SAMPLE Water supply network — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

Water supply network — hydraulic design report

Sample project — Tower A · India — NBCS 2026 (SP 7:2026) Part E Sec 1 · CPHEEO Manual on Water Supply · IS 2065
Generated 28 Nov 2026 16:09
Steady-state network analysis (global gradient method) · peak-hour demand · NBCS 2026 (SP 7:2026) Part E Sec 1
Project code SAMPLE
Nodes
5
Pipes
5 · 500 m
Population
1,870
Daily demand
245 kL/d
Peak flow
8.5 L/s (PF 3.0)
Min. pressure
17.0 m at N5
Checks failing
1
N5 short by 0.0 m → P4 upsized to 350 mm
N5 short by 0.0 m → P4 upsized to 400 mm
N5 short by 0.0 m → P4 upsized to 450 mm
N5 short by 0.0 m → P4 upsized to 500 mm
N5 short by 0.0 m → P4 upsized to 600 mm
N5 short by 0.0 m → P4 upsized to 700 mm
N5 short by 0.0 m → P4 upsized to 800 mm
N5: -0.0 m short of the required pressure — no upsizable pipe left on its supply path

1. Design criteria

CriterionValueReference
StandardIndia — NBCS 2026 (SP 7:2026) Part E Sec 1 · CPHEEO Manual on Water Supply · IS 2065
Code editionNBCS 2026 (SP 7:2026) Part E Sec 1 (default; NBC 2016 Part 9 selectable)SP 7:2026 Part E Sec 1
Population (dwellings)by bedrooms, or persons per unit enteredNBCS 2026 Part E Sec 1 cl. 4.1 (a) — 1 BHK 3, 2 BHK 4, 3 BHK 5, 4 BHK+ 6 persons; EWS 4, studio 2
Per-capita demand135 lpcd (occupancy table / building override)NBCS 2026 Part E Sec 1 cl. 4.1.1 (135 urban / 100 water-efficient / 70 rural; 30 of it flushing, cl. 4.1.1.1) · Table 1 (other occupancies)
Peak factor3.00 (population served 1,870)CPHEEO WS Manual cl. 2.6 — peak factor 3.0 (< 50 000), 2.5 (50 000–2 lakh), 2.0 (> 2 lakh); NBCS 2026 Part E Sec 1 cl. 4.7.1 (b) PF 2–3
Velocity0.6 – 1.8 m/s in mains; ≤ 2.4 m/s in risersCPHEEO WS Manual cl. 7.3 (distribution 0.6–1.8 m/s; typical practice) · NBCS 2026 Part E Sec 1 cl. 4.8.6 — ≤ 2.4 m/s in water distribution (copper hot water ≤ 1.5 m/s)
Residual pressure at ground7.0 m (1 storey), 12.0 m (2 storey), 17.0 m (3 storey)CPHEEO WS Manual cl. 7.4.1 — residual head 7 m (single storey), 12 m (2 storey), 17 m (3 storey) at the ferrule
Pressure at highest fixture≥ 10.2 mNBCS 2026 Part E Sec 1 cl. 3.1.2 — residual head at the highest / farthest outlet: 0.18 bar at the tap, 0.5 bar for some fixtures, 1.0 bar (10.2 m) for flush valves
Maximum pressure≤ 42.8 m (4.2 bar) — PRV / zoning aboveNBCS 2026 Part E Sec 1 cl. 4.7.5 — maximum 0.42 N/mm² (4.2 bar ≈ 42.8 m); pressure-reducing valves above
Pressure zoning≤ 9 floors per zone and static head ≤ 42.8 mNBCS 2026 Part E Sec 1 cl. 4.8.6 — zoning every 7–9 floors within the 4.2 bar limit
Minimum main size80 mmCPHEEO — distribution mains ≥ 100 mm where hydrants are fed; 80 mm otherwise (typical)
Head lossHazen-Williams · C = 140 (Ductile iron K9 CL (IS 8329)) · fittings 15 %Hazen-Williams h = 10.67·L·Q^1.852 / (C^1.852·D^4.87) — CPHEEO WS Manual cl. 7.2; NBCS 2026 Part E Sec 1 cl. 4.7 / Annex C · minor losses as 15 % of friction loss (typical practice; enter fittings per pipe for exact)
Storage2.00 day(s): UG 1.50 d + OH 0.50 d + fire reserveNBCS 2026 Part E Sec 1 cl. 4.4.10 (p. 2527–2528): UGT 1½ day + OHT ½ day (gravity supply from the roof tank) — cl. 4.4.10 (2), Note 2

