How to use it

  1. Draw or import nodes, pipes and buildings (demand by occupancy).
  2. Set the source (tank / pump / mains), pipe material and design standard.
  3. Run the pressurised-network solver; check residual pressures and velocities.
  4. Size storage and pumps; export report, DXF and Excel.

Inputs

FieldType / defaultMeaning
Buildingstype, units, floors
Networknodes with GL, pipes with length
Sourcetank level, pump head

What you get

OutputContent
Hydraulicsflow, velocity, head loss, residual per node
Sizingpipes, pump duty, storage

Standards applied