 25 Sq.mm, Cu × 1 · 35 m · 1.36%Lighting — floor 112.0 kW · 1φ4.55% / 5.0%63A MCB DP · 3C X 25 Sq.mm, Cu × 1 · 42 m · 1.63%Lighting — floor 212.0 kW · 1φ4.82% / 5.0%25A MCB FP · 4C X 10 Sq.mm, Cu × 1 · 70 m · 1.40%Lift-115.0 kW4.59% / 5.0%125A MCCB 4P · 4C X 50 Sq.mm, AL × 1 · 80 m · 2.96%PP-1 (Pumps)75.0 kW4.09% / 5.0%100A MCCB 4P · 4C X 25 Sq.mm, Cu × 1 · 55 m · 1.34%AHU-145.0 kW2.47% / 5.0%

Voltage-drop profile along the longest route (cumulative % vs distance from the source)

0 %1 %2 %3 %4 %5 %6 %020406080100120140160Limit basis: split: 6 % to the final DB + 3 % final circuit — NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a3 % — NBCS cl. 6.2 final circuit DB → last point4 % — project first hop limit (this project)5 % — project total limit (this project)6 % — NBCS cl. 6.2 transformer → final DBMLP 1.14%LP-1 3.19%Lift-1 4.59%Longest route: TR-1 (1000 kVA) → MLP → LP-1 → Lift-1 — 170 m, 4.59 %Lighting — floor 2 4.82%Worst VD path: TR-1 (1000 kVA) → MLP → LP-1 → Lighting — floor 2 — 142 m, 4.82 %route length from the source, m
NodeFed fromCable × runsL mSegment VD %Cumulative VD %Limit %Check
TR-1 (1000 KVA) source · connected 159.0 kW · demand 159.0 kW (DF 1.00)0.004.0
      └ MLP (panel)TR-1 (1000 kVA)4C X 185 Sq.mm, AL × 1401.141.144.0PASS
            └ LP-1 (panel)MLP4C X 35 Sq.mm, Cu × 1602.053.195.0PASS
                  └ Lighting — floor 1LP-13C X 25 Sq.mm, Cu × 1351.364.555.0PASS
                  └ Lighting — floor 2LP-13C X 25 Sq.mm, Cu × 1421.634.825.0PASS
                  └ Lift-1LP-14C X 10 Sq.mm, Cu × 1701.404.595.0PASS
            └ PP-1 (Pumps)MLP4C X 50 Sq.mm, AL × 1802.964.095.0PASS
            └ AHU-1MLP4C X 25 Sq.mm, Cu × 1551.342.475.0PASS

5. Design checks — IS 732:2019 / IEC 60364

5.1 Phase balance

Single-phase loads are placed on their tagged phase or on the least-loaded phase of their panel; three-phase loads are split equally unless a split is entered. Design current Ib = worst-phase current (IEC 60364-5-52 cl. 523.6.3); neutral current IN = |IR + a·IY + a²·IB| adds to the worst-phase voltage drop. Unbalance = (Imax − Iavg)/Iavg; limit 10 % (design practice / IEEE 141 / CEA).

PanelkW RkW YkW BI R AI Y AI B AI N AUnbalance %Limit %Check
TR-1 (1000 KVA) (source)57.057.045.0250.4250.4197.752.7810PASS
MLP57.057.045.0250.4250.4197.752.7810PASS
LP-117.017.05.074.774.722.052.73110FAIL

Single-phase loads and their phases:

FromTo (1φ load)PhasekWIb A
LP-1Lighting — floor 1R12.0052.7
LP-1Lighting — floor 2Y12.0052.7

5.2 Harmonics — IEC 60364-5-52 Annex E (Table E.52.1)

3rd-harmonic content of the line current ≤ 15 %: no reduction; 15–33 %: factor 0.86 on the line current; 33–45 %: factor 0.86 applied to the neutral current IN = 3·h3·IL; > 45 %: cable sized for the neutral current. Project default h3 = 0 %.

No feeder with 3rd-harmonic content above 0 % — no harmonic derating applied.

