USER GUIDE

Lightning protection & earthing layout

Roof footprint from the plan DXF or the building model → IEC 62305-3 mesh and rods, down conductors at the class spacing, Type B ring earth with pits and resistance, separation distance, equipment earthing pits and strips (IS 3043 / CPWD) — layout DXF on layers, report, BOQ.

IEC 62305-3 · IS 3043 · CEA 2023

How to use it

  1. Get the roof footprint: upload the plan DXF and pick the closed outline, pull the top storey of a Building-model project, or type a rectangle.
  2. Set the class of LPS (from the Lightning protection calculator's risk assessment), the air-termination method, rod height, building height, and whether the RCC rebars are the down conductors.
  3. Enter the soil resistivity, rod and ring data and the target resistance; the fault current and clearing time size the equipment earth strips.
  4. Add roof protrusions (a rod goes on each) and the equipment to be earthed with their positions; pits and strips are placed outside the nearest wall.
  5. Read the plan and the checks (spacing, resistance, l1, separation); export the layout DXF, the report and the BOQ.

Inputs

FieldType / defaultMeaning
Footprintclosed polygon in metres
LPSclass, method, rod height, height, natural down conductors, km
Earthρ, rod L / d, ring offset and depth, target R, material
Equipmentkind, position, pit override; fault kA and time for strips

What you get

OutputContent
Planmesh, rods, down conductors, ring, pits, strips
Checksspacing, resistance, l1, separation
DXF / report / BOQlayers, schedule, legend; quantities

Standards applied

Good to know