SAMPLE Power distribution design — this is what your report looks like, generated from demo inputs. Generate yours → 2 free designs every day for every signed-in account · 1 design free on sign-in · ₹99 + GST per design (report + Excel + DXF) · free for DesignLink companies
Report ready — use Print → Save as PDF (A4 landscape).
Design Linkcalc.designlink.in

Power distribution design

Sample project — Tower A · Indian regime · NBCS 2026 (SP 7:2026) Part D Sec 2 · VD basis split (NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a) · autofix short-circuit sizing · 22 sections
Generated 28 Nov 2026 16:09
Sources → fault levels → cable schedule → HT cables → SLD
Project code SAMPLE
Feeders
6
Demand kW
201.0
Worst fault level
36.0 kA
Study fails
0
Scenarios
4
VD failures
0
SC withstand fails
0
HT cable fails
0

1. Source of supply

SourceDescriptionRatingImpedance dataConnection
Utility11 kV point of supply250 MVA declared—grid
TR-111KV/0.433KV oil transformer, ONAN1600 kVA%Z 6.25 · X/R 7 (library)section 1 · bbt
TR-211KV/0.433KV oil transformer, ONAN1600 kVA%Z 6.25 · X/R 7 (library)section 2 · bbt
DG-1diesel genset via DG synchronising panel1000 kVAxd″ 16 % · X/R 14 (library)section 1
DG-2diesel genset via DG synchronising panel1000 kVAxd″ 16 % · X/R 14 (library)section 2
Solar PV500 kWp, 5 × 100 kW inverterscurrent sourcek = 1.2 × I rated (IEC 60909-0:2016 6.5.4)section 1
Main LT panel2 incomer section(s), coupler normally open (sectionalised)

Scenarios evaluated: grid, dg, grid+inv, dg+inv. The worst case at each bus governs the breaker rating and the cable withstand. Design loop converged in 1 iteration(s).

2. HT side — fault levels and cables

BuskVMVAIk″ kABasis
11 kV point of supply11250.013.12utility declared fault level
11 kV HT panel bus11250.013.12HT cable impedance neglected (conservative)
FeederkVkVAIb ALength mDeratingCable × runsIz AS min (3-ph, t s)Screen min / haveVD %GovernsCheck
11 kV incomer → HT panel113200168.060.01.0 (soil 30 °C k1 1.0 · ρ 1.2 k2 1.0 · group 1 k3 1.0 · depth 0.9 m k4 1.0)3C X 150 Sq.mm, Al 11kV XLPE × 1260139.6 (1.0 s, 13.12 kA)7.0 / 250.044short-circuitPASS
HT panel → TR-111160084.060.01.0 (soil 30 °C k1 1.0 · ρ 1.2 k2 1.0 · group 1 k3 1.0 · depth 0.9 m k4 1.0)3C X 150 Sq.mm, Al 11kV XLPE × 1260139.6 (1.0 s, 13.12 kA)7.0 / 250.022short-circuitPASS
HT panel → TR-211160084.060.01.0 (soil 30 °C k1 1.0 · ρ 1.2 k2 1.0 · group 1 k3 1.0 · depth 0.9 m k4 1.0)3C X 150 Sq.mm, Al 11kV XLPE × 1260139.6 (1.0 s, 13.12 kA)7.0 / 250.022short-circuitPASS

HT cable checks: Iz (derated) ≥ Ib; S ≥ Ik″·√t / k with the HV protection clearing time (IEC 60364-4-43 / IEC 60949); screen ≥ Ief·√t / k; voltage drop ≤ limit. Typical IS 7098-2 / IEC 60502-2 data — confirm with the manufacturer's catalogue.

3. LT fault levels by bus and scenario

BusIk″ kA — gridIk″ kA — dgIk″ kA — grid+invIk″ kA — dg+invWorst kABreaker Icu ≥ kA
AHU-11.201.081.201.081.206
CHILLER-110.838.2810.838.2810.8316
HVAC PANEL15.0711.1215.9011.9515.9016
LIGHTING DB7.956.728.787.558.7810
MAIN LT PANEL source35.1417.8935.9718.7235.9736
PUMP-13.453.063.453.063.456
SMDB-111.949.2712.7710.1012.7716

Each supply scenario is solved separately with the IEC 60909 impedance method (cmax = 1.05 for the maximum current): grid = transformers (with the upstream network) feeding the main LV panel sections as connected; dg = gensets only (cmin = 0.95 for the minimum-current check); +inv = with the PV / battery inverters contributing about 1.2 × their rated current (IEC 60909-0:2016 §6.5.4). Fault levels are cascaded bus to bus through the cable impedances at 20 °C. The breaker at every bus is chosen for the worst scenario, and the cable withstand of every feeder uses the fault level at its upstream bus. The design loop re-sizes cables with the new levels until no level changes by more than 2 %.

Fault level per bus and scenario, with the breaker Icu chosen for the worst case

Ik″ — gridIk″ — dgIk″ — grid+invIk″ — dg+invbreaker Icu step (≥ Ik″)0510152025303540AHU-11.21.11.21.1Icu 6CHILLER-110.88.310.88.3Icu 16HVAC PANEL15.111.115.911.9Icu 16LIGHTING DB8.06.78.87.5Icu 10MAIN LT PANEL35.117.936.018.7Icu 36PUMP-13.53.13.53.1Icu 6SMDB-111.99.312.810.1Icu 16Fault level at the bus, kA (IEC 60909, c = 1.05)

4. Short-circuit method

ZT = %Z/100 · U²/S (R, X split by X/R)  ·  ZQ = c·U²/S"kQ (utility, in series)  ·  ZG = Xd"/100 · U²/S (DG)
Zcable = (R·f20°C + jX)·L/1000/runs  ·  Ik" = c·Un/(√3·|Zk|), c = 1.05 (max) / 0.95 (min)  ·  κ = 1.02 + 0.98·e−3R/X, ip = κ·√2·Ik"
Breaker: Icu ≥ Ik" at its bus → next standard step  ·  Cable: Smin = Ik"·√t / k (k: Cu XLPE 143, Cu PVC 115, Al XLPE 94, Al PVC 76; t: MCB 0.01 s, MCCB 0.03 s, ACB 0.4 s)  ·  MCB ≤ 63 A: Smin = √(I²t let-through of a class-3 MCB, IEC 60898-1 Annex ZC) / k (marked I²t); adiabatic for MCCB / ACB
Discrimination: downstream slowest trip < upstream fastest trip for all currents up to Ik" at the bus (bands ±10 % I, ±20 % t). Long-time t = tr·35/((I/Ir)²−1); short-time definite tsd above Isd; instantaneous ti above Ii.

