BMS design — I/O summary & DBR

Type or import the equipment schedule and the tool derives every point through published templates (Detailed or Generic profile): the I/O summary in the submission layout with Monitor / Control / Alarm and field-device columns, the field-device schedule, the soft-integration composition, the points needing confirmation and a complete Design Basis Report. Panels, architecture drawing and floor-wise panel SLDs follow from the same data.

ISO 16484 (Parts 1–6)ASHRAE Standard 135 / ISO 16484-5 (BACnet)ASHRAE Guideline 36ASHRAE Guideline 13Modbus Application Protocol V1.1b3 / Serial Line V1.02IEC 61131-2 / -3
What goes in, what comes out

You enter

  • Equipment schedule (rows or Excel)
  • Scope, profile, spare %, regime, protocols
  • DBR front matter

You get

  • I/O Summary Excel, field-device schedule
  • Design Basis Report (Word)
  • HTML report; panels, architecture and SLDs in the Panels tab

What it does

Equipment schedule inOne row per asset type with quantity, building, floor and zone; Excel import; pulls from the other tools later.
Point templatesDetailed or Generic profile per asset type — AI / DI / AO / DO / SI per unit and per plant, editable.
I/O SummarySubmission layout: roman sub-rows, Monitor / Control / Alarm, remarks, device columns, spare, notes.
Field devicesSensor, switch and transmitter counts by application, straight into the BOQ.
Design Basis ReportSeventeen sections with every table filled — architecture, I/O philosophy, narratives, integration, responsibility matrix.
Panels and drawings (next)Panel allocation by zone, architecture DXF, floor-wise panel SLDs, I/O cards, cable schedule.

Checks it performs

PASS / CHECKEvery point traceable to an asset on the schedule
PASS / CHECKSpare ≥ 15 % of each hardwired point type
PASS / CHECKCritical plant on a dual path (hardwired + protocol)
PASS / CHECKLife-safety plant commanded by the FAS only
PASS / CHECKNo Indian code cited in the international regime

Sample report

How to use it

  1. Set the scope (BMS, electrical SCADA or both), the template profile (Detailed or Generic), the spare % and the code regime.
  2. Build the equipment schedule: one row per asset type with quantity, building, floor and zone — or import the Excel schedule.
  3. Read the live I/O summary, the field-device schedule and the points requiring confirmation; adjust quantities or templates.
  4. Fill the DBR front matter (project, client, consultant, contractor, revision) and export the I/O Summary (Excel), the Design Basis Report (Word) and the report.
  5. Panels & architecture tab: choose the panel allocation (building → floor → zone, per system or fill), points per controller, controllers per panel, module sizes, panels per MS/TP trunk and trunks per NLC; floor ranges like G–3 spread the units. Read the system architecture, the floor-wise panel SLD sheets and each panel's I/O card layout, then export the Architecture & SLD (DXF) and Panels & cables (Excel: allocation, BOM, every channel, cable schedule with lengths).

What you enter

  • Equipment schedule — asset type, tag, qty, building / floor / zone, note
  • Policies — scope, profile, spare %, regime, protocols, controller sizing
  • DBR data — titles, parties, revision, background, references

What you get

  • I/O Summary (Excel) — R1 layout: sub-rows per point, Monitor / Control / Alarm, remarks, field-device columns, spare, notes
  • Design Basis Report (Word) — 17 sections with every table filled from the schedule
  • Report — HTML summary with the shared stylesheet

Also searched as

BMS I/O summary; BMS point list generator; building management system design; BMS DBR design basis report; I/O list for AHU chiller BMS; BMS points schedule excel. The same calculation, the same clauses — one tool for automation / elv design under the Indian codes (NBC, IS, CPWD) or the international ones (IEC, NFPA, ASHRAE, EN).

