Power factor correction — design calculation

APFC panel — Sample project — Tower A · project: Sample project — Tower A
Generated 28 Nov 2026 16:09
NBCS 2026 (SP 7:2026) Part D Sec 2 · IS 13340 / IEC 60831 · IEC 61921 · IEEE 519-2022

1. Inputs

InputValue
Compensation schemeCapacitor bank (APFC) only
Load P400.0 kW
Existing pf (cos φ₁)0.78
Target pf (cos φ₂)0.99
Transformer rating630 kVA
System voltage415 V, 3φ, 50 Hz
Harmonic distortion THD-I (network)8 %
Detuned reactorauto by THD
Step pattern1:1:2:2
Transformer no-load compensationyes (5 % of kVA)

2. Calculation

QuantityResultBasis
tan φ₁ − tan φ₂0.660Q = P·(tan φ₁ − tan φ₂)
Reactive power required Q263.9 kVAR
Transformer no-load compensation31.5 kVAR5 % × S_rT
Total295.4 kVAR
Selected bank (standard)300 kVAR7 steps: 25, 25, 50, 50, 50, 50, 50
Detuned reactor7 % (f_res = 189 Hz)by THD-I
Capacitor rated voltage / kVAR480 V / 432 kVARQ_c = Q/(1−p)·(U_r/U_n)²
Bank current I_n417.4 AQ/(√3·U)
APFC incomer breaker630 A 4P ACB≥ 1.5 × I_n
Feeder cable2R x 4C x 150 sqmm Cu / 2R x 4C x 240 sqmm Al≥ 1.43 × I_n
kVA before / after512.8 / 404.0 kVAreleased 108.8 kVA
Line current before / after713.4 / 562.1 AI²R loss reduction ≈ 37.9 %
Transformer loading before / after81.4 % / 64.1 %

3. APFC steps and switching

StepkVARI (A)MCB / MCCBContactorCable (Cu sqmm)
12534.863 Acapacitor-duty ≥ 63A10
22534.863 Acapacitor-duty ≥ 63A10
35069.6125 Acapacitor-duty ≥ 125A25
45069.6125 Acapacitor-duty ≥ 125A25
55069.6125 Acapacitor-duty ≥ 125A25
65069.6125 Acapacitor-duty ≥ 125A25
75069.6125 Acapacitor-duty ≥ 125A25

4. Graphs

Power triangle — before (cos φ₁ 0.78) and after (cos φ₂ 0.99)P = 400 kWQc = 263.9 kVAr (capacitors)Q₁ = 320.9 kVArQ₂ = 57.0 kVArS₁ = 512.8 kVA (φ₁ 38.7°)S₂ = 404.0 kVA (φ₂ 8.1°)Released 108.8 kVA; line current 713.4 → 562.1 A. NBCS 2026 Part D Sec 2 cl. 3.8.1 floor: cos φ ≥ 0.95 lag.
APFC step ladder — 7 steps, bank 300 kVAr0100200300400500step (switching order)kVArS1: 2525S2: 2525S3: 5050S4: 5050S5: 5050S6: 5050S7: 5050S1S2S3S4S5S6S7required 295.4 kVArstep kVArcumulative kVAr

Triangle drawn to scale from P, cos φ₁ and cos φ₂; the ladder shows each capacitor step and the bank built up in the APFC relay's switching order.

5. Code basis — NBCS 2026 (SP 7:2026) Part D Sec 2

Clause (NBCS 2026 Part D Sec 2)RequirementThis designResult
3.8.1 power factor improvementsupply pf ≥ 0.95 lag (lower limit of the supply conditions)target cos φ₂ = 0.99 (existing 0.78)PASS
5.3.6.6 harmonicsnon-linear loads: plan detuned banks / active filters; filter + capacitor panel in a controlled environment7 % detuned reactor, fr 189 Hznote
8.2.9.1 note — neutralfull-size neutral where harmonics are presentfeeder cables 4-core (NBCS 5.3.7.1); an AHF on 3P4W compensates the neutral (triplen) — size its neutral as the phasenote

6. Worked example — from this project

Worked from this calculation’s own inputs — each value matches the tables above.