5. Short-circuit sources (worst scenario)

Scenario: grid — the worst case for the LV buses; every scenario's levels are in the LT fault-level table.

NameBusTypekVA%Z / Xd"X/RUpstream MVAOn
TR-1MAIN LT PANELtransformer1600.06.257.0250.0Yes

6. Fault level at each bus — impedance, X/R, peak

BusZ (mΩ)X/RIk" 3φ (kA)ip peak (kA)Breaker Icu ≥ (kA)Ik" DG-only (kA)
HVAC PANEL18.010.8913.9720.816.0
MAIN LT PANEL (source)7.457.2133.7779.636.0
SMDB-121.560.5711.6716.916.0

Fault level per bus — Ik″ and peak ip with the breaker Icu

Ik″ 3φ (kA)ip peak (kA)Ik″ DG-only (kA)breaker Icu step (≥ Ik″)0102030405060708090HVAC PANEL14.020.8Icu 16MAIN LT PANEL33.879.6Icu 36SMDB-111.716.9Icu 16Fault level at the bus, kA (IEC 60909)

7. Feeders — fault current, breaker Icu, cable withstand

#From busToCable / bus ductL mR+jX seg (mΩ)Z cum (mΩ)X/RIk" From (kA)Ik" To (kA)ip (kA)BreakerIcu (kA)S min / have (sqmm)I²tIk" DG (kA)
1MAIN LT PANELSMDB-14C X 70 Sq.mm, AL × 14017.72 + j3.2821.560.5733.7711.6716.9100A MCCB36.062.2 / 70OK
2SMDB-1AHU-14C X 4 Sq.mm, Cu × 143190.84 + j4.95210.170.0711.671.201.725A MCB16.02.8 / 4 I²tOK
3SMDB-1PUMP-14C X 10 Sq.mm, Cu × 13052.88 + j3.0072.920.1911.673.455.063A MCB16.03.5 / 10 I²tOK
4MAIN LT PANELLIGHTING DB4C X 6 Sq.mm, Cu × 11029.48 + j1.1031.660.2833.777.9511.525A MCB36.04.8 / 6 I²tOK
5MAIN LT PANELHVAC PANEL4C X 150 Sq.mm, AL × 16012.40 + j4.6218.010.8933.7713.9720.8250A MCCB36.062.2 / 150OK
6HVAC PANELCHILLER-14C X 150 Sq.mm, AL × 1255.17 + j1.9323.230.7513.9710.8315.9250A MCCB16.025.7 / 150OK

8. Breaker trip settings

#FeederTypeIn (A)Ir (A)tr @6Ir (s)Isd (A)tsd (s)Ii (A)ti (s)Ik" at bus (kA)
1MAIN LT PANEL → SMDB-1MCCB10010010.008000.1012000.02033.77
2SMDB-1 → AHU-1MCB25253.00OFF0.002500.01011.67
3SMDB-1 → PUMP-1MCB63633.00OFF0.006300.01011.67
4MAIN LT PANEL → LIGHTING DBMCB25253.00OFF0.002500.01033.77
5MAIN LT PANEL → HVAC PANELMCCB25025010.0020000.1030000.02033.77
6HVAC PANEL → CHILLER-1MCCB25025010.0020000.1030000.02013.97

Defaults by type

TypeIr ×Intr sIsd ×Irtsd sIi ×Inti s
MCB1.0300100.01
MCCB1.01080.1120.02
ACB1.01060.300.02

9. Discrimination (selectivity)

BusUpstreamDownstreamIk" (kA)StatusLimit (kA)Remark
SMDB-1100A MCCB
MAIN LT PANEL → SMDB-1
25A MCB
SMDB-1 → AHU-1
11.67PARTIAL1.07limited by upstream instantaneous — raise Ii, switch it OFF (ACB) or use manufacturer selectivity table / zone selectivity
SMDB-1100A MCCB
MAIN LT PANEL → SMDB-1
63A MCB
SMDB-1 → PUMP-1
11.67PARTIAL1.04limited by upstream instantaneous — raise Ii, switch it OFF (ACB) or use manufacturer selectivity table / zone selectivity
HVAC PANEL250A MCCB
MAIN LT PANEL → HVAC PANEL
250A MCCB
HVAC PANEL → CHILLER-1
13.97NONE—upstream can trip first even at low fault currents

10. Time-current curves

SMDB-1: 100A MCCB (upstream) vs 25A MCB (downstream) — PARTIAL · selectivity limit 1.07 kA

100 A1 kA10 kA0.01 s0.1 s1 s10 s1 min16 minIk" 11.67 kAlimit 1.07 kAMAIN LT PANEL → SMDB-1 100A MCCB — upstreamSMDB-1 → AHU-1 25A MCB — downstreamCurrent (log)

limited by upstream instantaneous — raise Ii, switch it OFF (ACB) or use manufacturer selectivity table / zone selectivity

SMDB-1: 100A MCCB (upstream) vs 63A MCB (downstream) — PARTIAL · selectivity limit 1.04 kA

100 A1 kA10 kA0.01 s0.1 s1 s10 s1 min16 minIk" 11.67 kAlimit 1.04 kAMAIN LT PANEL → SMDB-1 100A MCCB — upstreamSMDB-1 → PUMP-1 63A MCB — downstreamCurrent (log)

limited by upstream instantaneous — raise Ii, switch it OFF (ACB) or use manufacturer selectivity table / zone selectivity

HVAC PANEL: 250A MCCB (upstream) vs 250A MCCB (downstream) — NONE

1 kA10 kA0.01 s0.1 s1 s10 s1 min16 minIk" 13.97 kAMAIN LT PANEL → HVAC PANEL 250A MCCB — upstreamHVAC PANEL → CHILLER-1 250A MCCB — downstreamCurrent (log)

upstream can trip first even at low fault currents

11. Voltage-drop basis and method

Design regime: Indian — code edition NBCS 2026 (SP 7:2026) Part D Sec 2 (replaces NBC 2016 Part 8 Sec 2): VD basis — Split — ≤ 6 % transformer → final DB plus ≤ 3 % final DB → last point (9 % at the last point) (NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a): voltage drop ≤ 6 % transformer → final DB and ≤ 3 % DB → last point (cl. 6.2, 5.6 Note a), four-core cables only and Cu up to 25 sq mm (cl. 5.3.7.1), full-size neutral (cl. 8.2.9.1), F&LS supplies (cl. 4.2.1 jj); IS 732:2019 (harmonised with IEC 60364), IS 1554 / IS 7098 cables, CPWD General Specifications cascade limits (stricter than NBCS), with the IEC standards they adopt.