Standards applied

ReferenceTitleUsed for
ISO 16484 (Parts 1–6)Building automation and control systemsSystem design, hardware, functions, data communication (BACnet) for the BMS
ASHRAE Standard 135 / ISO 16484-5 (BACnet)Data communication protocol for building automation and control networksBackbone and controller network protocol
ASHRAE Guideline 36High-performance sequences of operation for HVAC systemsControl narratives for AHUs, plants and zones
ASHRAE Guideline 13Specifying building automation systemsPoint classification, spare capacity, graphics and alarm philosophy
Modbus Application Protocol V1.1b3 / Serial Line V1.02Modbus protocol specificationsThird-party integration of drives, meters, chillers, UPS and plant PLCs
IEC 61131-2 / -3Programmable controllers — equipment requirements and programming languagesPLC panels for tunnel / car-park ventilation, lighting and electrical SCADA
IEC 61439-1/2:2020 / IS/IEC 61439Low-voltage switchgear and controlgear assembliesPanel construction (TTA/PTTA), busbar short-time withstand (Icw 1 s), temperature rise, IP rating
IEC 62443 (series)Security for industrial automation and control systemsZones and conduits, user management, hardening of the automation network
IEC 61850Communication networks and systems for power utility automationSubstation SCADA — relays, IEDs, GOOSE / MMS
IEC 60870-5-104Telecontrol equipment and systems — network accessElectrical SCADA telecontrol over TCP/IP
NBCS 2026 (SP 7:2026) Part D Sec 2National Building Construction Standards — Electrical and allied installationsLoad assessment and diversity, circuits, cables (4-core), earthing, lightning protection, standby supply for fire & life-safety loads
NBCS 2026 (SP 7:2026) Part D Sec 3National Building Construction Standards — Air conditioning, heating and mechanical ventilationDesign conditions (Table 3), ventilation (Table 7), duct velocities (Table 18), clean rooms (Table 31), automation
NBCS 2026 (SP 7:2026) Part D Sec 5National Building Construction Standards — Lifts, escalators, moving walks and power-driven parkingLift traffic, fire-fighting lifts, controls
NBCS 2026 (SP 7:2026) Part D Sec 6National Building Construction Standards — Information and communication enabled installationsStructured cabling, Wi-Fi (IEEE 802.11ax/be), ICT spaces
NBCS 2026 (SP 7:2026) Part FNational Building Construction Standards — Fire and life safetyMeans of egress (Tables 2–4, cl. 4.4.2), staircase / lobby / lift-well pressurisation (cl. 4.4.2.5, Table 5), emergency lighting (cl. 3.5.6), fire-fighting installations by occupancy (Tables 7A–7J), demand, pumps and duration (Tables 7K / 7M), mains (Table 8), hydrant pressure 3.5–7 bar (cl. 5.1.1 f), sprinklers (cl. 5.1.3), gaseous suppression (cl. 5.1.6 / 5.1.9)
CEA (Measures relating to Safety and Electric Supply) Regulations, 2023Central Electricity Authority safety regulationsStatutory safety requirements for installations
IS 732:2019Code of practice for electrical wiring installationsVoltage-drop limits, cable selection, protection coordination (adopts IEC 60364)
IS 3043:2018Code of practice for earthingEarth bus, strip sizing, earthing of panels (future earthing tool)
CPWD General Specifications for Electrical Works Part VI (BMS)Building management system specificationPanels, cabling, controllers and head end for CPWD works

Frequently asked

How do I use the BMS design — I/O summary & DBR calculator?

Set the scope (BMS, electrical SCADA or both), the template profile (Detailed or Generic), the spare % and the code regime. Build the equipment schedule: one row per asset type with quantity, building, floor and zone — or import the Excel schedule. Read the live I/O summary, the field-device schedule and the points requiring confirmation; adjust quantities or templates.

Which codes and standards does the bms design follow?

It applies ISO 16484 (Parts 1–6), ASHRAE Standard 135 / ISO 16484-5 (BACnet), ASHRAE Guideline 36, ASHRAE Guideline 13, Modbus Application Protocol V1.1b3 / Serial Line V1.02, IEC 61131-2 / -3 and others. Every result line shows the formula and the clause it comes from, and the report lists the standards applied.

What does it check?

Every run is marked PASS or CHECK against: Every point traceable to an asset on the schedule; Spare ≥ 15 % of each hardwired point type; Critical plant on a dual path (hardwired + protocol); Life-safety plant commanded by the FAS only; No Indian code cited in the international regime.

Is the calculator free to use?

Yes — running the calculation, reading the results, checks and clauses is free. One design credit unlocks the report, Excel and DXF exports for 30 days; the first design is free on sign-in.

Can I see a sample report before I use it?

Yes, a complete sample report for this tool is published at https://calc.designlink.in/samples/bms/ — inputs, results with basis, checks, worked example, drawing and the standards list.

Is this the same as a BMS I/O summary?

Yes. People also call it a BMS point list generator, a building management system design, a BMS DBR design basis report. It covers the same calculation under automation / elv design, with the Indian and international code regimes selectable.

Does it work with AutoCAD or ZWCAD?

Yes — with the free DesignLink CAD plugin the tool reads rooms, layers and selections from the open drawing and places its DXF output straight back into the plan; without the plugin you upload a DXF and download the result.