Storage, fire tank compartments, pump sets, laid into your plot with DXF and 3D.
NBCS 2026 Parts E & F · IS 3370
| Field | Type / default | Meaning |
|---|---|---|
| Tank & site | ||
| Tank type | choice default ug | Underground: top slab below ground, pump room sunk to the tank floor for positive suction (as the sample). Over-ground / overhead: tank on the surface; pump room beside it. Underground (UGT), Over-ground (ground level), Overhead (OHT on structure) |
| Earth / landscape cover over top slab | number (m) default 0.0 | Depth of filling above the tank top slab (sample ≈ 1.8 m with landscape filling). 0 = top slab at ground. |
| Staging height (floor of tank above ground) | number (m) default 12.0 | |
| Domestic demand & storage (NBCS 2026 Part E Sec 1 cl. 4.1 / 4.4.10) | ||
| Demand given as | choice default pop | Population × lpcd, Dwelling units by BHK × lpcd (NBCS 2026 cl. 4.1), Daily demand (kL/day) |
| Population served | number (persons) default 2560 | |
| Dwelling units by BHK | text default 1BHK:0, 2BHK:128, 3BHK:384 | NBCS 2026 Part E Sec 1 cl. 4.1 (a): 1 BHK 3, 2 BHK 4, 3 BHK 5, 4 BHK and above 6 persons; EWS 4, studio 2 (Note 3). Example: 1BHK:20, 2BHK:40, 3BHK:30, studio:10 |
| Per-capita demand | number (lpcd) default 135 | NBCS 2026 Part E Sec 1 cl. 4.1.1: 135 lpcd urban residential incl. 30 flushing (100 with water-efficient fixtures, 70 rural). Table 1 (per head / bed / seat): hotel ≤ 3-star 180, 4-star+ 320, with bathtub 380; hospital ≤ 100 beds 340, > 100 beds 450, secondary care 800, super-speciality 950; office 45; hostel 135; restaurant 70 / food court 35 per seat; mall staff 45, visitors 15 |
| Daily demand | number (kL/day) default 345.6 | |
| Domestic storage | choice default code | NBCS 2026 Part E Sec 1 cl. 4.4.10 (2) and Notes 2–3. The domestic supply type (hydro-pneumatic / transfer to OHT) is set under Treatment & plumbing pumps. The code edition is set in the fire-water group. From the code edition — NBCS 2026: UGT 1½ d + OHT ½ d (roof tank) or UGT 2 d (hydro-pneumatic); NBC 2016: 1 day, Days and UG share entered below |
| Storage (days of demand) | number (days) default 1.0 | NBCS 2026 cl. 4.4.10: 2 days in all (UGT 1½ + OHT ½, or UGT 2 with a hydro-pneumatic system); NBC 2016 Pt 9 Sec 1 cl. 4.4.10 Note: one day (⅔ UG + ⅓ OH minimum) |
| Share kept in the UGT / sump | number (fraction) default 1.0 | 1.0 = all in the sump (hydro-pneumatic, no roof tank). NBCS 2026 with a roof tank: 0.75 of 2 days (1½ d UG + ½ d OH); NBC 2016 cl. 4.4.10 Note (c) minimum ⅔ / ⅓ of one day. |
| Treatment train (raw water tank → MGF → ACF → treated / domestic tank) | yes / no default True | |
| Share of UG storage in the raw-water tank | number (fraction) default 0.5 | Sample: raw 173 kL + domestic 173 kL. Raw tank should hold ≥ 4 h of filter throughput. NBCS cl. 4.4.10 (2): raw + treated UGTs together hold the 1½ day. |
| Flushing (recycled STP water) tank | choice default kl | With dual plumbing the fresh-water demand drops by the flushing share (30 of the 135 lpcd, NBCS cl. 4.1.1.1). Capacity entered below (0 = none), From the population — 1 day of flushing demand in the UGT + ½ day in the OHT (NBCS cl. 4.4.10 (3)) |
| Separate flushing (recycled) water tank | number (kL) default 0 | 0 = none. Enter the treated-sewage (STP) flushing storage if the building has dual plumbing. |
| Flushing demand | number (lpcd) default 30 | NBCS 2026 cl. 4.1.1.1: 30 lpcd (NBC 2016: 45); rural 15 |
| Peak factor for the transfer / hydro-pneumatic pumps | number (×) default 2.5 | CPHEEO: 2.5–3.0 on the average hourly demand |
| Pumping hours per day (domestic) | number (h) default 16 | |
| Fire water (NBCS 2026 Part F Table 7A–7M / NBC 2016 Pt 4 Table 7) — please confirm the capacity | ||
