Annual harvest, first flush, storage, recharge pit count.
IS 15797 · CGWB
| Field | Type / default | Meaning |
|---|---|---|
| Catchment | ||
| Design regime | choice default india | India — NBCS 2026 Part E Sec 2 (EN 12056-3 shown alongside), International — BS EN 12056-3 only |
| Indian code edition | choice default nbcs2026 | NBCS 2026 (SP 7:2026) — C 0.9 / 0.8 / 0.3 / 0.15, Table 25, Table 26, NBC 2016 Part 9 Sec 2 (superseded) — same C, Table 23 / 24 values |
| Roof area (plan) | number (m²) default 1200 | |
| Paved area | number (m²) default 800 | |
| Unpaved ground | number (m²) default 0 | |
| Lawns / parks / green area | number (m²) default 1000 | |
| Annual rainfall | number (mm) default 800 | |
| Monthly rainfall pattern | choice default sw | SW monsoon (most of India), NE monsoon (Tamil Nadu / coastal AP), Both monsoons (Kerala / coastal Karnataka), Uniform through the year |
| Design storm intensity (drainage / recharge) | number (mm/h) default 75 | NBCS E2 4.5.11.2.3 / 4.5.11.2.5: from IMD / IRC data for a very short time of concentration — no fixed national minimum; 100–150 mm/h for Mumbai / NE India |
| Storm duration for recharge | number (h) default 1 | |
| Harvesting | ||
| Storage for dry days (0 = first-flush + 1 day) | number (days) default 3 | |
| Non-potable demand | number (L/day) default 20000 | |
| First flush | number (mm) default 2 | |
| Roof drainage | ||
| Number of downpipes | number default 8 | |
| Down-pipe material | choice default pvc | PVC / HDPE (NBCS Table 25 × 1.44), Cast iron / GI (Table 25 as printed) |
| Gutter type | choice default half | Half-round eaves gutter, Box / valley gutter |
| Recharge | ||
| Soil | choice default loam | Sandy (infiltration 50 mm/h), Sandy loam (25 mm/h), Silty loam (10 mm/h), Clay (2 mm/h) |
| Recharge pit diameter | number (m) default 2 | |
| Pit depth | number (m) default 3 | |
| Recharge bore in each pit | yes / no default True | |
| Highest ground-water level below ground | number (m) default 15 | NBCS E2 4.5.12.4 (d): recharge wells end ≥ 5 m above the highest static water level |
| Output | Content |
|---|---|
| Results, checks, worked steps, schedules; report, Excel and DXF exports. | |