Ib = kW / (√3·V·pf)  (1φ: kW / (Vph·pf))  ·  Iz2 = runs · Ir · kθ · kρ · kd · kgrp · klay — per feeder from IS 3961 Pt 2 / IEC 60364-5-52 Tables B.52.14–15 (temperature, θmax XLPE), B.52.16 (soil), depth (IS 3961 / IEC 60287-2-1), B.52.17–21 (grouping; parallel runs counted as circuits), A.52.3 (installation method). Project defaults: air 40 °C, ground 30 °C, 1.5 K·m/W, 0.9 m, 1 circuit(s) touching, 1 tray(s); catalogue reference 40 °C air / 30 °C ground / 1.5 K·m/W / 0.9 m / single circuit. Feeder-specific conditions are shown in the schedule k column.
Vd = √3 · Ib · L · (R·cosφ + X·sinφ) / (1000 · runs)  ·  Vd% = Vd / 415 × 100  ·  pf = 0.95
Cascade limits (split: 6 % to the final DB + 3 % final circuit; NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a): first hop from source panel ≤ 4.0 %, total ≤ 5.0 %, final circuit ≤ 3.0 % on the segment on top of the DB; bus duct allowance 2.0 % (calculated from R + jX). Panel load = Σ outgoing × diversity factor (default 1.0).
Auto-sizing: smallest cable meeting Iz2 ≥ Ib and the cumulative limit; Cu up to 35 sqmm then Al; max 300 sqmm, parallel runs only when the maximum size cannot pass. Breaker: next standard switchgear rating ≥ Ib, minimum 25 A (25/32/40/63/100/125/160/200/250/315/400/630/800/1000/1250/1600/2000/2500/3200/4000/5000/6300 A); MCB ≤ 63 A, MCCB ≤ 630 A, ACB above.

12. Panel loads (diversified)

PanelConnected kWDFDemand kWIb AIncomer breakerIncoming cable
SMDB-149.01.0049.071.8100A MCCB4C X 70 Sq.mm, AL × 1
HVAC PANEL150.01.00150.0219.7250A MCCB4C X 150 Sq.mm, AL × 1

13. Cable schedule — voltage drop

#FromToPhLoad kWL mLayingCable / bus ductRunsIb ABreakerk (derating)Iz2 AVD %Cum. %Limit %Status
1MAIN LT PANELSMDB-1 (panel)3φ49.0 Σ49.0×1.0040In air – perforated tray / ladder / clipped direct4C X 70 Sq.mm, AL171.8100A MCCB 4P1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
1750.680.684.0PASS
2SMDB-1AHU-13φ12.043In air – perforated tray / ladder / clipped direct4C X 4 Sq.mm, Cu117.625A MCB FP1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
451.722.395.0PASS
3SMDB-1PUMP-13φ37.030In air – perforated tray / ladder / clipped direct4C X 10 Sq.mm, Cu154.263A MCB FP1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
741.482.155.0PASS
4MAIN LT PANELLIGHTING DB3φ2.010In air – perforated tray / ladder / clipped direct4C X 6 Sq.mm, Cu12.925A MCB FP1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
560.040.044.0PASS
5MAIN LT PANELHVAC PANEL (panel)3φ150.0 Σ150.0×1.0060In air – perforated tray / ladder / clipped direct4C X 150 Sq.mm, AL1219.7250A MCCB 4P1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
2841.521.524.0PASS
6HVAC PANELCHILLER-13φ150.025In air – perforated tray / ladder / clipped direct4C X 150 Sq.mm, AL1219.7250A MCCB 4P1.00
θ 1.00 · ρ 1.00 · d 1.00 · grp 1.00 (1) · lay 1.00
2840.632.155.0PASS

14. Voltage-drop cascade

MAIN LT PANELDemand 201.0 kW · DF 1.0 · connected 201.0 kW100A MCCB 4P · 4C X 70 Sq.mm, AL × 1 · 40 m · 0.68%SMDB-1Σ 49.0 kW · DF 1.00.68% / 4.0%25A MCB FP · 4C X 4 Sq.mm, Cu × 1 · 43 m · 1.72%AHU-112.0 kW2.39% / 5.0%63A MCB FP · 4C X 10 Sq.mm, Cu × 1 · 30 m · 1.48%PUMP-137.0 kW2.15% / 5.0%25A MCB FP · 4C X 6 Sq.mm, Cu × 1 · 10 m · 0.04%LIGHTING DB2.0 kW0.04% / 4.0%250A MCCB 4P · 4C X 150 Sq.mm, AL × 1 · 60 m · 1.52%HVAC PANELΣ 150.0 kW · DF 1.01.52% / 4.0%250A MCCB 4P · 4C X 150 Sq.mm, AL × 1 · 25 m · 0.63%CHILLER-1150.0 kW2.15% / 5.0%

Voltage-drop profile along the longest route (cumulative % vs distance from the source)

0 %1 %2 %3 %4 %5 %6 %01020304050607080Limit basis: split: 6 % to the final DB + 3 % final circuit — NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a3 % — NBCS cl. 6.2 final circuit DB → last point4 % — project first hop limit (this project)5 % — project total limit (this project)6 % — NBCS cl. 6.2 transformer → final DBHVAC PANEL 1.52%CHILLER-1 2.15%Longest route: MAIN LT PANEL → HVAC PANEL → CHILLER-1 — 85 m, 2.15 %SMDB-1 0.68%AHU-1 2.39%Worst VD path: MAIN LT PANEL → SMDB-1 → AHU-1 — 83 m, 2.39 %route length from the source, m
NodeFed fromCable × runsL mSegment VD %Cumulative VD %Limit %Check
MAIN LT PANEL source · connected 201.0 kW · demand 201.0 kW (DF 1.00)0.004.0
      └ SMDB-1 (panel)MAIN LT PANEL4C X 70 Sq.mm, AL × 1400.680.684.0PASS
            └ AHU-1SMDB-14C X 4 Sq.mm, Cu × 1431.722.395.0PASS
            └ PUMP-1SMDB-14C X 10 Sq.mm, Cu × 1301.482.155.0PASS
      └ LIGHTING DBMAIN LT PANEL4C X 6 Sq.mm, Cu × 1100.040.044.0PASS
      └ HVAC PANEL (panel)MAIN LT PANEL4C X 150 Sq.mm, AL × 1601.521.524.0PASS
            └ CHILLER-1HVAC PANEL4C X 150 Sq.mm, AL × 1250.632.155.0PASS

15. Design checks — phase balance, harmonics, motors, overload, withstand, worked example

5.1 Phase balance

Single-phase loads are placed on their tagged phase or on the least-loaded phase of their panel; three-phase loads are split equally unless a split is entered. Design current Ib = worst-phase current (IEC 60364-5-52 cl. 523.6.3); neutral current IN = |IR + a·IY + a²·IB| adds to the worst-phase voltage drop. Unbalance = (Imax − Iavg)/Iavg; limit 10 % (design practice / IEEE 141 / CEA).

