USER GUIDE

Lift traffic analysis (up-peak)

Number, size and speed of passenger lifts from the round trip time, interval and 5-minute handling capacity — with zoning and the lift load for the SLD.

CIBSE Guide D

How to use it

  1. Enter the inputs on the left — defaults are a typical case; every field has a note.
  2. Results, checks (PASS / CHECK) and worked steps appear on the right as you type; Drawing and 3D tabs where the calculation has a layout.
  3. Save the project, then export the Report, Excel with formulas.

Inputs

FieldType / defaultMeaning
Building
Building typechoice default office
Office (single tenant), Office (multi tenant), Hotel, Residential, Hospital (passenger lifts)
Floors served above the main lobbynumber default 12
Interfloor heightnumber (m) default 3.6
Population fromchoice default area
Net area per floor ÷ density, Persons per floor
Net usable area per floornumber (m²) default 1200
Occupancy density (0 = typical for the type)number (m²/person) default 0
Persons per floornumber default 100
Occupancy at the peak (0 = typical)number (%) default 0office ≈ 80 % (absenteeism), typical
Express travel to the first served floor (high zone)number (m) default 0
Lifts
Rated load (0 = select)choice default 0
Select automatically, 630 kg (8 persons), 800 kg (10 persons), 1000 kg (13 persons), 1275 kg (17 persons), 1600 kg (21 persons), 1800 kg (24 persons), 2000 kg (26 persons) …
Rated speed (0 = by travel)choice default 0
By travel height (typical), 1 m/s, 1.6 m/s, 2 m/s, 2.5 m/s, 3.5 m/s, 5 m/s, 6 m/s
Number of lifts (0 = select)number default 0
Average car load at up-peaknumber (%) default 8080 % of the rated persons (CIBSE practice)
Accelerationnumber (m/s²) default 1.0typical 0.8–1.2
Door opening timenumber (s) default 2.0centre opening 1100 mm ≈ 2 s (typical)
Door closing timenumber (s) default 3.0typical
Start delaynumber (s) default 0.5typical
Passenger transfer time (each way)number (s) default 1.2typical 1.0–1.2
Targets and load
Target 5-minute handling capacity (0 = typical for the type)number (%) default 0
Target interval (0 = typical for the type)number (s) default 0
Counterweight balancenumber (%) default 5045–50 % typical
Drive + machine efficiencynumber (%) default 80gearless VVVF ≈ 80–85 % (typical)
Supply power factornumber default 0.9
Patterns, sizes and code checks
Code regimechoice default nbcs
India — NBCS 2026, International — CIBSE Guide D / ISO 8100 / EN 81
Traffic pattern to checkchoice default auto
By building type, Morning up-peak, Down-peak, Mid-day (lunch) two-way, Inter-floor
Lunch split in / out / inter-floortext default 45,45,10percent
Lift class (sizes)choice default auto
By building type, Passenger, Residential, Hospital bed / stretcher, Goods, Fire lift, Accessibility lift
Drivechoice default auto
By speed (MRL up to 2 m/s), Traction with machine room, Machine-room-less, Hydraulic

What you get

OutputContent
Results, checks, worked steps, schedules; report, Excel and DXF exports.

Standards applied

Good to know