400 kW load, cos φ 0.78 → 0.99
the inputs of this calculation
Given: System 415 V 3φ 50 Hz · THD-I 8 % · Transformer 630 kVA
1. tan φ₁ − tan φ₂: tan(arccos cos φ1) − tan(arccos cos φ2) = 0.802 − 0.142 = 0.66
2. Reactive power required: Q = P · (tan φ1 − tan φ2) = 400 · (0.802 − 0.142) = 263.9 kVAr
3. Transformer no-load compensation: Q0 = 5 % · SrT = 0.05 · 630 = 31.5 kVAr
4. Total: Qtot = Q + Q0 = 263.9 + 31.5 = 295.4 kVAr
5. Standard bank: next size ≥ Qtot = from 25, 50, 75, 100, 125, 150, 200, 250, 300, 350, 400, 450 … kVAr = 300 kVAr
6. Step size: next standard step ≥ max(bank / 12, 5) = 300 / 12 = 25.0 → from 5, 10, 12.5, 15, 20, 25, 30, 40, 50, 75, 100 = 25 kVAr
7. Steps: 1 : 1 : 2 : 2 : 2 … until the bank is filled = 25 + 25 + 50 + 50 + 50 + 50 + 50 = 300 kVAr (7 steps; relay C/K on the smallest 25 kVAr)
8. Detuned reactor: THD-I ≤ 5 % → none; ≤ 15 % → 7 %; else 14 % = THD-I 8 % (auto) = 7 %
9. Tuning frequency: fr = 50 / √p = 50 / √0.07 = 189 Hz (order 3.78 — below the 5th harmonic)
10. Capacitor rating: Qc = Q / (1 − p) · (Ur / Un)² = 300 / (1 − 0.07) · (480 / 415)² = 431.5 kVAr (capacitors rated 480 V)
11. Bank current: In = Q / (√3 · U) = 300,000 / (1.732 · 415) = 417.4 A
12. Incomer: Ibreaker ≥ 1.5 · In → 630 A ≥ 626.1 A PASS (cable for Iz ≥ 1.43 · In = 596.9 A → 2R x 4C x 150 sqmm Cu)
13. kVA before / after: S = P / cos φ = 400 / 0.78 → 400 / 0.99 = 512.8 → 404.0 kVA (released 108.8 kVA; current 713.4 → 562.1 A)
14. Transformer loading after: Safter / SrT ≤ 100 % → 404.0 / 630 = 64.1 % PASS

Design notes

Formulae applied (with code clauses)

QuantityFormulaReference / clauseNotes
Reactive power requiredQ = P · (tanφ₁ − tanφ₂)IEC 61921:2017 cl. 4 (bank sizing); IS 13340:1993 (IEC 60831-1) scopeP = active load kW; φ from existing / target pf
Transformer no-load compensationQ_fixed ≈ 5 % × S_rTIEC 61921:2017 Annex (fixed compensation of transformers); IS 2026 no-load currentOptional fixed step
Capacitor rating with detuned reactorQ_c,rated = Q_eff / (1 − p) · (U_r / U_n)² ; f_res = 50 / √pIEC 61921:2017 cl. 6 (detuned banks; p = 7 % → 189 Hz, 14 % → 134 Hz); IEC 60831-1:2014 cl. 5 (rated voltage 480 / 525 V)Reactor by THD-I: ≤ 5 % plain, 5–15 % 7 %, > 15 % 14 %
Capacitor feederI_n = Q / (√3 · U) ; breaker ≥ 1.5 I_n ; cable ≥ 1.43 I_nIS 13340:1993 / IEC 60831-1:2014 cl. 20 (1.3 × I_n continuous overload) and cl. 21 (1.1 × U_n); IEC 61921:2017 cl. 7.3 (switching & protection)Capacitor-duty contactors with pre-charge resistors; discharge to ≤ 50 V in 1 min (IS 13340) / 75 V in 3 min (IEC 60831-1 cl. 22)
APFC stepssteps 1:1:2:2… ; smallest step sets relay C/KIEC 61921:2017 cl. 5 (automatic banks)12-step relay typical
Active harmonic filter currentI_h = I_load · share_nl · THD_nl ; I_allowed = I_load · THD_target ; I_AHF = √((I_h − I_allowed)² + I_q²) · (1 + margin)IEEE 519-2022 Table 2 (current distortion limits at PCC: TDD 5 % for I_sc/I_L < 20 … 20 % for > 1000) and Table 1 (voltage THD 8 % ≤ 1 kV); IEC 61000-3-6AHF rating = rms harmonic current injected; CT class 1, ratio ≥ 1.2 × I_load

Standards and code references

StandardTitleUsed for
IS 13340:1993 / IEC 60831-1Shunt capacitors of the self-healing type for a.c. systems up to 1000 VCapacitor rating, 1.3 × In continuous overcurrent, feeder ≥ 1.5 × In
IS 13341:1992 / IEC 60831-2Shunt capacitors — Ageing test, self-healing test and destruction testCapacitor duty
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationspf ≥ 0.95 (cl. 3.8.1), harmonics (5.3.6.6), full neutral (8.2.9.1)
IEC 61921:2017Power capacitors — Low-voltage power factor correction banksAPFC bank design, step switching, detuned reactors, discharge ≤ 50 V in 1 min
IEEE 519-2022Harmonic control in electric power systemsTHD limits at PCC (voltage 5–8 %, current 5–20 % by Isc/IL); active filter target THD-I
IEC 61000-3-6:2008EMC — Assessment of emission limits for distorting loads (MV/HV)Harmonic emission assessment
IEC 60364-5-52:2009Low-voltage electrical installations — Selection and erection of wiring systemsCurrent-carrying capacity, derating (temperature, grouping, installation method), voltage drop ≤ 3–5 %
Prepared by
Checked by
Approved by

Results are design aids computed by designlink calc (calc.designlink.in). Verify with capacitor / reactor / AHF manufacturer data and the utility's pf tariff before issue.