What this tool does

You give it the site plan with the hydrant ring main, tell it where the fire pump house is, which buildings there are (height, hazard class, number of wet risers, sprinklered or not) and it calculates, in the way a fire consultant would by hand:

Rule sets: India (IS 15105, IS 3844, IS 13039, NBC 2016 Part 4 Table 7), International (NFPA 13 / 14 / 20 / 22 / 24), FM Global (DS 2-0, 3-26, 3-2, 3-7, 3-10) and Gulf (UAE Fire & Life Safety Code, SBC 801, QCDD). Every value can be overridden and every clause is printed in the report. Outputs: Report (print to PDF), AutoCAD DXF (plan with hydrants, pressures, pipe sizes, riser schematics, summary) and Excel (nodes, pipes, buildings, calculation sheets, scenarios, pump & tank).

Contents

  1. Before you start — what the drawing must contain
  2. Open the tool and create a project
  3. Step 1 · Upload the DXF
  4. Step 2 · Hydrant ring-main layer
  5. Step 3 · Hydrants
  6. Step 4 · Fire pump house and tank
  7. Step 5 · Ground levels
  8. Step 6 · Buildings
  9. Step 7 · Design rules
  10. Step 8 · Calculate, read the results, fix problems
  11. The calculation sheet explained
  12. Getting the report, the drawing and the Excel
  13. Frequently asked questions

1. Before you start — what the drawing must contain

ItemHow to draw itLayer name (example)
Hydrant ring mainPolylines or lines along the underground main. A closed loop around the site is usual; branches are fine. Ends must touch (within 5 cm).FIRE-MAIN
BuildingsClosed polylines (outer outline); a text inside becomes the name.BLDG (+ BLDG-TXT)
Ground levelsNumber texts, contours or 3D points (finished levels).FGL
Hydrant symbols (optional)Blocks / circles / points at the hydrant positions on the main.FH
Pump house, tank, roadsAny layer — copied to the output drawing as reference.PUMP, ROAD …

2. Open the tool and create a project

a. Go to calc.designlink.in → Fire fighting hydraulics. Sign in when asked.
b. Type the project name, choose the Standard (India / NFPA / FM Global / Gulf) and click Create.

3. Step 1 · Upload the DXF

Click DXF file, choose the drawing; check the size shown in metres (fix Drawing units and re-upload if it is wrong). Without a drawing, import the Excel schedule (Nodes / Pipes / Buildings).

4. Step 2 · Hydrant ring-main layer

Click the ring-main layer in the Layers list. The message tells you how many pipes and nodes were found and how many dead ends. A closed ring has no dead ends; if it reports some, set Merge gaps 0.5 m and re-read.

5. Step 3 · Hydrants

a. Type the hydrant spacing (default from the code: 45 m India, 90 m NFPA, 60 m Gulf) and click Auto-place hydrants. Nodes are inserted along the ring at that spacing and every node except the pump house becomes a hydrant (red circle).
b. Or click the hydrant-symbol layer to match your drawn hydrants to the nearest nodes, or click nodes on the plan to toggle them.

The tool uses the hydrants farthest from the pump for the hydrant scenario, so it is enough that the far end of the site has hydrants.

6. Step 4 · Fire pump house and tank

a. Click the ring node next to the pump house. It becomes the pump node (red square).
b. In the editor type the tank water level below ground (e.g. 3 m for an underground static tank) and leave the pump on auto. Choose "given" and type flow / head to check an existing pump.

7. Step 5 · Ground levels

Click the level layer(s). Nodes marked assumed need a typed level. Building heights are measured from the ground level of the ring node they connect to.

8. Step 6 · Buildings

a. Click the building outline layer; every outline becomes a building connected to the nearest ring node.
b. Click each building and fill in:
c. Check the ring-main connection: click the correct node on the plan or press Nearest node.