PanelkW RkW YkW BI R AI Y AI B AI N AUnbalance %Limit %Check
MAIN LT PANEL (source)67.067.067.0294.4294.4294.40.0010PASS
SMDB-116.316.316.371.871.871.80.0010PASS
HVAC PANEL50.050.050.0219.7219.7219.70.0010PASS

5.2 Harmonics — IEC 60364-5-52 Annex E (Table E.52.1)

3rd-harmonic content of the line current ≤ 15 %: no reduction; 15–33 %: factor 0.86 on the line current; 33–45 %: factor 0.86 applied to the neutral current IN = 3·h3·IL; > 45 %: cable sized for the neutral current. Project default h3 = 0 %.

No feeder with 3rd-harmonic content above 0 % — no harmonic derating applied.

5.3 Motor starting

Istart = m · Ib (DOL 6 ×, star-delta 2.5 ×, soft starter 3 ×, VFD 1.5 ×) at pf 0.3; dip at the motor terminals = upstream running VD + starting VD of the motor feeder ≤ 15 % (IEEE 141 / IS 732 guidance; upstream feeders assumed at running load).

FromToStarterIb AMultipleI start Apf startCableStart VD %Upstream VD %Dip at terminals %Limit %Check
SMDB-1PUMP-1DOL54.26.0 ×3250.304C X 10 Sq.mm, Cu × 13.150.683.8315PASS
HVAC PANELCHILLER-1Star-delta219.72.5 ×5490.304C X 150 Sq.mm, AL × 10.881.522.3915PASS

5.4 Overload protection — IS 732:2019 cl. 433.1 / IEC 60364-4-43 cl. 433.1

Ib ≤ In ≤ Iz and I2 ≤ 1.45·Iz, where I2 = 1.45·In for MCB (IS/IEC 60898-1), 1.30·In for MCCB / ACB (IEC 60947-2) and 1.60·In for gG fuses (IS 13703 / IEC 60269). With the rule on, the cable is sized so that Iz2 ≥ In (the second condition is then automatically satisfied for breakers).

FromToIb AIn A · typeIz2 AI2 A1.45·Iz AIb ≤ In ≤ IzI2 ≤ 1.45 Iz
MAIN LT PANELSMDB-171.8100 MCCB175.01.30 × In = 130.0253.8PASSPASS
SMDB-1AHU-117.625 MCB45.01.45 × In = 36.265.2PASSPASS
SMDB-1PUMP-154.263 MCB74.01.45 × In = 91.3107.3PASSPASS
MAIN LT PANELLIGHTING DB2.925 MCB56.01.45 × In = 36.281.2PASSPASS
MAIN LT PANELHVAC PANEL219.7250 MCCB284.01.30 × In = 325.0411.8PASSPASS
HVAC PANELCHILLER-1219.7250 MCCB284.01.30 × In = 325.0411.8PASSPASS

5.5 Short-circuit withstand of cables — IS 732 / IEC 60364-4-43 cl. 434.5.2

S ≥ Ik·√t / k with k = 143 (Cu XLPE), 115 (Cu PVC), 94 (Al XLPE), 76 (Al PVC) — Table 43A; Ik = three-phase fault level at the upstream bus, cascaded from the source (36 kA at each source panel unless set per panel) through cable impedances Ik = Uph/|Z| (screening, c = 1; see the Short-circuit tool for the IEC 60909 study); t = clearing time of the feeder's own breaker (MCB 0.01 s, MCCB 0.03 s, ACB 0.4 s). Parallel runs share the fault current (S = size × runs).

Fault levels at 7 bus(es) are taken from the linked Short-circuit study (IEC 60909 Ik″): AHU-1, CHILLER-1, HVAC PANEL, LIGHTING DB, MAIN LT PANEL, PUMP-1, SMDB-1. Other buses are cascaded from these.

From (bus)ToIk at bus kAIk at To kABreakert s / let-through I²tkS min sqmmCable × runsS sqmmCheckIk source
MAIN LT PANELSMDB-135.979.66100 MCCB0.030 s9466.34C X 70 Sq.mm, AL × 170PASSSC study
SMDB-1AHU-112.770.9725 MCBI²t 178,780 A²s1433.04C X 4 Sq.mm, Cu × 14PASSSC study
SMDB-1PUMP-112.773.3663 MCBI²t 280,940 A²s1433.74C X 10 Sq.mm, Cu × 110PASSSC study
MAIN LT PANELLIGHTING DB35.976.2125 MCBI²t 503,580 A²s1435.04C X 6 Sq.mm, Cu × 16PASSSC study
MAIN LT PANELHVAC PANEL35.9712.29250 MCCB0.030 s9466.34C X 150 Sq.mm, AL × 1150PASSSC study
HVAC PANELCHILLER-115.9013.14250 MCCB0.030 s9429.34C X 150 Sq.mm, AL × 1150PASSSC study

MCB-protected feeders (In ≤ 63 A): k²S² ≥ let-through I²t of an energy-limiting class 3 MCB at the prospective current (IEC 60898-1 Annex ZC, type C values; IEC 60364-4-43 cl. 434.5.2). Other feeders: adiabatic S ≥ Ik·√t / k with the device clearing time.

5.6 NBCS 2026 Part D Sec 2 — cables, neutral, final circuits and F&LS feeders

Four-core cables (cl. 5.3.7.1): only four-core cables are used for internal installations (four-core in place of 3½-core below 50 sq mm) and all sizes up to 25 sq mm are copper — auto-sizing picks 4C Cu up to 35 sq mm, then 4C Al. No 3½-core cable in this schedule.
Neutral (cl. 8.2.9.1 Note): neutral of the same size as the phase conductor (half-size neutral no longer acceptable with non-linear loads); the neutral-current term in the voltage drop uses zN = z for 4C cables.
Voltage drop (cl. 6.2, 5.6 Note a): ≤ 6 % from the transformer to the final distribution board and ≤ 3 % from the distribution board to the last point — read either as split (6 % + 3 %) or as total (6 % to the last point incl. ≤ 3 % final circuit); the project chooses (Settings ▸ VD basis).
Voltage-drop basis: Split — ≤ 6 % transformer → final DB plus ≤ 3 % final DB → last point (9 % at the last point) — NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a. This project: first hop ≤ 4.0 %, total ≤ 5.0 %, final circuits ≤ 3.0 % on the segment; final-circuit rows add their segment limit on top of the DB's own cumulative drop. (stricter than NBCS — CPWD practice)

No row is marked as a final circuit (Load details ▸ Final circuit) — the 3 % DB → last-point check applies to final-circuit rows.

