USER GUIDE

Energy consumption & bill

Monthly kWh of a load list, maximum demand and the bill on your slab tariff with demand charge and duty.

Tariff order

How to use it

  1. Enter the inputs on the left — defaults are a typical case; every field has a note.
  2. Results, checks (PASS / CHECK) and worked steps appear on the right as you type; Drawing and 3D tabs where the calculation has a layout.
  3. Save the project, then export the Report, Excel with formulas.

Inputs

FieldType / defaultMeaning
Loads
One load per line: name, kW each, quantity, hours/day, days/month, demand factor (optional)text default LED lighting, 0.036, 120, 10, 26, 1 Split AC 1.5 TR, 1.6, 12, 8, 26, 0.8 Computers, 0.15, 40, 9, 26, 0.9 Water pump, 3.7, 2, 3, 30, 0.5 Lift, 11, 1, 4, 30, 0.6
Tariff
Energy slabs — upper kWh:₹/kWh, the last *:ratetext default 500:6.5, 2000:7.5, *:8.5
Demand / fixed chargenumber (₹ per kVA per month) default 250
Contract demandnumber (kVA) default 60
Billed demand at leastnumber (% of contract demand) default 75
Average power factornumber default 0.95
Fuel / power-purchase adjustmentnumber (₹/kWh) default 0.3
Electricity dutynumber (% of energy + demand) default 5

What you get

OutputContent
Results, checks, worked steps, schedules; report, Excel and DXF exports.

Standards applied

Good to know