5.3 Motor starting

Istart = m · Ib (DOL 6 ×, star-delta 2.5 ×, soft starter 3 ×, VFD 1.5 ×) at pf 0.3; dip at the motor terminals = upstream running VD + starting VD of the motor feeder ≤ 15 % (IEEE 141 / IS 732 guidance; upstream feeders assumed at running load).

No feeder is marked as a motor (Load details ▸ Load type).

5.4 Overload protection — IS 732:2019 cl. 433.1 / IEC 60364-4-43 cl. 433.1

Ib ≤ In ≤ Iz and I2 ≤ 1.45·Iz, where I2 = 1.45·In for MCB (IS/IEC 60898-1), 1.30·In for MCCB / ACB (IEC 60947-2) and 1.60·In for gG fuses (IS 13703 / IEC 60269). With the rule on, the cable is sized so that Iz2 ≥ In (the second condition is then automatically satisfied for breakers).

FromToIb AIn A · typeIz2 AI2 A1.45·Iz AIb ≤ In ≤ IzI2 ≤ 1.45 Iz
TR-1 (1000 kVA)MLP250.4315 MCCB329.01.30 × In = 409.5477.1PASSPASS
MLPLP-174.7100 MCCB146.01.30 × In = 130.0211.7PASSPASS
MLPPP-1 (Pumps)109.8125 MCCB138.01.30 × In = 162.5200.1PASSPASS
MLPAHU-165.9100 MCCB122.01.30 × In = 130.0176.9PASSPASS
LP-1Lighting — floor 152.763 MCB122.01.45 × In = 91.3176.9PASSPASS
LP-1Lighting — floor 252.763 MCB122.01.45 × In = 91.3176.9PASSPASS
LP-1Lift-122.025 MCB74.01.45 × In = 36.2107.3PASSPASS

5.5 Short-circuit withstand of cables — IS 732 / IEC 60364-4-43 cl. 434.5.2

S ≥ Ik·√t / k with k = 143 (Cu XLPE), 115 (Cu PVC), 94 (Al XLPE), 76 (Al PVC) — Table 43A; Ik = three-phase fault level at the upstream bus, cascaded from the source (36 kA at each source panel unless set per panel) through cable impedances Ik = Uph/|Z| (screening, c = 1; see the Short-circuit tool for the IEC 60909 study); t = clearing time of the feeder's own breaker (MCB 0.01 s, MCCB 0.03 s, ACB 0.4 s). Parallel runs share the fault current (S = size × runs).

From (bus)ToIk at bus kAIk at To kABreakert s / let-through I²tkS min sqmmCable × runsS sqmmCheckIk source
TR-1 (1000 kVA)MLP36.0018.64315 MCCB0.030 s9466.34C X 185 Sq.mm, AL × 1185PASSdefault
MLPLP-118.644.82100 MCCB0.030 s14322.64C X 35 Sq.mm, Cu × 135PASScascaded
MLPPP-1 (Pumps)18.643.15125 MCCB0.030 s9434.34C X 50 Sq.mm, AL × 150PASScascaded
MLPAHU-118.644.01100 MCCB0.030 s14322.64C X 25 Sq.mm, Cu × 125PASScascaded
LP-1Lighting — floor 14.822.9663 MCBI²t 51,570 A²s1431.63C X 25 Sq.mm, Cu × 125PASScascaded
LP-1Lighting — floor 24.822.7563 MCBI²t 51,570 A²s1431.63C X 25 Sq.mm, Cu × 125PASScascaded
LP-1Lift-14.821.1625 MCBI²t 35,197 A²s1431.34C X 10 Sq.mm, Cu × 110PASScascaded

MCB-protected feeders (In ≤ 63 A): k²S² ≥ let-through I²t of an energy-limiting class 3 MCB at the prospective current (IEC 60898-1 Annex ZC, type C values; IEC 60364-4-43 cl. 434.5.2). Other feeders: adiabatic S ≥ Ik·√t / k with the device clearing time.

