MBBR / ASP / SBR / MBR train, layout, GA DXF, P&ID, live Excel and 3D.
CPHEEO · CPCB 2019
| Field | Type / default | Meaning |
|---|---|---|
| Design basis | ||
| Daily average sewage flow | number (kL/day) default 1600 | Design capacity. From the Water tool: 80 % of the domestic water demand (CPHEEO return factor; demand per NBCS 2026 Part E Sec 1 cl. 4.1.1 / Table 1) plus any laundry / kitchen effluent. |
| Design working hours | number (h) default 24 | |
| Peak factor | number (×) default 2.5 | NCRPB para 3.2.5 / CPHEEO: 2.5 for small flows, 2.25 up to 50 000 population, 2.0 above |
| Raw sewage BOD (design) | number (mg/L) default 350 | Sheet: 250–450 mg/L range, 350 design |
| Raw sewage suspended solids | number (mg/L) default 300 | |
| Raw sewage COD | number (mg/L) default 650 | |
| Oil & grease | number (mg/L) default 75 | |
| Treated effluent standard | choice default reuse5 | Reuse — BOD < 5, SS < 5, COD < 50 (flushing / HVAC, sample), NGT / CPCB 2019 — BOD < 10, SS < 20, CPCB discharge — BOD < 20, SS < 30, COD < 100, CPCB general — BOD < 30, SS < 50 |
| Parallel treatment streams | number (nos) default 2 | Sample: two-stage STP 800 + 800 KLD — anoxic, MBBR and tube settler split in two streams |
| Process | ||
| Biological process | choice default mbbr | NBCS 2026 Part E Sec 2 cl. 4.13.3: EAASP, SBR, MBR, RBBR, MBBR (FBBR), SAFF …; packaged STPs (PSTP) to IS 18797:2024 (cl. 4.13.3 (j)) MBBR — anoxic + 2-stage moving bed (sample), Extended aeration (activated sludge), SBR — sequencing batch reactor, MBR — membrane bioreactor |
| Anoxic tank HRT | number (h) default 2 | CPHEEO detention 1–1.2 h (p. 208); sheet uses 2 h. 0 = no anoxic tank |
| MBBR media BOD loading rate | number (kg BOD/m²·d) default 0.02 | Bengtson, MBBR Wastewater Treatment Process p. 12; media manufacturer TDS |
| Media specific surface area | number (m²/m³) default 400 | PP Aqua / PVA gel manufacturer |
| Media fill fraction of tank volume | number (fraction) default 0.15 | Sheet 15 %; PP media typically 30–50 % |
| MBBR stages in series | number (nos) default 2 | |
| F/M ratio | number (kg BOD/kg MLSS·d) default 0.1 | Extended aeration 0.05–0.15 (CPHEEO) |
| MLSS | number (mg/L) default 3500 | ASP 3000–5000; MBR 8000–12000 |
| MLSS (MBR) | number (mg/L) default 9000 | |
| Membrane flux | number (LMH) default 20 | Hollow-fibre / flat-sheet MBR net flux 15–25 L/m²·h |
| SBR basins | number (nos) default 2 | |
| Cycles per basin per day | number (nos) default 4 | |
| Fill (decant) fraction of basin volume | number (fraction) default 0.3 | |
| Aeration (react) hours per basin per day | number (h) default 12 | Blowers are sized for the basins aerated at the same time |
| Decant time per cycle | number (h) default 1 | |
| Membrane scour air (SADm) | number (m³/m²·h) default 0.25 | Hollow-fibre 0.2–0.4; flat sheet 0.3–0.6 (vendor) |
| Oxygen per kg BOD removed | number (kg/kg) default 1.4 | |
| Oxygen transfer efficiency | number (%) default 14 | Fine-bubble diffusers at 4–5 m depth: 12–20 % |
| Tube settler surface overflow rate | number (m³/m²·d) default 35 | CPHEEO Table 5.8 secondary settling 25–40 m³/m²·d; tube settlers up to 60 |
| Tube-settler media height | number (m) default 0.75 | |
| Hydraulic units | ||
| Velocity through screen opening | number (m/s) default 0.9 | CPHEEO 0.6–1.2 m/s (ch. 5 p. 30); the sheet sizes the opening at 0.6 m/s |
| O&G chamber retention at peak | number (min) default 6 | KSPCB 5–10 min |
| Equalisation tank HRT | number (h) default 10 | EPC sheet 8–12 h; also ≥ peak flow × peak hours |
| Peak hours per day (EQT) | number (h) default 3 | |
| Clear water tank HRT | number (h) default 2 | |
| Excess sludge, fraction of BOD removed | number (fraction) default 0.35 | Sheet 30–35 % of BOD removed |
| Inorganic fraction of influent solids | number (fraction) default 0.25 | |
| Solids in settled sludge | number (%) default 1.0 | |
| Sludge storage | number (days) default 4 | Sheet: 4 days (screw-press backup) |
| Flushing / treated water tank | choice default nbcs | NBCS 2026 — 1 day of flushing demand in the tank + ½ day in the OHT (Part E Sec 1 cl. 4.4.10 (3)), Hours of average flow (reference sheet: 10 h), Capacity kL, None (treated water to drain) |
| Population using recycled flushing water (0 = from the flow) | number (persons) default 0 | 0 = Q ÷ (0.8 × 135 lpcd): the population whose sewage the plant treats (CPHEEO 80 % return; NBCS cl. 4.1.1) |
