DESIGNLINK CALC · calc.designlink.in

Calculators

One guide for the single-purpose design calculators: bus bar, earthing, UPS & battery, psychrometric processes, insulation & condensate, acoustics, special rooms, hot water, rainwater, septic tank.
Every calculator works the same way: fill the inputs on the left (defaults are code values), read the results on the right as you type, then Save, Report (PDF) or Excel. Each result line shows its basis; the report lists the clauses.
Version 1.1 · September 2026

How every calculator works

1. calc.designlink.in → Calculators → pick the card, or open /calc/<name>/ directly.
2. Type a project / reference name. Fill the inputs (grouped; some appear only when they apply — e.g. the earth-mat block when "Design an earth grid" is ticked). Hover the small help text for the code basis of a default.
3. Results update as you type: KPI tiles at the top, result tables with the basis of each line, alternatives table, checks (PASS / CHECK), a worked example and notes.
4. Save keeps the inputs under your name (the address gets a code you can bookmark); Report opens the printable report (Print → PDF); Excel downloads inputs, results and tables.
Numbers in the report are rounded for reading; the Excel keeps full precision. Anything marked "typical" or "practice" is a default you should confirm for the project.

The calculators

CalculatorYou enterYou getBasis
Bus bar / bus ductMaterial, rated current, fault current and duration, arrangement (open / enclosed / busduct), ambient and rise, finish, phase spacingBars per phase and size, continuous rating by heat balance, current density, short-circuit minimum section, force between phases, maximum support spacing, losses, alternativesIEC 61439-1, IS 8623, IEC 60865-1, CDA Copper for Busbars
Earthing setSoil resistivity, target Ω, fault current and time, conductor material, electrode type and size, spacing; optional grid (size, spacing, depth, rods, gravel, grid current, shock time)Single-electrode resistance, number of electrodes / pits for the target with the R-vs-N table, earth strip size with corrosion allowance, PE conductor; grid Rg, GPR, mesh and step voltages vs tolerableIS 3043 cl. 9 / Table 6 / Table 12, IEC 60364-5-54, IEEE 80-2013 (Sverak, Km / Ki / Ks)
UPS & batteryLoad kW and pf, growth, UPS pf and max loading, redundancy N / N+1 / 2N, backup minutes, battery type, DC bus, end voltage, ageing / temperature / marginModule rating and count, battery Ah (constant-power Peukert method), blocks × strings, weight, charger and input current, heat to the room, hydrogen ventilation, alternativesIEEE 485, IEC 62040-3, IEEE 1184
Psychrometric processesProcess (state / mixing / sensible / cooling coil / humidification / energy recovery), altitude, flows, states (DB with WB, RH or DP), ADP and bypass factor, effectivenessAll properties of each state (IP with SI), loads in Btu/h, kW, TR, condensate, water for humidification, recovered energyASHRAE Fundamentals ch. 1 (Hyland-Wexler), Carrier bypass-factor method
Insulation & condensateAmbient DB / RH, surface coefficient, fluid temperature, pipe OD or flat, insulation material, unit TR and SHRDew point, minimum and selected thickness, surface temperature check, heat gain per metre, thickness table, condensate kg/h and drain sizeIS 14164, ASHRAE Fundamentals ch. 23
AcousticsUp to four source levels, distances and source type, barrier, octave-band levels, NC targetSum of sources, level at the receiver, NC rating (tangent method) and dB(A), curve comparisonASHRAE Fundamentals ch. 8
Special roomsClean room: ISO class, ACH, people, process heat, pressurisation · Server: IT kW, losses, ΔT, redundancy · DG / transformer: kVA, heat fraction or losses, ambient / max temperature, louvre velocitySupply air and HEPA count / cooling; server TR and unit count / airflow; DG cooling and combustion air, louvre areas; transformer losses, air and louvresISO 14644-4, ASHRAE, IS 10028, CPWD practice
Hot waterOccupancy and number, litres per unit (table), peak-hour fraction, temperatures, storage fraction and recovery, heat source (electric / heat pump / boiler / solar), loop lengthDaily and peak-hour demand, storage, heater kW and units, plant description, daily energy, recirculation flow, pipe and pumpIS 2065, NBC 2016 Pt 9, ASHRAE Applications ch. 51
RainwaterRoof, paved and green areas, annual rainfall, design storm, storage days and demand, downpipe count, gutter type, soil, pit sizeAnnual harvest, first flush, tank, downpipe DN and gutter, storm runoff, recharge pit capacity and countNBC 2016 Pt 9, IS 15797, BS EN 12056-3 (Wyly-Eaton), CGWB manual
Septic / soak / greaseUsers, sewage per user, detention, desludging interval, depth; percolation rate and disposal type; meals or sinks, retentionTank volume and L × B × depth, IS 2470 table for reference, soak pit / trench size, grease-trap capacityIS 2470 Parts 1 & 2, NBC 2016
Lightning protection (IEC 62305)Building L × W × H and protrusions, location factor, use and occupants, construction and roof, city (Ng from thunderstorm days) or your Ng, fire risk and provisions, floor, incoming lines (overhead / buried, lengths, transformer), SPD level, tolerable risk; LPS class (auto or forced), air-termination method, rod height, conductor material, soil resistivityCollection areas, ND / NM / NL / NI, loss factors, risk components RA–RZ and R1 with and without LPS, the lowest class that meets RT, mesh size / rolling sphere / protective angle, rods, down conductors, separation distance, Type B ring earth with l1 and resistance, SPD ratings, BOQ; roof plan (SVG, DXF)IEC 62305-2 (Annex A–C), IEC 62305-3 (Tables 2, 4, 6, 7, Fig. 1 & 3), IEC 61643, IS 3043, NBC 2016
Rooftop solar PVCity (GHI + temperature) or latitude + annual GHI, tilt, azimuth, target kWp or fill-the-roof, roof size and setback, module datasheet, inverter window and MPPTs, losses, cable lengths and drop limits, economicsCold Voc / hot Vmp and modules per string, strings, inverters and DC/AC ratio, row pitch without winter shading, monthly generation (transposition, cell temperature, losses), PR / CUF / specific yield, DC and AC cables, string fuses, isolators, SPDs, AC breaker, RCD, payback and CO₂; roof layout + string SLD (SVG, DXF)IEC 62548, IEC 60364-7-712, IS 16221 / IEC 62109, CEA connectivity regulations, MNRE specifications
Swimming poolPool type, size and depths, edge type, indoor / outdoor, turnover and bather area (or by type), filtration rate and filter count, backwash, pump head / pipe run / efficiency, heating type and design conditions, water treatment, plant-room size (auto or given)Volume, bathers, circulation flow, filters (vessels, rate, backwash), pumps (duty / standby, kW), pipe sizes, balance tank, evaporation / convection / radiation / heat-up → heater and heat-pump input, dosing, UV / ozone, make-up water, equipment and pipe schedules; plant room plan (SVG, DXF) and 3DPWTAG Code of Practice, IS 3328, ASHRAE Applications (natatoriums), NBC 2016
Gas suppressionAgent (FK-5-1-12, HFC-227ea, HFC-125, IG-541 / IG-55 / IG-100, CO₂), hazard class, concentration (or NFPA minimum), occupancy, temperatures, altitude, room and voids, enclosure strength, hold time, cylinder size / pressure / fill, nozzle coverage and height, pipe run, reserveAgent per zone and total, concentration at max temperature vs NOAEL / LOAEL, cylinders and bank weight, storage footprint, nozzle grid, discharge rate and preliminary pipe size, relief-vent area, detectors and release hardware, BOQ; nozzle / detection plan (SVG, DXF) and 3DNFPA 2001 (Ch. 5, Annex A), NFPA 12, ISO 14520 / IS 15493, NFPA 72 / IS 2189
HT & LT panel GA drawingsProject data, system (voltage, kA, ambient, IP, reference design, sheet, paint, base, transport length), busbar policy (Al / Cu, rise, neutral %, earth, dropper factor, sleeves), switchgear policy (makes per class, release policy, Ics, drawout, ELR, spares), controls (aux supply, BMS / PLC, lamps, SPD, AMF), wiring policy (sizes, type, ferrules, colours); panels table (type, form, front, entry, busduct, IP, kA, sections, height, qty, busbar override); feeders table (panel, section, role, device, In, poles, function, kW / Ib, metering, EDO, release, make, model, cable, BMS) — or import from an SLD project / Excel templatePer panel: switchgear picked by frame and Icu with dims and losses, busbars (main, neutral, earth, risers, droppers) by heat balance and IEC 60865 supports, RDF check, tier packing into columns and TR shipping sections, front / internal / top / rear / side views and section A-A (SVG, DXF A3 sheets), panel-wise SLD with feeder schedule, control schematics per typical with wire numbers and terminal strips, wiring from-to list, IEC 60890 heat check per column, IEC 61439 verification matrix, nameplate and routine-test checklist, BOM by kg / m with make column, Excel with formulas, detailed 3D (doors off to see busbars, droppers, CTs, terminals); HT 11 / 33 kV VCB cubicles LSC2B-PMIS/IEC 61439-1 & 2, IS 8623, IEC 60890, IEC 60865, IEC 60529, IEC 60947, IS 2705, IS/IEC 62271-200 / -100, IS 3427, IEC 81346, IEC 60445, IEC 60204-1, IS 5578, CPWD GS 2023, CEA 2023

