USER GUIDE

Load estimation & DB schedules

Rooms → lighting, small power, AC, HVAC and equipment loads by regime (NBC / CPWD / ECBC or IEC / BS 7671 / ASHRAE), circuits with CPWD limits, DB schedules balanced R-Y-B, floor and main panel demand with diversity, transformer size — and the feeder schedule straight into Power Distribution Design.

NBCS 2026 Part D Sec 2 · CPWD · IEC 60364

How to use it

  1. Set the basis: regime (Indian / International), system voltage and pf, boards scheme (combined LPDB or LDB + PDB per floor and zone), panel tree, demand factors, and the plant loads at the panels (lifts, pumps, chillers).
  2. Add rooms — type them, import the Excel, pull them from a Building-model project (areas and names) or from a Lighting project (designed lighting watts and luminaire counts).
  3. Check the room-wise loads: every auto value (light W, points, sockets, AC units, equipment) can be typed over; set the board tag where you want rooms grouped by hand.
  4. Read the DB schedules (circuits, phases, MCBs, wires, incomer, RCCB, unbalance) and the panel tree with demand, kVA and the transformer / DG size.
  5. Export the report and the Excel (rooms, one sheet per board, panels, feeders), then Send to PDD for the cable sizing, fault levels and SLD.

Inputs

FieldType / defaultMeaning
Roomsfloor, zone, name, occupancy type, area
Overrideslight W / points, 6 A and 16 A points, AC kind / units, equipment kW, board, panel
Basisregime, voltage, pf, boards and panel scheme, ways and spare, demand factors, plant loads

What you get

OutputContent
Loadsconnected by category per room and floor, W/m²
DB schedulescircuits with description, points, W, phase, MCB, wire; incomer, RCCB, ways, unbalance
Panelsfloor / main demand with diversity, kVA, transformer and DG size; feeder schedule for PDD

Standards applied

Good to know