Fire & life-safety supplies (cl. 4.2.1 jj): fire pumps, pressurisation / smoke venting, fireman's and all lifts, exit and emergency lighting, fire alarm, PA, door hold-open devices and fire-control-room lighting are fed from the normal and the standby-generator supply with changeover; the generator takes the starting current of all F&LS loads; the F&LS panel / DB is in a fire-safe zone; cables are fire-survival (circuit integrity) as far as possible. F&LS rows are auto-sized in the fire-survival (FS) cable family.

No feeder is marked F&LS (Load details ▸ F&LS feeder).

5.7 Worked examples (largest feeder and critical route)

Worked from this schedule’s own inputs and results — the values can be traced to the cable schedule (section 3) and the cascade (section 4).

Feeder MAIN LT PANEL → HVAC PANEL — design current and ampacity with derating
largest feeder of the schedule
Given: P 150.00 kW, 3φ · U 415 V · cosφ 0.95 · cable 4C X 150 Sq.mm, AL × 1 · Ir 284.0 A (catalogue, reference conditions)
1. Design current: Ib = P / (√3·U·cosφ) = 150.00 × 1000 / (1.732 × 415 × 0.95) = 219.7 A
2. Derating factor: k = kθ·kρ·kd·kgrp·klay = 1.000 × 1.00 × 1.00 × 1.00 × 1.00 = 1.000 (In air – perforated tray / ladder / clipped direct; grouping n = 1)
3. Derated capacity: Iz2 = n·Ir·k = 1 × 284.0 × 1.000 = 284.0 A
4. Ampacity: Iz2 ≥ Ib → 284.0 ≥ 219.7 A PASS
5. Overload rule (IS 732 / IEC 60364-4-43 cl. 433.1): Ib ≤ In ≤ Iz → 219.7 ≤ 250 (MCCB) ≤ 284.0 A PASS
6. Conventional tripping current: I2 = f·In ≤ 1.45·Iz → 1.3 × 250 = 325.0 ≤ 411.8 A PASS
Feeder MAIN LT PANEL → HVAC PANEL — voltage drop (impedance method, cable mV/A/m)
R and X are the catalogue values of the selected cable at the operating temperature
Given: R 0.265 Ω/km · X 0.077 Ω/km · L 60 m · Ib 219.7 A · runs n 1
1. Impedance per conductor: z = R·cosφ + X·sinφ = 0.265 × 0.95 + 0.077 × 0.312 = 0.2758 mV/A/m (Ω/km ≡ mV/A/m)
2. Cable mV/A/m, three-phase: (mV/A/m)3φ = √3·z = 1.732 × 0.2758 = 0.4777 mV/A/m
3. Voltage drop: ΔU = (mV/A/m)·Ib·L / (1000·n) = 0.4777 × 219.7 × 60 / (1000 × 1) = 6.3 V
4. Percent of line voltage: ΔU% = ΔU / U × 100 = 6.30 / 415 × 100 = 1.517 %
5. Segment limit: ΔU% ≤ segment limit → 1.52 ≤ 4.0 % PASS
Cumulative voltage drop MAIN LT PANEL → AHU-1 (critical route)
the route that uses the largest share of its limit; each segment drop is computed as in the example above
Given: hops 2 · route length 83 m · limit 5.0 % at AHU-1
1. MAIN LT PANEL → SMDB-1: ΔU%seg = 4C X 70 Sq.mm, AL × 1, 40 m, 71.8 A = 0.677 %
2. SMDB-1 → AHU-1: ΔU%seg = 4C X 4 Sq.mm, Cu × 1, 43 m, 17.6 A = 1.716 %
3. Cumulative: ΣΔU% = ΔU%1 + ΔU%2 = 0.677 + 1.716 = 2.393 %
4. Cumulative limit: ΣΔU% ≤ limit → 2.39 ≤ 5.0 % PASS (CPWD cascade limit, stricter than NBCS 2026 Part D Sec 2 cl. 6.2 — VD basis split (split: 6 % to the final DB + 3 % final circuit))
Feeder MAIN LT PANEL → HVAC PANEL — short-circuit withstand and other checks
IEC 60364-4-43 cl. 434.5.2 adiabatic check (IS 732)
Given: Ik at MAIN LT PANEL 35.97 kA · k 94 (Al XLPE)
1. Minimum cross-section: Smin = Ik·√t / k = 35970 × √0.03 / 94 = 66.3 sq mm (t = 0.03 s (MCCB))
2. Withstand: S ≥ Smin → 150 ≥ 66.3 sq mm PASS (Ik at HVAC PANEL = 12.29 kA)

16. LV cable schedule — governing constraint per feeder

FromToLoad kWIb ABreakerIcu kACable × runsIz AVD %Cum VD %Ik″ at bus kAS min / SGovernsChecks
MAIN LT PANELSMDB-149.071.76100 MCCB364C X 70 Sq.mm, AL × 1175.00.6770.67735.9766.3 / 70.0short circuitPASS
SMDB-1AHU-112.017.5725 MCB164C X 4 Sq.mm, Cu × 145.01.7162.39312.773.0 / 4.0minimum sizePASS
SMDB-1PUMP-137.054.1863 MCB164C X 10 Sq.mm, Cu × 174.01.4782.15512.773.7 / 10.0ampacityPASS
MAIN LT PANELLIGHTING DB2.02.9325 MCB364C X 6 Sq.mm, Cu × 156.00.0440.04435.975.0 / 6.0short circuitPASS
MAIN LT PANELHVAC PANEL150.0219.66250 MCCB364C X 150 Sq.mm, AL × 1284.01.5171.51735.9766.3 / 150.0ampacityPASS
HVAC PANELCHILLER-1150.0219.66250 MCCB164C X 150 Sq.mm, AL × 1284.00.6322.14915.929.3 / 150.0ampacityPASS

Governing constraint = the check that fails on the next smaller cable of the same family. Short-circuit rule: MCB feeders by the let-through I²t of a class-3 MCB (IEC 60898-1), other devices adiabatic Ik″·√t / k; mode: autofix. Conductor policy: Cu up to 35 sq mm, Cu for fire / life-safety feeders; four-core cables only and Cu up to 25 sq mm (NBCS 2026 Part D Sec 2 cl. 5.3.7.1), full-size neutral (cl. 8.2.9.1); F&LS feeders on fire-survival cable from normal + standby DG supply with changeover (cl. 4.2.1 jj).