| Code edition (fire water; also the domestic storage rule) | choice default nbcs2026 | NBCS 2026 replaced NBC 2016 on 30 April 2026; use NBC 2016 where the local bye-laws still refer to it. Domestic storage: NBCS Part E cl. 4.4.10 vs the NBC 2016 Pt 9 cl. 4.4.10 Note minimum (one day). NBCS 2026 (SP 7:2026) — occupancy → level of protection, NBC 2016 — Part 4 Table 7 by occupancy and height |
| Fire tank capacity | choice default manual | The code value is always shown in the results for comparison. Enter capacity (confirm with the fire authority), From the code (edition above) |
| Building height | number (m) default 45 | Height of the topmost floor above grade (NBC 2016 Table 7 height rows of the occupancy; NBCS 2026 rows of Table 7A–7J) |
| Occupancy (NBCS 2026 Table 7A–7J row; mapped to the NBC 2016 Table 7 group) | choice default E | Lodging and rooming houses (A-I), Dormitories (A-II), Apartment houses (A-III), Hotels (A-IV), 3 / 4 star hotels (A-IV), Starred (franchise / 5 star) hotels (A-V), Educational (B), Nursing homes and sanatoria (C) … |
| Largest floor area (built-up / covered area for industrial / storage) | number (m²) default 2000 | NBCS Table 7A–7F rows go by the floor area on any single floor, 7G / 7H by the built-up area; NBC 2016 Table 7: hotels by the floor area on any floor, industrial / storage by the covered area, mercantile G + 1 by the total floor area. |
| NBC 2016 Table 7 group | choice default auto | auto = from the occupancy above (e.g. apartments → A-3 / A-4, hotels → A-5); set A-2, D-6 or MLCP here. auto — from the occupancy above, A-1 — Lodging and rooming houses (A-1), A-2 — One or two family private dwellings (A-2), A-4 — Dormitories (A-3) and apartment houses (A-4), A-5 — Hotels (A-5), A-6 — Hotels, starred (A-6), B — Educational buildings (B), C-1 — Hospitals, sanatoria and nursing homes (C-1) … |
| Storeys incl. ground (0 = height ÷ 3.5 m + 1) | number default 0 | NBC 2016 Table 7 low rows: G + 1 = 2 storeys (hospitals, mercantile, storage, hotels Note 7). |
| Basement area | number (m²) default 0 | NBC 2016 Table 7 Notes 5 / 6: bracketed terrace-tank and terrace-pump values are added where the basement exceeds 200 m². |
| Persons (custodial / assembly below 10 m) | number default 0 | |
| Rooms (lodging houses A-1) | number default 0 | |
| Hospital with beds (C-1) | yes / no default True | |
| Plot area (hospitals below 15 m) | number (m²) default 0 | |
| EV parking / charging in the podium or basement (→ CL-5) | yes / no default False | |
| Basement protected with sprinklers (→ at least CL-3) | yes / no default False | |
| Storage: building ridge height (0 = not applicable) | number (m) default 0 | |
| Level of protection | choice default auto | Set it where the fire authority asks for another level, or for rows that say 'hydraulic calculations'. From the table (occupancy, height, area), CL-1, CL-2, CL-3, CL-4, CL-5, CL-6, CL-7 … |
| Fire-fighting duration (0 = lower end of the level's range) | number (min) default 0 | Table 7K / 7M Note 2: 30–120 min by hazard, fire preparedness and local conditions (CL-1…3 / HL-1…3: 30–60; others 60–120). |
| Fire static tank capacity | number (kL) default 600 | |
| Additional fire storage (local authority / sprinkler duration) | number (kL) default 0 | Added to the NBC minimum, e.g. sprinkler demand × duration where larger (IS 15105 Table 4) |
| Maximum size of one fire compartment | number (kL) default 200 | Sample: 3 × 200 kL interconnected compartments. At least two compartments so one can be cleaned. |
| Sprinkler system (separate sprinkler pump set) | yes / no default True | |
| Water-curtain / drencher pump set | yes / no default True | |
| Water-curtain pump duty | number (LPM) default 6230 | |
| Water-curtain pump head | number (m) default 75 | |