2. Sources of supply

NodeSourceHGL / water level (m)
N1Tank / OHT — water level 20.0 m above GL120.00

3. Buildings, demands and internal risers

BuildingTypePopulationLPCDDemand kL/dQ avg L/sQ peak L/sFloors / heightRiserP at base (m)P at top fixture (m)Booster / zonesOHT kLConnected to
Tower Aresidential1,000
200 units × 5 (3 BHK default)
135.0135.01.5624.6912 / 34.0 m1 × 50 mm GI · V 2.39 m/s · h_f 9.97 m18.6-25.4 (≥ 10.2)35.5 m @ 4.69 L/s · 2 pressure zones67.5N2 (100 %)
Tower Bresidential750
150 units × 5 (3 BHK default)
135.0101.21.1723.524 / 10.0 m1 × 50 mm GI · V 1.79 m/s · h_f 2.25 m17.04.8 (≥ 10.2)5.4 m @ 3.52 L/s50.6N5 (50 %), N4 (50 %)
Clubrestaurant120
120 seats
70.08.40.0970.291 / 1.0 m1 × 15 mm GI · V 1.65 m/s · h_f 3.15 m18.013.8 (≥ 10.2)PASS4.2N3 (100 %)
-2836-13291211614307450min 10.2 mmax 42.8 mTower ATower Bbelow the minimum → boosterPressure in the riser at peak flow, no booster (m)Height of the outlet above the riser base (m)

Riser pressure vs height at peak flow from the network pressure at the building connection (no booster): green band between the minimum at the top fixture (NBCS 2026 Part E Sec 1 cl. 3.1.2 — residual head at the highest / farthest outlet: 0.18 bar at the tap, 0.5 bar for some fixtures, 1.0 bar (10.2 m) for flush valves) and the maximum (NBCS 2026 Part E Sec 1 cl. 4.7.5 — maximum 0.42 N/mm² (4.2 bar ≈ 42.8 m); pressure-reducing valves above).

Population from the occupancy table unless entered; peak flow = PF × average. Riser sized for the velocity limit; pressure at the top fixture = pressure at the base − building height − riser loss. A booster set is listed where the top-fixture pressure is below the required minimum; buildings are split into pressure zones of at most 9 floors with the static head ≤ 42.8 m (NBCS 2026 Part E Sec 1 cl. 4.8.6 — zoning every 7–9 floors within the 4.2 bar limit).

4. Node pressures (peak hour)

NodeTypeGL (m)StoreysDemand L/sHGL (m)Pressure (m)Pressure (bar)Required (m)Status
N1tank100.0010.00120.0020.01.96—PASS
N2junction101.00124.69119.6118.61.8317.0PASS
N3junction102.0010.29120.0018.01.777.0PASS
N4junction101.5041.76120.0018.51.8117.0PASS
N5junction103.0041.76120.0017.01.6717.0CHECK
122.40117.460112.5120107.5180102.624097.6300N120.0 mN418.5 mN318.0 mN517.0 mHGL (peak hour)GL + required residualground levelpressure head (red: below required)Distance along the critical path from the source (m)Level (m)

HGL profile along the critical path N1 → N4 → N3 → N5 (source to the node with the least pressure margin, following the pipe that carries the most flow into each node). Bars: pressure head HGL − GL at each node; dashed red: GL + required residual.