17. Cable quantities

CableLength mRunsFeedersTerminations
4C X 150 Sq.mm, AL85224
4C X 4 Sq.mm, Cu43112
4C X 70 Sq.mm, AL40112
4C X 10 Sq.mm, Cu30112
4C X 6 Sq.mm, Cu10112

18. Worked examples — from this project

Worked from this project’s own inputs and results — each value can be traced to the schedules above.

Fault level at MAIN LT PANEL — scenario ‘grid’
The main LV bus with the highest fault level; every downstream level is cascaded from it.
Given: Un 415 V · cmax 1.05 (IEC 60909-0 Table 1, LV)
1. TR-1 transformer: ZT = uk/100 · U²/SrT = 6.25/100 · 415² / 1 600 000 = 6.728 mΩ (X/R 7: RT = Z/√(1+(X/R)²), XT = R·X/R)
2. Upstream network referred to LV: ZQ = c·U²/S″kQ = 1.05 · 415² / (250 MVA) = 0.723 mΩ (X/R 10, in series with the transformer)
3. TR-1 branch: Z = ZQ + ZT = 1.023 + j7.38 mΩ (|Z| = 7.45 mΩ)
4. Initial symmetrical short-circuit current: Ik″ = c·Un / (√3·|Zk|) = 1.05 · 415 / (1.732 · 0.00745 Ω) = 33.77 kA (study value 33.77 kA)
5. Peak current: κ = 1.02 + 0.98·e−3R/X; ip = κ·√2·Ik″ = X/R = 7.21 → κ = 1.666; 1.666 · 1.414 · 33.77 = 79.58 kA (study 79.58 kA)
6. Breaker breaking capacity at this bus: Icu ≥ Ik″ → next standard step → 33.77 kA → 36 kA PASS
Breaker breaking capacity at MAIN LT PANEL over every supply scenario
Each scenario (grid, DG, with inverters) is solved separately; the worst value governs the switchgear.
Given: grid 35.14 kA · dg 17.89 kA · grid+inv 35.97 kA · dg+inv 18.72 kA
1. Governing fault level: Ik,max = max over scenarios = 35.14 , 17.89 , 35.97 , 18.72 = 35.97 kA
2. Breaker rating: Icu = next standard step ≥ Ik,max → 35.97 kA → 36 kA PASS
Feeder MAIN LT PANEL → SMDB-1 — fault current and cable withstand
The feeder with the smallest short-circuit withstand margin (S_min / S installed) in the study.
Given: Cable 4C X 70 Sq.mm, AL × 1, L = 40 m · Protective device 100 A MCCB
1. Fault level at MAIN LT PANEL (cable start): Ik,from = from the bus table (|Z| = 7.45 mΩ) = 33.77 kA
2. Cable impedance: Zc = (R·f20°C + jX)·L / (1000·n) = (0.568·0.78 + j0.082) · 40 / (1000 · 1) = 17.722 + j3.28 mΩ (R at 20 °C for the maximum fault current (IEC 60909-0 §5.3))
3. Fault level at SMDB-1 (cable end): Ik,to = c·Un / (√3·|Zbus + Zc|) = 1.05 · 415 / (1.732 · 21.564 mΩ) = 11.67 kA (X/R 0.57, ip 16.91 kA)
4. Minimum section (adiabatic): Smin = Ik·√t / k = 33 770 · √0.03 / 94 = 62.2 mm² (k = 94 for Al XLPE (IEC 60364-4-43 Table 43A); t = clearing time of the MCCB)
5. Cable withstand: S × n ≥ Smin → 70 ≥ 62.2 mm² PASS
6. Breaker at MAIN LT PANEL: Icu ≥ Ik,from → 36 ≥ 33.77 kA PASS
Discrimination 250A MCCB (MAIN LT PANEL → HVAC PANEL) over 250A MCCB (HVAC PANEL → CHILLER-1)
The least selective pair in the study.
Given: Upstream MCCB 250 A: Ir 250 A, tr 10 s, Isd 2000 A / 0.1 s, Ii 3000 A · Downstream MCCB 250 A, Ii 3000 A
1. Rule: tmax,downstream(I) < tmin,upstream(I) for every I ≤ Ik″ at the bus = tolerance bands ±10 % current, ±20 % time
2. Prospective fault at HVAC PANEL: Ik″ = 13.97 kA
3. Selectivity limit: Is ≥ Ik″ for total selectivity → selective up to — kA vs 13.97 kA → none CHECK (upstream can trip first even at low fault currents)
LV feeder MAIN LT PANEL → SMDB-1 — governed by short circuit
A feeder whose size is set by a constraint other than plain ampacity, where there is one.
Given: Load 49 kW, 3φ, L = 40 m, pf 0.95
1. Design current: Ib = P / (√3·U·cosφ) = 49 000 / (1.732 · 415 · 0.95) = 71.76 A (worst phase if unbalanced)
2. Protective device: In = next standard rating ≥ Ib = 100 A MCCB
3. Derated capacity: Iz2 = n·Ir·k = 1 · 175 · 1 = 175 A (4C X 70 Sq.mm, AL)
4. Overload: Ib ≤ In ≤ Iz2 → 71.76 ≤ 100 ≤ 175 A PASS
5. Voltage drop: ΔU% = √3·Ib·L·(R·cosφ + X·sinφ)/(1000·n·U)·100 = 1.732 · 71.76 · 40 · 0.5652 / (1000 · 1 · 415) · 100 = 0.68 % (cumulative 0.68 % ≤ 4 %)
6. Short-circuit withstand: S × n ≥ Smin → Ik 35.97 kA at MAIN LT PANEL → Smin 66.3 mm²; installed 70 mm² PASS
Governing constraint: the next smaller cable of the same family fails on short circuit, so 4C X 70 Sq.mm, AL × 1 is the smallest that passes every check.
HT cable 11 kV incomer → HT panel
The HT feeder carrying the largest kVA.
Given: Load 3200 kVA at 11 kV, L = 60 m, laid in ground
1. Design current: Ib = S / (√3·U) = 3200 / (1.732 · 11) = 168 A
2. Derating: k = k1·k2·k3·k4 = soil 30 °C k1 1.0 · ρ 1.2 k2 1.0 · group 1 k3 1.0 · depth 0.9 m k4 1.0 = 1
3. Current-carrying capacity: Iz = n·Ir·k ≥ Ib → 3C X 150 Sq.mm, Al 11kV XLPE × 1: Iz = 260 A ≥ 168 A PASS
4. Short-circuit withstand: Smin = Ik·√t / k = 13 120 · √1 / 94 = 139.6 mm² (k = 94 (Al XLPE), t = HV protection clearing time)
5. Conductor: S × n ≥ Smin → 150 × 1 ≥ 139.6 mm² PASS
6. Screen (earth fault): Sscreen ≥ Ief·√tef / ks → 25 ≥ 7 mm² (Ief 1 kA) PASS
7. Voltage drop: ΔU% = √3·Ib·L·(R·cosφ + X·sinφ)/(1000·n·U) → cosφ 0.9 → 0.044 % ≤ 2 % PASS