Drawings and 3D (lightning, PV, pool, gas)

1. These four calculators add a Drawing tab beside Results (the roof plan, array + SLD, plant room, nozzle layout) that redraws as you type.
2. DXF in the top bar downloads the drawing in millimetres with layers, schedules and notes (one design credit unlocks the report, Excel and DXF of a project for 30 days; company users and Unlimited plans have everything included).
3. Pool and gas also have a 3D tab: drag to orbit, right-drag to pan, wheel to zoom, tick the groups to look inside, click an object for its name and size.
The DXF is a preliminary layout for coordination: lightning conductors and earth pits, PV rows and strings, plant-room equipment and pipe headers, nozzle and detector positions. Final routing, structural checks and the supplier's listed hydraulic calculation (gas) still follow.

Reading the checks

Green PASS means the selected size or arrangement satisfies the rule on that line (rating ≥ duty, stress ≤ permissible, mesh voltage ≤ tolerable, surface ≥ dew point…). A red CHECK tells you what to change: the note on the line says which input to move (more electrodes or spacing, a larger bar or more bars, thicker insulation, lower ISO class air changes…). Change the input and the check turns green live.

Frequently asked questions

Can I keep several cases? Save each with a different name; each has its own address.

Do the results go into the other tools? Not yet automatically — copy the values (e.g. earth strip size to the BOQ, condensate drain to the plumbing drawing). The building-model tools will pick them up in a later release.

Where do the defaults come from? The help text under the field; the report's references section lists the standard and clause.