5. Pipe sizing

PipeL (m)Size (mm)ID (mm)MaterialCQ (L/s)V (m/s)h_f (m)Unit loss (m/km)Status
N1 → N2100.08080.0DI140.02.340.470.393.85PASS vmin
N2 → N3100.08080.0DI140.0-2.340.47-0.39-3.85PASS vmin
N3 → N4100.0800800.0DI140.0-4.390.01-0.00-0.00PASS vmin
N4 → N1100.0800800.0DI140.0-6.150.01-0.00-0.00PASS vmin
N3 → N5100.0800800.0DI140.01.760.000.000.00PASS vmin

6. Pumps

Gravity / municipal supply — no pump.

7. Storage

Daily demandUG daysOH daysUG sumpOverheadFire reserveTotal
244.7 kL/d1.50.5367.0 kL122.3 kL0.0 kL489.3 kL

NBCS 2026 Part E Sec 1 cl. 4.4.10 (p. 2527–2528): UGT 1½ day + OHT ½ day (gravity supply from the roof tank) — cl. 4.4.10 (2), Note 2. Per-building overhead tanks are listed in section 3. Enter the fire reserve from the fire-fighting tool in Settings.

8. Worked examples — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Demand — Tower A (largest daily demand)
population from the occupancy rule, then demand = population × LPCD
Given: Type residential · Population basis 200 units × 5 (3 BHK default)
1. Population: P = 200 units × 5 (3 BHK default) = 1,000 persons (NBCS 2026 Part E Sec 1 cl. 4.1 (a) — 1 BHK 3, 2 BHK 4, 3 BHK 5, 4 BHK+ 6 persons; EWS 4, studio 2)
2. Daily demand: Qd = P × LPCD = 1,000 × 135.0 = 135.00 kL/day (NBCS 2026 Part E Sec 1 cl. 4.1.1 (135 urban / 100 water-efficient / 70 rural; 30 of it flushing, cl. 4.1.1.1) · Table 1 (other occupancies))
3. Peak flow: Qpeak = PF × Qd / 86 400 = 3.00 × 135,000 / 86 400 = 4.688 L/s (CPHEEO WS Manual cl. 2.6 — peak factor 3.0 (< 50 000), 2.5 (50 000–2 lakh), 2.0 (> 2 lakh); NBCS 2026 Part E Sec 1 cl. 4.7.1 (b) PF 2–3)
Storage — domestic
UG and overhead volumes from the total daily demand
1. Total daily demand: ΣQd = 244.7 kL/day
2. Underground tank: VUG = ΣQd × daysUG = 244.7 × 1.5 = 367.0 kL (NBCS 2026 Part E Sec 1 cl. 4.4.10 (p. 2527–2528): UGT 1½ day + OHT ½ day (gravity supply from the roof tank) — cl. 4.4.10 (2), Note 2)
3. Overhead tank(s): VOH = ΣQd × daysOH = 244.7 × 0.5 = 122.3 kL (split per building in section 3)
Pipe N4 → N1 (largest flow)
800 mm DI, ID 800.0 mm, C = 140.0, L = 100.0 m
1. Velocity: V = 4Q / (πD²) = 4 × 0.00615 / (π × 0.8000²) = 0.01 m/s
2. Velocity limit: 0.6 ≤ V ≤ 1.8 m/s → 0.01 m/s PASS (CPHEEO WS Manual cl. 7.3 (distribution 0.6–1.8 m/s; typical practice))
3. Friction loss: hf = 10.67 L Q1.852 / (C1.852 D4.87) = 10.67 × 100.0 × 0.006151.852 / (140.01.852 × 0.80004.87) = 0.000 m (with fittings 15 % → 0.000 m; network solution -0.000 m incl. loop balancing)
4. Pressure at N1: P = HGL − GL = 120.00 − 100.00 = 20.0 m (1.96 bar)
5. Maximum pressure: P ≤ 42.8 m → 20.0 m PASS (NBCS 2026 Part E Sec 1 cl. 4.7.5 — maximum 0.42 N/mm² (4.2 bar ≈ 42.8 m); pressure-reducing valves above)
Riser — Tower A (tallest)
12 floors, 1 × 50 mm GI
1. Height of the top fixture: H = (floors − 1) × floor height + 1.0 = (12 − 1) × 3.0 + 1.0 = 34.0 m
2. Riser velocity: V ≤ 2.4 m/s → 2.39 m/s PASS (NBCS 2026 Part E Sec 1 cl. 4.8.6 — ≤ 2.4 m/s in water distribution (copper hot water ≤ 1.5 m/s))
3. Pressure at the top fixture: Ptop = Pbase − H − hf = 18.62 − 34.0 − 9.97 = -25.35 m
4. Minimum at the top fixture: Ptop ≥ Pfixture → -25.4 ≥ 10.2 m → booster 35.5 m CHECK (NBCS 2026 Part E Sec 1 cl. 3.1.2 — residual head at the highest / farthest outlet: 0.18 bar at the tap, 0.5 bar for some fixtures, 1.0 bar (10.2 m) for flush valves)
5. Pressure zones: n = max(⌈floors / zone floors⌉, ⌈static head / Pmax⌉) = max(⌈12 / 9⌉, ⌈33.0 / 42.8⌉) = 2 zone(s) (NBCS 2026 Part E Sec 1 cl. 4.8.6 — zoning every 7–9 floors within the 4.2 bar limit)