| Flushing demand | number (lpcd) default 30 | NBCS 2026 Part E Sec 1 cl. 4.1.1.1: 30 lpcd of the 135 / 100 lpcd (NBC 2016: 45) |
| Retention in flushing tank | number (h) default 10 | |
| Flushing tank capacity | number (kL) default 500 | |
| Soft water demand (0 = no softener / tank) | number (kL/day) default 240 | Sample: 240 kL soft water tank for HVAC make-up |
| Ultrafiltration polishing (UF plant) | yes / no default True | |
| UV disinfection | yes / no default True | |
| Irrigation / horticulture draw (0 = no irrigation pump) | number (kL/day) default 100 | |
| Equipment basis | ||
| Pump / filter operating hours per day | number (h) default 20 | |
| MGF / ACF filtration rate | number (m/h) default 16 | Metcalf & Eddy 5–25 m³/m²·h |
| Chlorine dose | number (mg/L) default 5 | |
| Hypochlorite solution strength | number (%) default 1 | |
| Screw press capacity | number (m³/h) default 3 | |
| Sludge recirculation, fraction of raw flow | number (fraction) default 0.65 | |
| Blower pressure provided | number (m WC) default 5 | |
| Mixing air for EQT / SHT | number (m³/h per m³) default 0.8 | Sheet: 80 % of tank volume per hour |
| Air per fine-bubble diffuser | number (m³/h) default 6 | |
| Incoming sewer and levels | ||
| Incoming sewer invert level at the STP | number (m (GL = 0)) default -1.0 | Invert of the gravity sewer where it enters the screen chamber, relative to the same datum as the tank top (GL / basement floor = 0). Sets the screen, O&G and EQT water levels; a deep invert makes the EQT deeper. |
| Incoming sewer size (0 = size it for the peak flow) | number (mm) default 0 | |
| Raw sewage transfer pumps | choice default auto | Auto — dry in the plant room unless the EQT is > 0.6 m deeper than the other tanks, Dry-installed in the plant room (flooded suction), Submersible in the EQT (guide rails) |
| Tank construction | ||
| Water depth (biological tanks) | number (m) default 4.5 | Sample 7 m deep tanks with walkway at −2.9; fine-bubble aeration 4–6 m |
| Maximum water depth (auto-deepen limit) | number (m) default 6.0 | |
| Free board | number (m) default 0.5 | |
| Cover / walkway slab above tanks (0 = open tanks with railing) | number (m) default 0.0 | Basement STP: walkway grating over the tanks; enter the earth cover for a buried plant |
| Wall thickness | number (m) default 0.3 | |
| Base slab thickness | number (m) default 0.35 | |
| Top slab / walkway thickness | number (m) default 0.25 | |
| Water depth of screen / O&G chambers | number (m) default 1.2 | |
| Space available (rectangle or irregular polygon) | ||
| Space given as | choice default rect | Rectangle L × B, Polygon vertices (irregular), No constraint — size the footprint |
| Length available | number (m) default 60 | |
| Width available | number (m) default 26 | |
| Vertices x,y in metres, one per line or ';' separated | text default 0,0; 62,0; 62,28; 30,28; 0,12 | Any simple polygon; the tool finds the largest rectangle inside it (sample plot is a trapezium). |
| Preferred length (tanks along) | number (m) default 60 | |
| Plant (pump) room width — minimum | number (m) default 8 | Pumps stand along the tank walls in front of the tank they draw from; blowers, filters, UF, screw press, dosing and panel in rows with 1 m aisles. The room grows to take them. |
| Allow the plant room to widen to fit the equipment | yes / no default True | Off: the width stays as entered and the room only gets longer |
| Arrangement | choice default auto | Auto — smallest footprint, Plant room along one side of the tanks, Central plant room, streams on both sides |
| Long axis | choice default auto | Auto (best fit), Along the longer side, Along the shorter side |
| Deepen the tanks (up to the maximum) if the space is short | yes / no default True | |
| Output | Content |
|---|---|
| Sizing | every unit process (MBBR / ASP / SBR / MBR with its own equipment), blowers, pumps, dosing |
| Layout & levels | compact plan with every tank on the plant room, equipment always inside, hydraulic profile from the incoming sewer invert |
| Piping & sleeves | suctions, deliveries, headers, air, gravity legs with DN; sleeve schedule with CL / invert and wall elevations |
| Drawings | plan, sections, sleeve elevations, P&ID, 3D, DXF, Excel |