USER GUIDE

Technical specification maker

The firm's complete technical specifications, ready to issue — Electrical works (HT panel to EV charging, 17 sections), Fire fighting, Fire alarm & PA, HVAC (22 sections incl. lifts), Internal and External plumbing, ITS & ELV, plus the special systems (auditorium AV, medical gases, LPG / PNG, pools, car parks, kitchens & laundry) — about 330,000 words in the house style: SECTION I…N, Scope of work, Codes and standards listed once, item clauses, Measurement, End of Section. Three profiles (Government / Private on the Indian codes, International with every Indian code mapped to IEC / ISO / NFPA / EN), the project, site conditions and building names typed once, every clause editable and kept as the company's house version; Word (A4, Contents, page numbers), preview and a clause-by-clause compliance sheet

CPWD GS · IS · IEC · NFPA

How to use it

  1. Choose the profile — Government / Private use the house clauses on the Indian codes; International replaces every Indian code with its IEC / ISO / NFPA / EN equivalent — and type the project, employer, consultant, site conditions (ambient, altitude, seismic zone, fire authority, electrical inspectorate) and the building names.
  2. Tick the documents or the sections you need: Electrical works (17 sections, HT panel to EV charging), Fire fighting, Fire alarm & PA, HVAC (22 sections incl. lifts), Internal and External plumbing, ITS & ELV, and the special systems; the sections are numbered SECTION I, II … with Scope of work, Codes and standards, the item clauses and Measurement, 'End of Section'.
  3. Read the document: every clause can be edited, removed or added; clauses that name the project buildings are marked project-specific — check their wording; codes are listed once per section under Codes and standards and in the schedule at the end. Keep edited clauses as your firm's house version (shared by the company).
  4. Approved makes per section, project values from the hub (cable sizes, DBs, luminaires, chillers …) for edited or added clauses, then Preview / Word (A4, Arial, running header, Contents, page numbers) and the clause-by-clause compliance sheet for the tender.

Inputs

FieldType / defaultMeaning
ProfileGovernment / Private (Indian codes) · International
Projectname, location, state, employer, consultant, phase, document ref / revision / date
Green tierECSBC 2024 — ECSBC / ECSBC+ / Super ECSBC (with the water, waste, IEQ, controls & IoT, commissioning, materials and power-quality chapters), LEED v4.1, GRIHA 3 / 4 / 5 star with the climate zone — the figures (chiller COP, fan and pump power, VFDs, motor class, insulation, LPD, controls, transformer level, metering, fixture flows, recycled water, commissioning) go into every governed section and the schedule; override any on the Values tab
GTPguaranteed technical particulars tables for transformer, DG, HT / LT panels, UPS, bus duct, chiller, cooling tower, pumps, AHU, VRF, fire pumps, lifts, STP, booster set — project figures from the hub, Offered column for the vendor
Siteambient, altitude, seismic zone, fire authority, electrical inspectorate, building names
Sectionsany of the ~75 house sections; options on the special systems
Editsclause edits, removals, additional clauses, approved makes, value overrides

What you get

OutputContent
Specificationhouse-style document: SECTION I…N, numbered clauses, lettered lists, tables, End of Section
Word.docx A4 with Contents and page numbers
Compliance sheetclause-by-clause Excel for the tenderer
Schedulecodes and standards cited, once

Standards applied

Good to know