5.6 NBCS 2026 Part D Sec 2 — cables, neutral, final circuits and F&LS feeders

Four-core cables (cl. 5.3.7.1): only four-core cables are used for internal installations (four-core in place of 3½-core below 50 sq mm) and all sizes up to 25 sq mm are copper — auto-sizing picks 4C Cu up to 35 sq mm, then 4C Al. No 3½-core cable in this schedule.
Neutral (cl. 8.2.9.1 Note): neutral of the same size as the phase conductor (half-size neutral no longer acceptable with non-linear loads); the neutral-current term in the voltage drop uses zN = z for 4C cables.
Voltage drop (cl. 6.2, 5.6 Note a): ≤ 6 % from the transformer to the final distribution board and ≤ 3 % from the distribution board to the last point — read either as split (6 % + 3 %) or as total (6 % to the last point incl. ≤ 3 % final circuit); the project chooses (Settings ▸ VD basis).
Voltage-drop basis: Split — ≤ 6 % transformer → final DB plus ≤ 3 % final DB → last point (9 % at the last point) — NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a. This project: first hop ≤ 4.0 %, total ≤ 5.0 %, final circuits ≤ 3.0 % on the segment; final-circuit rows add their segment limit on top of the DB's own cumulative drop. (stricter than NBCS — CPWD practice)

No row is marked as a final circuit (Load details ▸ Final circuit) — the 3 % DB → last-point check applies to final-circuit rows.

Fire & life-safety supplies (cl. 4.2.1 jj): fire pumps, pressurisation / smoke venting, fireman's and all lifts, exit and emergency lighting, fire alarm, PA, door hold-open devices and fire-control-room lighting are fed from the normal and the standby-generator supply with changeover; the generator takes the starting current of all F&LS loads; the F&LS panel / DB is in a fire-safe zone; cables are fire-survival (circuit integrity) as far as possible. F&LS rows are auto-sized in the fire-survival (FS) cable family.

No feeder is marked F&LS (Load details ▸ F&LS feeder).

5.7 Worked examples (largest feeder and critical route)

Worked from this schedule’s own inputs and results — the values can be traced to the cable schedule (section 3) and the cascade (section 4).

