Domestic water supply — risers & branches
Sample project — Tower A · Indian regime · NBCS 2026 (SP 7:2026) Part E Sec 1 · flush-tank · private
Generated 28 Nov 2026 16:09 Fixture units → probable flow → pipe sizes → pressure at the critical fixture → booster Project code SAMPLE
Risers
2
Fixtures
180
WSFU
260.0
Probable flow
6.31 L/s
Largest riser
50 mm
Boosted risers
2
1. Design basis
Item
Value
Reference
Fixture units
private use, flush-tank system
NBCS 2026 Part E Sec 1 Table 2 (Hunter's method; Note 9 hot / cold ¾)
Probable flow
NBCS 2026 Part E Sec 1 Table 3 (flush-tank column)
NBCS 2026 Part E Sec 1 Table 3 / Fig. 2 (to 10 000 FU, linear between the table values)
Pipe
CPVC (IS 15778) · C = 140 · actual bore · velocity ≤ 2.0 m/s risers, 2.4 m/s branches
Hazen–Williams; NBCS 2026 cl. 4.8.6 v ≤ 2.4 m/s (copper hot water 1.5 m/s)
Pressure limit
static ≤ 4.2 bar at the outlets — PRV stations in the riser / downcomer (1 working + 1 standby, strainer, isolation valves, gauges), the next station where the pressure below one passes the limit again, set 2.0 bar
NBCS 2026 Part E Sec 1 cl. 4.7.5 (0.42 N/mm², PRV above); zoning cl. 4.8.6 (7–9 floors)
Booster
where gravity falls short — the top floors down to the lowest short floor · head to suit
project
Residual pressure
0.5 bar at fixtures, 1.0 bar at flush valves
NBCS 2026 Part E Sec 1 cl. 3.1.2 (0.18 bar at taps, 0.5 bar some fixtures, 1.0 bar flush valves)
Source
oht — water level 36 m
project
Fittings allowance
30 % of pipe friction
practice
2. Fixture units and probable demand
Fixture
Nos
WSFU each
WSFU
WC — flush tank
40
2
80
Wash basin
80
1.5
120.0
Shower
40
2
80
Kitchen sink
20
2
40
Each riser plotted at its total WSFU and probable demand — NBCS 2026 Table 3 runs to 10 000 FU; flush-valve and flush-tank demands are the same above 1 000 FU (Table 2 Note 4).
Booster (combination system: these floors on the booster, the rest by gravity): hydro-pneumatic booster set (variable speed) at the OHT / terrace for the top floors — separate boosted riser — floors F9, 17.0 WSFU → 0.77 L/s (46.2 L/min, 2.77 m³/h) at 10.0 m (to give the critical boosted floor its residual + 2 m), boosted riser 25 mm, ≈ 0.14 kW hydraulic · N+1 (duty + standby).