9. Step 7 · Design rules

SettingMeaningIndia defaultNFPA default
Ring / riser materialC value and sizesDI ring, MS riserssame
Riser flow, top pressure, max pressureWet riser / standpipe demand1 800 L/min, 3.5 bar top, 7 bar max1 893 (+946 each add'l), 6.9 bar, 12.1 bar
Hydrant flow, residual, spacing, simultaneousExternal hydrant scenario1 800 L/min, 3.5 bar, 45 m, 23 785 L/min, 1.4 bar, 90 m, 1
V max riser / ringVelocity limits6 / 5 m/s6.1 / 6.1 m/s
Fittings %0 = use the NFPA equivalent-length table per fitting; otherwise a % of pipe length20 %0 (table)
Pump head marginAdded to the calculated head3 m3 m
Riser / hydrant durationFor the tank volume30 / 60 min30 / 60 min

10. Step 8 · Calculate, read the results, fix problems

a. Click Calculate. The summary line shows the pump duty, the tank and the governing scenario.
b. Results tabs:
SymptomMeaningWhat to do
Scenario CHECK (head available < required)Only with a "given" pump that is too smallSwitch to auto or increase the pump
PRV floors listedLanding valves on those floors see more than the maximum outlet pressureProvide PRV-type landing valves or orifice plates there (report lists the floors)
Riser V > limitRiser size lock too smallRaise the lock
Hydrants fewer than neededRing length ÷ spacing > hydrants placedAuto-place again or add hydrants
Pump flow much higher than the scenariosThe NBC Table 7 band for the tallest building sets a minimum (India)Normal — the table governs; the band is shown

11. The calculation sheet explained

The sheet starts at the most remote sprinkler head and walks back to the building connection, one row per node, in the format used by NFPA 13 and by Pipenet / Elite reports:

ColumnMeaning
Node, ElevNode name (H1-4 = branch 1, head 4; CM = cross main; RT = riser top; CONN = connection) and height above the connection
K, q headK factor of the head and its discharge q = K√P
QFlow in the pipe leaving the node towards the source (all heads upstream added)
PtTotal pressure at the node (bar)
Pipe, Size, L, Fittings, Leq, Ltot, CThe pipe to the next node: nominal size, actual length, fittings counted (tee, elbows, valves) with their equivalent length from the NFPA table, total length, Hazen-Williams C
V, pf/m, PfVelocity, friction loss per metre and total friction loss in the pipe
PeElevation pressure change (positive when the next node is lower)
Pnext= Pt + Pf + Pe — the pressure at the next node, which starts the next row

Branches that are not on the remote path are solved at the same time (their heads discharge more because the pressure there is higher); their flows are listed under the sheet. The last row is the connection: its flow plus the hose allowance is the sprinkler demand of the building.

12. Getting the report, the drawing and the Excel

Report — Report → new tab → Print / Save PDF (A4 landscape). Sections: criteria with clauses, buildings, calculation sheets, scenarios, pump with curve, tank, node pressures, ring pipes, worked example, BOQ, formulae, references.
AutoCAD DXF — plan with the ring (size, flow, velocity), hydrants (FH), pump house, node pressure boxes, building tags with sprinkler and riser demands, a wet-riser schematic per building with landing valves and PRV floors, summary table, legend and notes.
Excel — Nodes, Pipes, Buildings, one Calc sheet per sprinklered building, Scenarios, Pump & tank, BOQ, Summary.

13. Frequently asked questions

Why is the sprinkler flow higher than density × area? Because heads nearer the riser see more pressure and discharge more than the minimum — that is the real demand, and the reason the calculation is done head-to-head.

Is the whole sprinkler system drawn? No — only the hydraulically most remote design area (the standard method). The tree is generated from the design area and the head spacing: heads per branch = 1.2·√area ÷ spacing (NFPA 13), pipe sizes from the pipe schedule, then checked for velocity.

How are the three scenarios combined? The pump flow is the largest scenario flow (or the code table, India), the pump head is the largest head any scenario needs; each scenario is then checked against the pump curve. Change "hydrants operating simultaneously" or the riser flow to match your authority's requirement.

Sprinkler and riser from separate pumps? Run the tool twice: once with sprinklered = no (hydrant/riser pump), once with the riser flow set to 0 in the rules (sprinkler pump).

Which building governs? The one needing the highest head at the pump — usually the tallest or the farthest. It is named in the summary.

Verify the code values. The rule sets are transcribed from the standards named in the report; NBC Table 7 values are indicative by height band — confirm the row for your occupancy and the local fire authority's requirements before issue.