Feeder TR-1 (1000 kVA) → MLP — design current and ampacity with derating
largest feeder of the schedule
Given: P 159.00 kW, 3φ · U 415 V · cosφ 0.95 · cable 4C X 185 Sq.mm, AL × 1 · Ir 329.0 A (catalogue, reference conditions)
1. Phase currents R / Y / B: Iph = Pph / (Uph·cosφ) = 57.00 / 57.00 / 45.00 kW = 250.4 / 250.4 / 197.7 A
2. Design current (worst phase): Ib = Imax = 250.4 A (balanced value √3 formula would give 232.8 A)
3. Neutral current: IN = |IR + a·IY + a²·IB| = 52.7 A (unbalance 7.5 % ≤ 10 %)
4. Derating factor: k = kθ·kρ·kd·kgrp·klay = 1.000 × 1.00 × 1.00 × 1.00 × 1.00 = 1.000 (In air – perforated tray / ladder / clipped direct; grouping n = 1)
5. Derated capacity: Iz2 = n·Ir·k = 1 × 329.0 × 1.000 = 329.0 A
6. Ampacity: Iz2 ≥ Ib → 329.0 ≥ 250.4 A PASS
7. Overload rule (IS 732 / IEC 60364-4-43 cl. 433.1): Ib ≤ In ≤ Iz → 250.4 ≤ 315 (MCCB) ≤ 329.0 A PASS
8. Conventional tripping current: I2 = f·In ≤ 1.45·Iz → 1.3 × 315 = 409.5 ≤ 477.1 A PASS
Feeder TR-1 (1000 kVA) → MLP — voltage drop (impedance method, cable mV/A/m)
R and X are the catalogue values of the selected cable at the operating temperature
Given: R 0.211 Ω/km · X 0.076 Ω/km · L 40 m · Ib 250.4 A · runs n 1
1. Impedance per conductor: z = R·cosφ + X·sinφ = 0.211 × 0.95 + 0.076 × 0.312 = 0.2242 mV/A/m (Ω/km ≡ mV/A/m)
2. Worst-phase drop incl. neutral: ΔUph = L·(Imax·z + IN·zN) / (1000·n) = 40 × (250.4 × 0.2242 + 52.7 × 0.2242) / (1000 × 1) = 2.72 V (zN = z, full-size neutral)
3. Percent of phase voltage: ΔU% = ΔUph / Uph × 100 = 2.72 / 239.6 × 100 = 1.135 % (line equivalent √3·ΔUph = 4.71 V)
4. Segment limit: ΔU% ≤ segment limit → 1.14 ≤ 4.0 % PASS
Cumulative voltage drop TR-1 (1000 kVA) → Lighting — floor 2 (critical route)
the route that uses the largest share of its limit; each segment drop is computed as in the example above
Given: hops 3 · route length 142 m · limit 5.0 % at Lighting — floor 2
1. TR-1 (1000 kVA) → MLP: ΔU%seg = 4C X 185 Sq.mm, AL × 1, 40 m, 250.4 A = 1.135 %
2. MLP → LP-1: ΔU%seg = 4C X 35 Sq.mm, Cu × 1, 60 m, 74.7 A = 2.054 %
3. LP-1 → Lighting — floor 2: ΔU%seg = 3C X 25 Sq.mm, Cu × 1, 42 m, 52.7 A = 1.634 %
4. Cumulative: ΣΔU% = ΔU%1 + ΔU%2 + ΔU%3 = 1.135 + 2.054 + 1.634 = 4.823 %
5. Cumulative limit: ΣΔU% ≤ limit → 4.82 ≤ 5.0 % PASS (CPWD cascade limit, stricter than NBCS 2026 Part D Sec 2 cl. 6.2 — VD basis split (split: 6 % to the final DB + 3 % final circuit))
Feeder TR-1 (1000 kVA) → MLP — short-circuit withstand and other checks
IEC 60364-4-43 cl. 434.5.2 adiabatic check (IS 732)
Given: Ik at TR-1 (1000 kVA) 36.00 kA · k 94 (Al XLPE)
1. Minimum cross-section: Smin = Ik·√t / k = 36000 × √0.03 / 94 = 66.3 sq mm (t = 0.03 s (MCCB))
2. Withstand: S ≥ Smin → 185 ≥ 66.3 sq mm PASS (Ik at MLP = 18.64 kA)

6. Cable bill of quantities

CableFeedersRunsLength (m)Terminations
4C X 50 Sq.mm, AL11802
3C X 25 Sq.mm, Cu22774
4C X 10 Sq.mm, Cu11702
4C X 35 Sq.mm, Cu11602
4C X 25 Sq.mm, Cu11552
4C X 185 Sq.mm, AL11402

Warnings

MLP → LP-1: Phase unbalance 31 % > 10 %

7. Settings

SettingValue
voltage415
pf0.95
k1_temp0.95
k2_group0.86
k3_tray0.92
max_size300
max_runs8
cu_upto_size35
default_cores_small4
default_cores_large4
limit_first_hop4.0
limit_total5.0
bbt_vd2.0
seg_limit_alignTrue
min_breaker25
termination_per_run2
size_for_breakerFalse
parent_share0.6
default_materialauto
default_df1.0
mcb_max63
mccb_max630
derating_modetables
overload_ruleTrue
unbalance_limit10
thd30
motor_start_pf0.3
motor_start_limit15
sc_checkTrue
sc_source_ka36
regimeindian
limit_final3.0
code_editionnbcs2026
vd_basissplit
derating.insulationXLPE
derating.air_temp40
derating.ground_temp30
derating.soil_rho1.5
derating.depth0.9
derating.n_circuits1
derating.spacingtouching
derating.trays1