| Main fire pump duty (0 = from the code) | number (LPM) default 0 | NBCS 2026 Table 7K / 7M pump for the level (e.g. CL-4 2 500, CL-5 3 785 LPM); NBC 2016 Table 7 Notes 14 / 10 / 11 / 12: 1620 / 2280 / 2280 × 2 / 2850 × 2 LPM by occupancy row. Electric main + 100 % standby. |
| Main fire pump head | number (m) default 110 | Static height + friction + 3.5 bar residual at the topmost landing valve (take from the Fire tool) |
| Jockey pump duty | number (LPM) default 180 | |
| Terrace (overhead) fire tank — reported only | number (kL) default 0 | 0 = NBC 2016 Table 7 col. 12 value; NBCS 2026 gives no terrace-tank size (down-comer from the terrace tank, Part F cl. 2.10) |
| Tank construction | ||
| Water depth | number (m) default 3.5 | Sample 3.5 m. Deeper tanks save plan area; check with the structural engineer (IS 3370). |
| Maximum water depth allowed (auto-deepen limit) | number (m) default 5.0 | |
| Free board | number (m) default 0.3 | |
| Wall thickness | number (m) default 0.3 | IS 3370: ≥ 150 mm; 250–300 mm typical for 3.5–4.5 m deep tanks |
| Base slab thickness | number (m) default 0.3 | |
| Top slab thickness | number (m) default 0.25 | |
| Drain sump in each tank — width | number (mm) default 600 | |
| Drain sump depth | number (mm) default 300 | |
| Manhole cover diameter | number (mm) default 560 | |
| Access cut-out in the RCC wall between tank and pump room | text default 1000 × 900 | |
| Space available (rectangle or irregular polygon) | ||
| Space given as | choice default rect | Rectangle L × B, Polygon vertices (irregular), No constraint — size the footprint |
| Length available | number (m) default 84 | |
| Width available | number (m) default 14 | |
| Vertices x,y in metres, one per line or ';' separated | text default 0,0; 60,0; 60,20; 30,20; 30,14; 0,14 | Any simple polygon, clockwise or anticlockwise; the tool finds the largest rectangle that fits inside it. |
| Preferred tank width (across) | number (m) default 14 | |
| Long axis | choice default auto | Auto (best fit), Along the longer side, Along the shorter side |
| Pump-room position | choice default mid | Between domestic and fire tanks (sample), At one end |
| Rows of domestic tanks across the width | number (nos) default 2 | Sample: domestic above raw water = 2 rows |
| Rows of fire compartments across the width (0 = one per compartment) | number (nos) default 0 | |
| Deepen the tanks (up to the maximum) if the space is short | yes / no default True | |
| Stretch the pump room to use the full length available | yes / no default False | Off: the structure takes only the length it needs (pump room up to 30 % longer than the equipment needs); the rest of the plot stays free. |
| Treatment & plumbing pumps | ||
| Filtration run hours per day | number (h) default 8 | Filter feed pump flow = treated demand ÷ run hours (sample 470 LPM) |
| Filtration rate (MGF / ACF) | number (m/h) default 16 | Pressure sand filters 10–20 m/h; ACF 15–25 m/h (CPHEEO) |
| Filter feed pump head | number (m) default 35 | |
| Transfer / hydro-pneumatic pump duty (0 = peak demand) | number (LPM) default 0 | |
| Transfer / hydro-pneumatic pump head | number (m) default 75 | Static lift to the highest fixture + friction + 10 m residual (take from the Water tool) |
| Domestic supply | choice default hp | Also sets the NBCS 2026 storage (cl. 4.4.10): hydro-pneumatic → UGT 2 days; transfer to OHT → UGT 1½ day + OHT ½ day Hydro-pneumatic (pressure vessels, no roof tank), Transfer pumps to the overhead tank |
| Pressure vessel diameter | number (mm) default 450 | |
| Ozonator | yes / no default True | |
| Chlorine dose | number (mg/L) default 2.0 | |
| Diesel day tank per diesel pump | number (L) default 990 | |
| Drainage-sump submersible pumps | number (nos) default 2 | |
| Output | Content |
|---|---|
| Sizing | storage, fire tank, treatment, pumps, ancillaries |
| Layout | plan, sections, 3D, DXF, Excel |