19. Voltage-drop settings

SettingValue
voltage415
pf0.95
k1_temp0.95
k2_group0.86
k3_tray0.92
max_size300
max_runs8
cu_upto_size35
default_cores_small4
default_cores_large4
limit_first_hop4.0
limit_total5.0
bbt_vd2.0
seg_limit_alignTrue
min_breaker25
termination_per_run2
size_for_breakerFalse
parent_share0.6
default_materialauto
default_df1.0
mcb_max63
mccb_max630
derating_modetables
overload_ruleTrue
unbalance_limit10
thd30
motor_start_pf0.3
motor_start_limit15
sc_checkTrue
sc_source_ka36
regimeindian
limit_final3.0
code_editionnbcs2026
vd_basissplit
cu_lifesafetyTrue
derating.insulationXLPE
derating.air_temp40
derating.ground_temp30
derating.soil_rho1.5
derating.depth0.9
derating.n_circuits1
derating.spacingtouching
derating.trays1

20. Short-circuit settings

SettingValue
voltage415.0
c_max1.05
c_min0.95
r_temp_factor0.78
bd_temp_factor1.0
k_cu_pvc115
k_cu_xlpe143
k_al_pvc76
k_al_xlpe94
t_mcb0.01
t_mccb0.03
t_acb0.4
util_xr10
dg_xd_pct16
dg_xr6.7
mcb_ruleclass3
ka_steps6, 10, 16, 25, 36, 50, 65, 80, 100, 120, 150

21. Formulae applied (with code clauses)

Voltage drop

QuantityFormulaReference / clauseNotes
Design current (3φ)Ib = P / (√3 · U · cosφ)IEC 60364-5-52:2009 cl. 523 / IS 732:2019 Sec. 5.2P in kW × 1000, U = 415 V line voltage; 1φ: Ib = P / (U_ph · cosφ)
Current-carrying capacity (derated)Iz2 = n · Ir · k_θ · k_ρ · k_d · k_grp · k_lay (manual mode: n · Ir · k1 · k2 · k3 · k_lay)IEC 60364-5-52:2009 cl. 523.1; Table A.52.3 (reference methods B, C, E, F, D1, D2); B.52.14 (air temperature), B.52.15 (ground temperature), B.52.16 (soil thermal resistivity), B.52.17 / B.52.20 / B.52.21 (grouping in air), B.52.18 (direct buried), B.52.19 (in ducts); IS 3961 Pt 2 (rating factors, depth); IEC 60287-2-1 (k_θ = √((θmax−θamb)/(θmax−θref)), depth); IS 1554 Pt 1 / IS 7098 Pt 1 base ratingsBase ratings at 40 °C air / 30 °C ground / 1.5 K·m/W / 0.9 m / single circuit; parallel runs counted as circuits in k_grp; grouping rows for n above the table use the next larger row (conservative); Ib ≤ In ≤ Iz (IEC 60364-4-43 cl. 433.1)
Voltage drop (3φ, impedance method)ΔU = √3 · Ib · L · (R·cosφ + X·sinφ) / (1000 · n)IEC 60364-5-52:2009 Annex G (G.1); IS 732:2019 Annex on voltage drop; conductor R, X per IS 1554 / IS 7098 / IS 8130R, X in Ω/km at operating temperature; 1φ: ΔU = 2 · Ib · L · (R·cosφ + X·sinφ)/1000
Voltage drop, percentΔU% = ΔU / Un × 100NBCS 2026 (SP 7:2026) Part D Sec 2 cl. 6.2 / 5.6 Note a — Split — ≤ 6 % transformer → final DB plus ≤ 3 % final DB → last point (9 % at the last point); IEC 60364-5-52:2009 Annex G Table G.52.1 (≤ 3 % lighting, ≤ 5 % other, from origin); CPWD General Specifications Pt I (2013) cl. on voltage dropCascade: first hop from source panel ≤ limit_first_hop, cumulative to last point ≤ limit_total
Bus-duct voltage dropΔU = √3 · Ib · L · (R·cosφ + X·sinφ) / 1000IEC 61439-6:2012 (busbar trunking systems) Annex — voltage drop from manufacturer R, X per metreChecked against the bus-duct VD allowance (default 2 %)
Panel demand (diversity)DL(N) = Σ connected × DF ; DL(F) = Σ fire/essential loads × 1.0NBCS 2026 Part D Sec 2 cl. 4.2.2.2 (diversity) and 4.2.1 (jj) (fire & life-safety supplies); CPWD GS Pt IDF per panel, default 1.0; cable sized for the diversified demand
Breaker ratingIn = next standard switchgear rating ≥ max(Ib, I_min) ; standard steps 25, 32, 40, 63, 100, 125, 160, 200, 250, 315, 400, 630, 800, 1000, 1250, 1600, 2000, 2500, 3200, 4000, 5000, 6300 A ; I_min = 25 A default (user-settable) ; MCB ≤ 63 A, MCCB ≤ 630 A, ACB above (configurable)IEC 60364-4-43:2008 cl. 433.1 (Ib ≤ In ≤ Iz, I2 ≤ 1.45 Iz); IEC 60898-1 (MCB); IEC 60947-2 (MCCB/ACB)
Design current with unbalanceI_b = max(I_R, I_Y, I_B) ; I_N = |I_R + a·I_Y + a²·I_B| ; unbalance = (I_max − I_avg)/I_avgIEC 60364-5-52:2009 cl. 523.6.3 (neutral carrying current); IEEE 141 / CEA practice ≤ 10 %1φ loads on tagged or least-loaded phase; worst-phase VD = L·(I_max·z + I_N·z_N)/(1000·n)/U_ph, z_N = 2z for reduced neutral (3.5-core)
Harmonic reduction factorh3 ≤ 15 %: 1.0 on I_L ; 15–33 %: 0.86 on I_L ; 33–45 %: 0.86 on I_N = 3·h3·I_L ; > 45 %: 1.0 on I_NIEC 60364-5-52:2009 Annex E, Table E.52.1Applied to 4-core / 3.5-core three-phase circuits with neutral
Motor starting voltage dipI_start = m·I_b (DOL 6, Y-Δ 2.5, soft 3, VFD 1.5) ; ΔU_start % = upstream running VD + segment VD at I_start, pf_start 0.3 ≤ 15 %IEEE 141-1993 cl. 3.11 (starting voltage ≥ 80–85 %); IS 732:2019 cl. 525 note; IEC 60364-5-52 Annex GUpstream circuits taken at running load (screening)
Overload protection ruleI_b ≤ I_n ≤ I_z ; I_2 ≤ 1.45·I_z (I_2 = 1.45 I_n MCB, 1.30 I_n MCCB/ACB, 1.60 I_n gG fuse)IS 732:2019 cl. 433.1 = IEC 60364-4-43:2008 cl. 433.1; IS/IEC 60898-1 cl. 8.6.2; IEC 60947-2 cl. 7.2.1.2.4; IS 13703 / IEC 60269-1Rule on → cable sized for I_n
Cable short-circuit withstand (in VD)S_min = I_k·√t / k ; I_k(bus) = U_ph / |Z_source + Σ(R + jX)·L/(1000·n)|IS 732:2019 / IEC 60364-4-43:2008 cl. 434.5.2, Table 43A (k); IEC 60909-0 (c = 1 screening)t = clearing time of the feeder breaker (MCB 0.01 s, MCCB 0.03 s, ACB 0.4 s); parallel runs share the fault current