8. Formulae applied (with code clauses)

QuantityFormulaReference / clauseNotes
Design current (3φ)Ib = P / (√3 · U · cosφ)IEC 60364-5-52:2009 cl. 523 / IS 732:2019 Sec. 5.2P in kW × 1000, U = 415 V line voltage; 1φ: Ib = P / (U_ph · cosφ)
Current-carrying capacity (derated)Iz2 = n · Ir · k_θ · k_ρ · k_d · k_grp · k_lay (manual mode: n · Ir · k1 · k2 · k3 · k_lay)IEC 60364-5-52:2009 cl. 523.1; Table A.52.3 (reference methods B, C, E, F, D1, D2); B.52.14 (air temperature), B.52.15 (ground temperature), B.52.16 (soil thermal resistivity), B.52.17 / B.52.20 / B.52.21 (grouping in air), B.52.18 (direct buried), B.52.19 (in ducts); IS 3961 Pt 2 (rating factors, depth); IEC 60287-2-1 (k_θ = √((θmax−θamb)/(θmax−θref)), depth); IS 1554 Pt 1 / IS 7098 Pt 1 base ratingsBase ratings at 40 °C air / 30 °C ground / 1.5 K·m/W / 0.9 m / single circuit; parallel runs counted as circuits in k_grp; grouping rows for n above the table use the next larger row (conservative); Ib ≤ In ≤ Iz (IEC 60364-4-43 cl. 433.1)
Voltage drop (3φ, impedance method)ΔU = √3 · Ib · L · (R·cosφ + X·sinφ) / (1000 · n)IEC 60364-5-52:2009 Annex G (G.1); IS 732:2019 Annex on voltage drop; conductor R, X per IS 1554 / IS 7098 / IS 8130R, X in Ω/km at operating temperature; 1φ: ΔU = 2 · Ib · L · (R·cosφ + X·sinφ)/1000
Voltage drop, percentΔU% = ΔU / Un × 100NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a — Split — ≤ 6 % transformer → final DB plus ≤ 3 % final DB → last point (9 % at the last point); IEC 60364-5-52:2009 Annex G Table G.52.1 (≤ 3 % lighting, ≤ 5 % other, from origin); CPWD General Specifications Pt I (2013) cl. on voltage dropCascade: first hop from source panel ≤ limit_first_hop, cumulative to last point ≤ limit_total
Bus-duct voltage dropΔU = √3 · Ib · L · (R·cosφ + X·sinφ) / 1000IEC 61439-6:2012 (busbar trunking systems) Annex — voltage drop from manufacturer R, X per metreChecked against the bus-duct VD allowance (default 2 %)
Panel demand (diversity)DL(N) = Σ connected × DF ; DL(F) = Σ fire/essential loads × 1.0NBCS 2026 Part D Sec 2 cl. 4.2.2.2 (diversity) and 4.2.1 (jj) (fire & life-safety supplies); CPWD GS Pt IDF per panel, default 1.0; cable sized for the diversified demand
Breaker ratingIn = next standard switchgear rating ≥ max(Ib, I_min) ; standard steps 25, 32, 40, 63, 100, 125, 160, 200, 250, 315, 400, 630, 800, 1000, 1250, 1600, 2000, 2500, 3200, 4000, 5000, 6300 A ; I_min = 25 A default (user-settable) ; MCB ≤ 63 A, MCCB ≤ 630 A, ACB above (configurable)IEC 60364-4-43:2008 cl. 433.1 (Ib ≤ In ≤ Iz, I2 ≤ 1.45 Iz); IEC 60898-1 (MCB); IEC 60947-2 (MCCB/ACB)
Design current with unbalanceI_b = max(I_R, I_Y, I_B) ; I_N = |I_R + a·I_Y + a²·I_B| ; unbalance = (I_max − I_avg)/I_avgIEC 60364-5-52:2009 cl. 523.6.3 (neutral carrying current); IEEE 141 / CEA practice ≤ 10 %1φ loads on tagged or least-loaded phase; worst-phase VD = L·(I_max·z + I_N·z_N)/(1000·n)/U_ph, z_N = 2z for reduced neutral (3.5-core)
Harmonic reduction factorh3 ≤ 15 %: 1.0 on I_L ; 15–33 %: 0.86 on I_L ; 33–45 %: 0.86 on I_N = 3·h3·I_L ; > 45 %: 1.0 on I_NIEC 60364-5-52:2009 Annex E, Table E.52.1Applied to 4-core / 3.5-core three-phase circuits with neutral
Motor starting voltage dipI_start = m·I_b (DOL 6, Y-Δ 2.5, soft 3, VFD 1.5) ; ΔU_start % = upstream running VD + segment VD at I_start, pf_start 0.3 ≤ 15 %IEEE 141-1993 cl. 3.11 (starting voltage ≥ 80–85 %); IS 732:2019 cl. 525 note; IEC 60364-5-52 Annex GUpstream circuits taken at running load (screening)
Overload protection ruleI_b ≤ I_n ≤ I_z ; I_2 ≤ 1.45·I_z (I_2 = 1.45 I_n MCB, 1.30 I_n MCCB/ACB, 1.60 I_n gG fuse)IS 732:2019 cl. 433.1 = IEC 60364-4-43:2008 cl. 433.1; IS/IEC 60898-1 cl. 8.6.2; IEC 60947-2 cl. 7.2.1.2.4; IS 13703 / IEC 60269-1Rule on → cable sized for I_n
Cable short-circuit withstand (in VD)S_min = I_k·√t / k ; I_k(bus) = U_ph / |Z_source + Σ(R + jX)·L/(1000·n)|IS 732:2019 / IEC 60364-4-43:2008 cl. 434.5.2, Table 43A (k); IEC 60909-0 (c = 1 screening)t = clearing time of the feeder breaker (MCB 0.01 s, MCCB 0.03 s, ACB 0.4 s); parallel runs share the fault current