HR-1 — hot riser, downfeed, 40 mm · 90 WSFU · 2.587 L/s
Floor
Level m
Fixtures
WSFU
Branch L/s
Branch mm
v m/s
Zone
Riser from
Σ WSFU carried
Riser L/s
Riser mm
v m/s
Static m
Friction m
Available bar
Static bar
Required bar
PRV
Result
F9
29.7
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
booster
BOOSTER
27.0
1.148
25
1.95
16.2
6.01
0.7
1.59
0.5
N/A
PASSbooster
F8
26.4
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
booster
F9
18.0
0.808
25
1.37
19.5
6.38
0.99
1.91
0.5
N/A
PASSbooster
F7
23.1
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
booster
F8
9.0
0.487
20
1.32
22.8
6.83
1.27
2.24
0.5
N/A
PASSbooster
F6
19.8
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
gravity
OHT
63.0
2.075
40
1.51
15.0
5.97
0.59
1.47
0.5
N/A
PASS
F5
16.5
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
gravity
F6
54.0
1.905
32
1.87
18.3
6.45
0.86
1.79
0.5
N/A
PASS
F4
13.2
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
gravity
F5
45.0
1.703
32
1.67
21.6
6.84
1.15
2.12
0.5
N/A
PASS
F3
9.9
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
gravity
F4
36.0
1.451
32
1.43
24.9
7.13
1.44
2.44
0.5
N/A
PASS
F2
6.6
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
gravity
F3
27.0
1.148
25
1.95
28.2
7.83
1.7
2.76
0.5
N/A
PASS
F1
3.3
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
gravity
F2
18.0
0.808
25
1.37
31.5
8.2
1.98
3.09
0.5
N/A
PASS
GF
0.0
4 × Wash basin, 2 × Shower, 1 × Kitchen sink
9.0
0.487
15
2.39
gravity
F1
9.0
0.487
20
1.32
34.8
8.65
2.26
3.41
0.5
N/A
PASS
Booster (combination system: these floors on the booster, the rest by gravity): hydro-pneumatic booster set (variable speed) at the OHT / terrace for the top floors — separate boosted riser — floors F9, F8, F7, 27.0 WSFU → 1.148 L/s (68.9 L/min, 4.13 m³/h) at 11.1 m (to give the critical boosted floor its residual + 2 m), boosted riser 25 mm, ≈ 0.23 kW hydraulic · N+1 (duty + standby).
Zoning (NBCS 2026 Part E Sec 1 cl. 4.8.6): every pressure zone spans ≤ 9 floors (largest 9).
5. Bill of quantities
Item
Qty
Unit
CPVC (IS 15778) pipe 15 mm
80.0
m
CPVC (IS 15778) pipe 20 mm
86.6
m
CPVC (IS 15778) pipe 25 mm
25.8
m
CPVC (IS 15778) pipe 32 mm
16.5
m
CPVC (IS 15778) pipe 40 mm
22.8
m
CPVC (IS 15778) pipe 50 mm
19.5
m
Hydro-pneumatic booster set — CR-1 (2.77 m³/h @ 10.0 m, duty + standby)
1
set
Hydro-pneumatic booster set — HR-1 (4.13 m³/h @ 11.1 m, duty + standby)
1
set
WC — flush tank
40
nos (taps / stop valves)
Wash basin
80
nos (taps / stop valves)
Shower
40
nos (taps / stop valves)
Kitchen sink
20
nos (taps / stop valves)
6. Checks
Check
Result
Velocity ≤ 2 m/s in risers, ≤ 2.4 m/s in branches
PASS
Residual ≥ 0.5 bar at every fixture (1.0 bar at flush valves) — by gravity or on the booster
PASS
Static pressure at the outlets ≤ 4.2 bar — PRVs in the riser / downcomer set to 2 bar
PASS
Every riser within the standard sizes
PASS
7. Worked examples — from this project
Worked from this project’s own inputs and results — each value can be traced to the schedules above.
Riser CR-1 — F8 branch (critical fixture)
largest riser (170 WSFU, cold, downfeed); the floor with the least pressure margin
Given: Fixtures 4 × WC, 4 × Wash basin, 2 × Shower, 1 × Kitchen sink · Pipe C = 140, fittings + 30 % of friction, branch 8 m
1. Fixture units: WSFU = Σ n · u (two-temperature fixtures × hot / cold share) = 4 × 2 + 4 × 1.5 × 0.75 + 2 × 2 × 0.75 + 1 × 2 × 0.75 = 17 WSFU(NBCS 2026 Part E Sec 1 Table 2, private use)
2. Probable flow (Hunter): Q = f(WSFU) = NBCS 2026 Part E Sec 1 Table 3 (flush-tank column): 10 FU → 30.3 L/min, 20 FU → 53 L/min → 46.19 L/min ÷ 60 = 0.77 L/s(engine 0.77 L/s)
3. Branch velocity at 20 mm (bore 21.7 mm): v = Q / (π d² / 4) = 0.770×10⁻³ / (π × 0.0217² / 4) = 2.08 m/s(15 mm would give 3.78 m/s)
4. Branch size: smallest size with v ≤ 2.4 m/s → 20 mm at 2.08 m/s PASS