9. Bill of quantities (pipes)

MaterialSize (mm)Length (m)
DI80200.0
DI800300.0

10. Formulae applied

QuantityFormulaReference
Average daily demandQ_avg (L/d) = population × LPCD ; Q_avg (L/s) = Q_avg / 86 400CPHEEO WS Manual cl. 2.6 / NBCS 2026 Part E Sec 1 cl. 4.1.1, Table 1
Peak flowQ_peak = PF × Q_avg (+ point loads)CPHEEO cl. 2.6 (PF by population) / DEWA 3.0 / Ten-State 2.5
Population from occupancyP = Σ units(BHK) × persons(BHK) | units × persons/unit | floor area / m² per person | beds | seatsNBCS 2026 Part E Sec 1 cl. 4.1 (1/2/3/4+ BHK = 3/4/5/6)
Hazen-Williams head lossh_f = 10.67 · L · Q^1.852 / (C^1.852 · D^4.87) (Q m³/s, D m, L m)CPHEEO WS Manual cl. 7.2 / AWWA M32
Darcy-Weisbach (option)h_f = f · (L/D) · V²/2g ; f from Swamee-Jain (ε/D, Re)AWWA M32 / Colebrook-White
Minor lossesh_m = K · V²/2g or fittings % of h_ftypical practice
Network solutionGlobal gradient algorithm (nodal continuity + link energy), Newton iteration on headsTodini & Pilati 1988 — EPANET method
Pressure at nodeP (m) = HGL − ground level ; P (bar) = P / 10.197—
Pump dutyH_duty = HGL required at pump discharge − suction water level ; Q_duty = network flow at that headCPHEEO cl. 8 / AWWA M32
Synthetic pump curveH = 1.333·H_d − 0.333·H_d·(Q/Q_d)² (shut-off 133 %, run-out 2·Q_d)EPANET single-point curve
StorageV_UG = 1.5 × Q_day, V_OH = 0.5 × Q_day (gravity) | V_UG = 2.0 × Q_day (hydro-pneumatic) (+ fire reserve)NBCS 2026 Part E Sec 1 cl. 4.4.10 / DEWA
Riser top pressureP_top = P_base − (H_building) − h_f(riser) ≥ P_fixture ; P ≤ 4.2 bar ; zones = max(⌈floors / 9⌉, ⌈H / 42.8 m⌉)NBCS 2026 Part E Sec 1 cl. 3.1.2 / 4.7.5 / 4.8.6 · IPC 604

11. Standards and references

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.