USER GUIDE

Rainwater harvesting

Annual harvest, first flush, storage, recharge pit count.

IS 15797 · CGWB

How to use it

  1. Enter the inputs on the left — defaults are a typical case; every field has a note.
  2. Results, checks (PASS / CHECK) and worked steps appear on the right as you type; Drawing and 3D tabs where the calculation has a layout.
  3. Save the project, then export the Report, Excel with formulas.

Inputs

FieldType / defaultMeaning
Catchment
Design regimechoice default india
India — NBCS 2026 Part E Sec 2 (EN 12056-3 shown alongside), International — BS EN 12056-3 only
Indian code editionchoice default nbcs2026
NBCS 2026 (SP 7:2026) — C 0.9 / 0.8 / 0.3 / 0.15, Table 25, Table 26, NBC 2016 Part 9 Sec 2 (superseded) — same C, Table 23 / 24 values
Roof area (plan)number (m²) default 1200
Paved areanumber (m²) default 800
Unpaved groundnumber (m²) default 0
Lawns / parks / green areanumber (m²) default 1000
Annual rainfallnumber (mm) default 800
Monthly rainfall patternchoice default sw
SW monsoon (most of India), NE monsoon (Tamil Nadu / coastal AP), Both monsoons (Kerala / coastal Karnataka), Uniform through the year
Design storm intensity (drainage / recharge)number (mm/h) default 75NBCS E2 4.5.11.2.3 / 4.5.11.2.5: from IMD / IRC data for a very short time of concentration — no fixed national minimum; 100–150 mm/h for Mumbai / NE India
Storm duration for rechargenumber (h) default 1
Harvesting
Storage for dry days (0 = first-flush + 1 day)number (days) default 3
Non-potable demandnumber (L/day) default 20000
First flushnumber (mm) default 2
Roof drainage
Number of downpipesnumber default 8
Down-pipe materialchoice default pvc
PVC / HDPE (NBCS Table 25 × 1.44), Cast iron / GI (Table 25 as printed)
Gutter typechoice default half
Half-round eaves gutter, Box / valley gutter
Recharge
Soilchoice default loam
Sandy (infiltration 50 mm/h), Sandy loam (25 mm/h), Silty loam (10 mm/h), Clay (2 mm/h)
Recharge pit diameternumber (m) default 2
Pit depthnumber (m) default 3
Recharge bore in each pityes / no default True
Highest ground-water level below groundnumber (m) default 15NBCS E2 4.5.12.4 (d): recharge wells end ≥ 5 m above the highest static water level

What you get

OutputContent
Results, checks, worked steps, schedules; report, Excel and DXF exports.

Standards applied

Good to know