You give it the site plan with the hydrant ring main, tell it where the fire pump house is, which buildings there are (height, hazard class, number of wet risers, sprinklered or not) and it calculates, in the way a fire consultant would by hand:
Rule sets: India (IS 15105, IS 3844, IS 13039, NBC 2016 Part 4 Table 7), International (NFPA 13 / 14 / 20 / 22 / 24), FM Global (DS 2-0, 3-26, 3-2, 3-7, 3-10) and Gulf (UAE Fire & Life Safety Code, SBC 801, QCDD). Every value can be overridden and every clause is printed in the report. Outputs: Report (print to PDF), AutoCAD DXF (plan with hydrants, pressures, pipe sizes, riser schematics, summary) and Excel (nodes, pipes, buildings, calculation sheets, scenarios, pump & tank).
| Item | How to draw it | Layer name (example) |
|---|---|---|
| Hydrant ring main | Polylines or lines along the underground main. A closed loop around the site is usual; branches are fine. Ends must touch (within 5 cm). | FIRE-MAIN |
| Buildings | Closed polylines (outer outline); a text inside becomes the name. | BLDG (+ BLDG-TXT) |
| Ground levels | Number texts, contours or 3D points (finished levels). | FGL |
| Hydrant symbols (optional) | Blocks / circles / points at the hydrant positions on the main. | FH |
| Pump house, tank, roads | Any layer — copied to the output drawing as reference. | PUMP, ROAD … |
Click DXF file, choose the drawing; check the size shown in metres (fix Drawing units and re-upload if it is wrong). Without a drawing, import the Excel schedule (Nodes / Pipes / Buildings).
Click the ring-main layer in the Layers list. The message tells you how many pipes and nodes were found and how many dead ends. A closed ring has no dead ends; if it reports some, set Merge gaps 0.5 m and re-read.
The tool uses the hydrants farthest from the pump for the hydrant scenario, so it is enough that the far end of the site has hydrants.
Click the level layer(s). Nodes marked assumed need a typed level. Building heights are measured from the ground level of the ring node they connect to.
| Setting | Meaning | India default | NFPA default |
|---|---|---|---|
| Ring / riser material | C value and sizes | DI ring, MS risers | same |
| Riser flow, top pressure, max pressure | Wet riser / standpipe demand | 1 800 L/min, 3.5 bar top, 7 bar max | 1 893 (+946 each add'l), 6.9 bar, 12.1 bar |
| Hydrant flow, residual, spacing, simultaneous | External hydrant scenario | 1 800 L/min, 3.5 bar, 45 m, 2 | 3 785 L/min, 1.4 bar, 90 m, 1 |
| V max riser / ring | Velocity limits | 6 / 5 m/s | 6.1 / 6.1 m/s |
| Fittings % | 0 = use the NFPA equivalent-length table per fitting; otherwise a % of pipe length | 20 % | 0 (table) |
| Pump head margin | Added to the calculated head | 3 m | 3 m |
| Riser / hydrant duration | For the tank volume | 30 / 60 min | 30 / 60 min |
| Symptom | Meaning | What to do |
|---|---|---|
| Scenario CHECK (head available < required) | Only with a "given" pump that is too small | Switch to auto or increase the pump |
| PRV floors listed | Landing valves on those floors see more than the maximum outlet pressure | Provide PRV-type landing valves or orifice plates there (report lists the floors) |
| Riser V > limit | Riser size lock too small | Raise the lock |
| Hydrants fewer than needed | Ring length ÷ spacing > hydrants placed | Auto-place again or add hydrants |
| Pump flow much higher than the scenarios | The NBC Table 7 band for the tallest building sets a minimum (India) | Normal — the table governs; the band is shown |
The sheet starts at the most remote sprinkler head and walks back to the building connection, one row per node, in the format used by NFPA 13 and by Pipenet / Elite reports:
| Column | Meaning |
|---|---|
| Node, Elev | Node name (H1-4 = branch 1, head 4; CM = cross main; RT = riser top; CONN = connection) and height above the connection |
| K, q head | K factor of the head and its discharge q = K√P |
| Q | Flow in the pipe leaving the node towards the source (all heads upstream added) |
| Pt | Total pressure at the node (bar) |
| Pipe, Size, L, Fittings, Leq, Ltot, C | The pipe to the next node: nominal size, actual length, fittings counted (tee, elbows, valves) with their equivalent length from the NFPA table, total length, Hazen-Williams C |
| V, pf/m, Pf | Velocity, friction loss per metre and total friction loss in the pipe |
| Pe | Elevation pressure change (positive when the next node is lower) |
| Pnext | = Pt + Pf + Pe — the pressure at the next node, which starts the next row |
Branches that are not on the remote path are solved at the same time (their heads discharge more because the pressure there is higher); their flows are listed under the sheet. The last row is the connection: its flow plus the hose allowance is the sprinkler demand of the building.
Why is the sprinkler flow higher than density × area? Because heads nearer the riser see more pressure and discharge more than the minimum — that is the real demand, and the reason the calculation is done head-to-head.
Is the whole sprinkler system drawn? No — only the hydraulically most remote design area (the standard method). The tree is generated from the design area and the head spacing: heads per branch = 1.2·√area ÷ spacing (NFPA 13), pipe sizes from the pipe schedule, then checked for velocity.
How are the three scenarios combined? The pump flow is the largest scenario flow (or the code table, India), the pump head is the largest head any scenario needs; each scenario is then checked against the pump curve. Change "hydrants operating simultaneously" or the riser flow to match your authority's requirement.
Sprinkler and riser from separate pumps? Run the tool twice: once with sprinklered = no (hydrant/riser pump), once with the riser flow set to 0 in the rules (sprinkler pump).
Which building governs? The one needing the highest head at the pump — usually the tallest or the farthest. It is named in the summary.
Verify the code values. The rule sets are transcribed from the standards named in the report; NBC Table 7 values are indicative by height band — confirm the row for your occupancy and the local fire authority's requirements before issue.