USER GUIDE
Transformer, DG & UPS sizing
Every feed of the load estimate classified essential / non-essential / UPS / fire → transformers (N or N+1 at the loading you set), DG sets derated for site altitude and ambient with the loading sequence — fire pump first, motors by starting kVA, transient dip per step — and the UPS with its battery bank; report and Excel.
IS 10002 · ISO 8528 · IS 1180 · IEEE 485
- IS 10002:1981 — Performance requirements for constant speed compression ignition (diesel) engines for general purposes
DG set rating, derating for altitude and ambient
- ISO 8528-1 / -5 — Reciprocating internal combustion engine driven alternating current generating sets — ratings, transient performance
Prime / standby ratings, load acceptance classes G1–G3, transient voltage dip
- IS 1180 (Part 1):2014 — Outdoor type oil-immersed distribution transformers up to 2500 kVA, 33 kV
Typical impedance (%Z) by rating
- IEEE Std 485-2020 — Sizing lead-acid batteries for stationary applications
Battery capacity, ageing and temperature factors
- NBCS 2026 (SP 7:2026) Part D Sec 2 — National Building Construction Standards — Electrical and allied installations
Load assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
- NBCS 2026 (SP 7:2026) Part F — National Building Construction Standards — Fire and life safety
Means of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
- CPWD General Specifications for Electrical Works (Part I Internal, Part IV Substation) — CPWD specifications
Voltage-drop cascade limits, cable/wiring practice, panel and metering requirements