Short circuit

QuantityFormulaReference / clauseNotes
Transformer impedance (referred to LV)Z_T = (u_kr / 100) · U_n² / S_rT ; R_T, X_T from X/RIEC 60909-0:2016 cl. 6.3.2 eq. (7)-(9); u_kr per IS 1180 Pt 1:2014 Table / IS 2026 Pt 1Typical u_kr: 4.5 % ≤ 630 kVA, 5 % ≤ 1250 kVA, 6.25 % ≤ 2500 kVA (editable)
Network feeder (utility) impedanceZ_Q = c · U_nQ² / S"_kQ (referred to LV by 1/t_r²)IEC 60909-0:2016 cl. 6.2.1 eq. (4)-(5); X_Q/R_Q ≈ 10 (cl. 6.2.1 note)Blank MVA = infinite bus
Generator (DG) impedanceZ_G = (x"_d / 100) · U_rG² / S_rGIEC 60909-0:2016 cl. 6.6.1 eq. (18); x"_d from generator data (default 16 %)DG-only case uses c_min for the minimum fault level (cl. 5.3.1)
Cable impedanceZ_L = (R_20 + jX) · L / (1000 · n) ; R_20 = R_θ / (1 + α(θ − 20))IEC 60909-0:2016 cl. 6.7 (line impedances at 20 °C for maximum current); α per IS 8130:2013Catalogue R at 90 °C × 0.78 ≈ R at 20 °C
Initial symmetrical short-circuit currentI"_k = c · U_n / (√3 · |Z_k|)IEC 60909-0:2016 cl. 7.1.1 eq. (29); voltage factor c Table 1 (c_max 1.05 / 1.10, c_min 0.95 for LV)
Peak short-circuit currenti_p = κ · √2 · I"_k ; κ = 1.02 + 0.98 · e^(−3R/X)IEC 60909-0:2016 cl. 8.1.1 eq. (55)-(56)Used for busbar dynamic withstand (IEC 61439-1 cl. 10.11.5)
Breaker breaking capacityI_cu ≥ I"_k at the bus where the breaker is installed → next standard kA stepIEC 60947-2:2016 cl. 4.3.5.2 (I_cu), 4.3.5.3 (I_cs), 4.3.5.4 (I_cw); IS/IEC 61439-1 cl. 10.11 (I_cw of assembly)Steps 6/10/16/25/36/50/65/80/100 kA (editable)
Cable short-circuit withstand (adiabatic)I² · t ≤ k² · S² → S_min = I"_k · √t / kIEC 60364-4-43:2008 cl. 434.5.2, Table 43A (k: Cu PVC 115, Cu XLPE 143, Al PVC 76, Al XLPE 94)t = clearing time of the upstream breaker (MCB 0.01 s, MCCB 0.03 s, ACB with STD 0.4 s, editable)
Long-time (thermal) tript = t_r · 35 / ((I/I_r)² − 1) (I²t inverse, asymptotic at I_r)IEC 60947-2:2016 Annex F / cl. 7.2.1.2.4 (L-release, ±10 % current tolerance); IEC 60898-1:2015 Table 6 (1.13 I_n no trip 1 h, 1.45 I_n trip < 1 h)t_r = trip time at 6 × I_r
Short-time tript = t_sd for I ≥ I_sd (definite time)IEC 60947-2:2016 cl. 7.2.1.2.4 (S-release), tolerance ±10 % current / ±20 % time
Instantaneous tript = t_i for I ≥ I_i ; MCB C-curve 5–10 × I_nIEC 60898-1:2015 Table 7 (B 3–5, C 5–10, D 10–20 × I_n); IEC 60947-2 cl. 7.2.1.2.4 (I-release)
Discrimination (selectivity) criteriont_max,downstream(I) < t_min,upstream(I) for all I ≤ I"_k at the downstream bus ; limit = highest I satisfying itIEC 60947-2:2016 Annex A (selectivity, A.4 total / partial); IEC 60364-5-53:2019 cl. 535 (coordination); IS 10118 Pt 3Energy-based selectivity in the instantaneous zone requires manufacturer tables (IEC 60947-2 Annex A.5)
Device numbers50/51 OC, 50N/51N EF, 64 REF, 86 lockout, 95 trip-circuit supervision, 25 sync-check, 27/59 U/V–O/V, 32 reverse powerIEEE C37.2-2008 Table 1

22. Standards applied

Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in) and must be reviewed by a qualified engineer before issue. Ground levels marked "assumed" have no survey level within reach — verify.