9. Standards and code references

StandardTitleUsed for
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IEC 60364-5-52:2009Low-voltage electrical installations — Selection and erection of wiring systemsCurrent-carrying capacity, derating (temperature, grouping, installation method), voltage drop ≤ 3–5 %
IEC 60364-4-43:2008Protection against overcurrentIb ≤ In ≤ Iz, adiabatic cable withstand I²t ≤ k²S² with k = 143 (Cu XLPE), 115 (Cu PVC), 94 (Al XLPE), 76 (Al PVC)
IS 1554 (Part 1):1988PVC insulated (heavy duty) electric cables up to 1100 VCable ratings, resistance and reactance data
IS 3961 (Part 2):1967 (reaffirmed)Recommended current ratings for cables — PVC insulated and PVC sheathed heavy duty cablesRating factors for ambient / ground temperature, soil thermal resistivity, depth of laying and grouping; installation categories (in air, in ground, in ducts)
IEC 60287-1-1 / 60287-2-1Electric cables — Calculation of the current ratingTemperature correction √((θmax−θamb)/(θmax−θref)) and depth-of-laying correction
IS 7098 (Part 1):1988Cross-linked polyethylene insulated PVC sheathed cables up to 1100 VXLPE cable ratings (90 °C), resistance and reactance data
IS 694:2010PVC insulated cables for working voltages up to 1100 VFRLS wiring conductors
CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation)CPWD specificationsVoltage-drop cascade limits, cable/wiring practice, panel and metering requirements
IEC 60947-2:2016 / IS/IEC 60947-2Low-voltage switchgear — Circuit-breakersACB/MCCB ratings Icu, Ics, Icw; release characteristics (L-S-I-G); selectivity definitions
IEC 60898-1:2015 / IS/IEC 60898-1Circuit-breakers for overcurrent protection for household and similar installations (MCB)B/C/D tripping bands (C: 5–10 × In), thermal tripping 1.13/1.45 × In
IS 13703 / IEC 60269-1Low-voltage fusesI2 = 1.6 In for gG fuses in the overload rule
IEEE 141-1993 (Red Book)Recommended practice for electric power distribution for industrial plantsMotor starting voltage dip (≥ 80–85 % at terminals), phase unbalance practice
IEC 60909-0:2016Short-circuit currents in three-phase a.c. systems — Calculation of currentsImpedance method, voltage factor c (1.05 / 1.10 max, 0.95 min), peak factor κ = 1.02 + 0.98·e^(−3R/X), Ik" = c·Un/(√3·Zk)
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in). Verify against the applicable code and manufacturer cable data before issue.